Professional Documents
Culture Documents
RF Optimisation GTLtraining
RF Optimisation GTLtraining
Safe harbor
Neither the information nor any opinion expressed in this presentation constitutes an offer, or invitation to make an offer, or to buy any security issued by the company. This presentation contains
predictions, estimates or other information regarding the Company's operations which are forward looking in nature. While these forward looking statements represent our best current judgment on what the
future holds, they are subject to risks and uncertainties that could cause actual results to differ materially and may involve risk and uncertainty. This presentation is prepared for general purposes only and
does not have any regard to the specific investment objectives, financial situation and particular needs of any specific person. No liability for any loss will arise with the company as a result of the action
taken on the basis of information contained herein.
For a discussion of the risks and uncertainties that may cause results to differ, you should review GTLs filings with stock exchanges, including the annual report and quarterly disclosures.
Optimisation Overview
Network Lifecycle
Licence
Award
Swap
Management
(If required)
Network
Planning
Network Lifecycle
Continuous
Optimisation
Network
Rollout
Pre Launch
Optimisation
RF Optimisation
- BTS upgrade
Virtual Optimisation
- BTS re-homing Centre
- BSC re-parenting
- Transmission Re-engineering
Pre Launch
Optimisation
Objectives
Continuous
Optimisation
Swap
Management
Pre Launch
Optimisation
Site
Identification
RF Site
Audit
Coverage
Verification
Continuous
Optimisation
Reconfiguration
Parameter
verification
Fail
Swap
Management
Problem
Analysis
Site
Acceptance
Pass
Pre Launch
Optimisation
Cluster
Identification
Site
Identification
Cluster
Stimulation
Site
Acceptance
Cluster
Preparation
Continuous
Optimisation
Drive Test
Data Analysis
Reconfiguration
Fail
Swap
Management
Problem
Analysis
Cluster
Analysis
Pass
10
Cluster Analysis
Determine clusters for acceptance
Characterise performance
Drive Test
Results
Parameter Setting
Neighbors
Powered
Stable
Drive tests
OMC
Data
Simulation
Data
Process data
Call statistics
Key measurement events
Neighbor analysis
Key measurement data
Analysis
Remodelling
Reconfiguration
Parameters
Neighbors
Report Hardware
Requirements
11
Cluster Reconfiguration
Pre Launch
Optimisation
Continuous
Optimisation
Hardware
Optimisation
Cell parameter
optimisation
Antenna Reorientation
Handover parameters
Power planning
Antenna Relocation
Frequency planning
Masthead Amplifiers
Swap
Management
Performance Monitoring
12
Pre Launch
Optimisation
Off Site
Parameter
Analysis
Process Creation
Continuous
Optimisation
KPI Definition
KPI Reporting
Functionality
Asses
Training
Swap
Management
Config Management
On Site
Cluster
Identification
Cluster
Preparation
Drive Testing
Drive Analysis
Modelling
Network
Reconfigure
Cluster Monitoring
Model Calibration
13
KPIs to be Monitored
Based on performance of a Network & Cell
Network
Network /
Town Level
KPI
Target
(TBD : To Be Decided)
Type
CSR (%)
93%
Performance
CSSR (%)
95%
Performance
DCR (%)
5%
Performance
TCH Blocking
2%
Performance
3%
Performance
CSR (%)
90%
Performance
CSSR (%)
92%
Performance
DCR (%)
10%
Performance
TCH Blocking
4%
Performance
SDCCH Blocking
6%
Performance
KPI Deciding
Factor
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
SDCCH
Blocking
Cell Level
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
14
KPIs to be Monitored
Based on performance of a Network & Cell
Network
Network /
Town Level
KPI
Target
(TBA : To Be Accepted)
Type
Downlink Rx Qual
TBA
Performance
Uplink Rx Qual
TBA
Performance
FER
TBA
Performance
TBA
Performance
TBA
Performance
Data Through
output
KPI Deciding
Factor
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Data
Accessibility
Downlink Rx Qual
Uplink Rx Qual
Cell Level
FER
Data Through
TBA
TBA
TBA
TBA
output
Data Accessibility
TBA
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Performance
15
Reports
Deliverables
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
16
Reports
Traffic Statistics Analysis Report.
Pre Launch
Optimisation
Continuous
Optimisation
Acceptance Report.
Swap
Management
Interference Measurement.
Continuous Optimisation
Pre Launch
Optimisation
Objectives
Maintaining the traffic rate within medium to low
Continuous
Optimisation
Swap
Management
18
Continuous Optimisation
Pre Launch
Optimisation
Continuous
Optimisation
Customer Faults
Trouble Tickets
CM Data
Call Trace
Alarms
Network
Performance
Targets
Fault
Resolution
Service Level
OMC
Status
Performance
Cell
Prioritisation
Swap
Management
Fault
Reports
19
Pre Launch
Optimisation
Characterise performance
Ensure correct site configuration
Parameter Setting
Neighbors
Powered
Stable
Drive tests
Continuous
Optimisation
Process data
Call statistics
Key measurement events
Neighbor analysis
Key measurement data
Analysis
Swap
Management
Remodelling
Reconfiguration
Parameters
Neighbors
Report Hardware
Requirements
20
Cluster Reconfiguration
Pre Launch
Optimisation
Continuous
Optimisation
Hardware
Optimisation
Cell parameter
optimisation
Antenna Reorientation
Handover parameters
Power planning
Antenna Relocation
Frequency planning
Masthead Amplifiers
Swap
Management
Performance Monitoring
21
Continuous Optimization
Pre Launch
Optimisation
Off site
Audit
On Site
OMC Reporting
Benchmarking
Cell Prioritisation
Continuous
Optimisation
Process Control
Config
Management
Fault Resolution
KPI Definition
Drive testing
KPI Reporting
Swap
Management
Functionality
Asses
Training
Change
recommend
Network
Reconfigure
22
KPIs to be Monitored
Based on performance of a Network & Cell
Network
Network /
Town Level
KPI
Target
(TBD : To Be Decided)
Type
CSR (%)
93%
Performance
CSSR (%)
95%
Performance
DCR (%)
5%
Performance
TCH Blocking
2%
Performance
3%
Performance
CSR (%)
90%
Performance
CSSR (%)
92%
Performance
DCR (%)
10%
Performance
TCH Blocking
4%
Performance
SDCCH Blocking
6%
Performance
KPI Deciding
Factor
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
SDCCH
Blocking
Cell Level
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
23
KPIs to be Monitored
Based on performance of a Network & Cell
Network
Network /
Town Level
KPI
Target
(TBA : To Be Accepted)
Type
Downlink Rx Qual
TBA
Performance
Uplink Rx Qual
TBA
Performance
FER
TBA
Performance
TBA
Performance
TBA
Performance
Data Through
output
KPI Deciding
Factor
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Data
Accessibility
Downlink Rx Qual
Uplink Rx Qual
Cell Level
FER
Data Through
TBA
TBA
TBA
TBA
output
Data Accessibility
TBA
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Performance
24
Reports
Deliverables
Pre Launch
Optimisation
Continuous Optimisation
Continuous
Optimisation
Swap
Management
25
Reports
Worst cell optimization report
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Dynamic full and half rate, Cell load sharing,Hierarchy cell structure,
Dynamic allocation of SDCCH.
26
Swap Management
Pre Launch
Optimisation
Objectives
Continuous
Optimisation
Swap
Management
27
Swap Management
Pre Launch
Optimisation
Swap Planning
Default Parameter
Continuous
Optimisation
Parameter Mapping
Swap
Management
28
Pre Launch
Optimisation
Site
Identification
RF Site
Audit
Coverage
Verification
Continuous
Optimisation
Reconfiguration
Parameter
verification
Fail
Swap
Management
Problem
Analysis
Site
Acceptance
Pass
29
Pre Launch
Optimisation
Cluster
Identification
Site
Identification
Cluster
Stimulation
Site
Acceptance
Cluster
Preparation
Continuous
Optimisation
Drive Test
Data Analysis
Reconfiguration
Fail
Swap
Management
Problem
Analysis
Cluster
Analysis
Pass
30
Cluster Analysis
Determine clusters for acceptance
Drive Test
Results
Characterise performance
Ensure correct site configuration
OMC
Data
Simulation
Data
Parameter Setting
Neighbors
Powered
Stable
Drive tests
Process data
Call statistics
Key measurement events
Neighbor analysis
Key measurement data
Analysis
Remodelling
Reconfiguration
Parameters
Neighbors
Report Hardware
Requirements
31
Cluster Reconfiguration
Pre Launch
Optimisation
Continuous
Optimisation
Hardware
Optimisation
Cell parameter
optimisation
Antenna Reorientation
Handover parameters
Power planning
Antenna Relocation
Swap
Management
Performance Monitoring
32
Swap Optimization
Pre Launch
Optimisation
Off Site
Parameter
Analysis
Process Creation
Continuous
Optimisation
KPI Definition
KPI Reporting
Functionality
Asses
Swap
Management
Training
Config Management
On Site
Cluster
Identification
Cluster
Preparation
Drive Testing
Drive Analysis
Modelling
Network
Reconfigure
Cluster Monitoring
Model Calibration
33
KPIs to be Monitored
Based on performance of a Network & Cell
Network
Network /
Town Level
KPI
Target
(TBA : To Be Accepted)
Type
CSR (%)
Improve
Performance
CSSR (%)
Improve
Performance
DCR (%)
Improve
Performance
TCH Blocking
Improve
Performance
Improve
Performance
KPI Deciding
Factor
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
SDCCH
Blocking
CSR (%)
CSSR (%)
Cell Level
DCR (%)
TCH Blocking
SDCCH Blocking
Improve
Improve
Improve
Improve
Improve
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Performance
34
KPIs to be Monitored
Based on performance of a Network & Cell
Network
Network /
Town Level
KPI
Target
Type
Downlink Rx Qual
Improve
Performance
Uplink Rx Qual
Improve
Performance
FER
Improve
Performance
Improve
Performance
Improve
Performance
Data Through
output
KPI Deciding
Factor
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Data
Accessibility
Downlink Rx Qual
Uplink Rx Qual
Cell Level
FER
Data Through
Improve
Improve
Improve
Improve
output
Data Accessibility
Improve
Performance
Performance
Performance
Performance
TBD upon
checking trend
to maintain the
performance of
the network
and to improve
Performance
35
Reports
Deliverables
Pre Launch
Optimisation
Swap Management
Swap Planning Report.
Parameter mapping report
Pre Drive Test Report
Continuous
Optimisation
Swap
Management
Subjects to Investigate
Non-Working sites/sectors or TRXs
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Capacity Problems
Other Interference Sources
Missing Neighbors
37
Subjects to Investigate
One-way neighbors
Pre Launch
Optimisation
Ping-Pong Handovers
Not happening handovers
Footprint and performance of the site as per design
criteria
Continuous
Optimisation
Faulty Installations
Sites not operational
Faulty TRX
BA list error
Swap
Management
38
Recommendations
Defining missing neighbor relations
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Pre Launch
Optimisation
Continuous
Optimisation
Swap
Management
Floor space:
Seating capacity:
Internet speed:
No. of RF engineers:
Total man years experience:
Tools used for VPO:
40
Pre Launch
Optimisation
Activities
Off shore
On shore
Benchmarking
Data Collection
Continuous
Optimisation
Swap
Management
41
Continuous
Optimisation
Swap
Management
Value Proposition
Risk Sharing - KPI & SLA Based Commitments
End to End RF solution provider
RF Planning, Design and Optimisation done for
31 networks
44
Case Study 1
On many occasions, it has been found that improper RF
cabling gave rise to wrong BCCH - Sector combination.
Corrections were initiated and post correction verifications have
been performed.
Business Challenge :
Hutch found RF Group of GTL a competent partner to
perform on their behalf optimization activities with
quality deliverables. In the process GTL got the
responsibility of around 240 sites (170 existing & 70
new sites) to be completed during October 2005 to
March 2006.
Project Scope :
GTL was to optimize new roll out cell sites in the
network to achieve desired results viz. call origination,
call termination, intra-cell handover, and coverage.
Value Delivered :
GTL successfully completed the optimisation activity for
the project covered 170 existing sites and 70 new sites during
Oct05 to Mar06.
All sites were either in Highways or in remote locations of
eastern part of UP covering Kanpur, Lucknow, Varanasi,
Allahabad and Gorakhpur.
45
Case Study 2
Project Scope :
About the Client :
Hutch is one of the leading gsm operator in India
having licenses spanning all over India. Hutch is
working with gsm 900 band and wants to expand their
network as the demand grow. So to meet quality and
coverage there is need to swap old ZTE system with
some new updated system, which can support the
gsm, gprs, edge and easily upgraded to 3G.
Hutch selected Nokia as OEM for the core part of their
network.
Business Challenge :
Nokia wanted to have resources in the outsourcing
domain increase their strength. As GTL had done lots
of work with Nokia in India so GTL seems to be
perfectly poised to rise to the need. We became
partner of choicer for Nokia to perform RF tasks in the
swap roll out process. From March 2005 to Till Date
for performed allocated tasks creditably. A few points
of project:
GSM 900 Networks.
45 sites to be swap from ZTE to Nokia.
342 New Nokia Ultra BTS
Coverage includes cities and boundaries.
Network with 19 BSCs and two switch AXE 10 from
Nokia.CSSR 94%, SDCCH Drop 2%, Handover success
rate 94%, Call drop rate 2.5%.
Value Delivered :
All swaps are mostly conducted at night there is around 6 sites
swap per day. As soon as swap sites bring on air our drive test
is ask to conduct the site verification drive test at each cell the
test includes database verification, sector swapping, handover
testing, neighbor list verification, call termination. After
finishing the swap now optimization is started on network level,
to meet the KPI daily statistic report are generated with the
help of Business object and results are discussed with the
customer and also suggest the necessary changes.
46
Government Of
Maharashtra
Power Grid
Corp
47
International Presence
Europe:
UK
France
Ireland
Sweden
Switzerland
Americas:
US
Middle East:
AsiaPacific:
UAE
KSA
Oman
Qatar
Kuwait
Malaysia
Thailand
China
Taiwan
Indonesia
Australia
Singapore
Philippines
New Zealand
South Asia
Africa:
Nigeria
South Africa
Guinea Conakry
Mauritius
India
Nepal
Bhutan
Maldives
Sri Lanka
Bangladesh
International Office
Projects Undertaken
48
Thank you