You are on page 1of 1

Following changes to be carried out during releasing of drawings for outside

fabrication.
1.) Inlet/Outlet Pressure gauge / Conductivity meter to be shifted after inlet valve and
before outlet valve.
2.) Davit type for manhole to be removed.

You might also like