06-04-2015
IGEQ/2015/054
Eng. Emad Magd
Supply & Install AC-Split Type/Window for Villa Al-Assiri

Dear Sir,
Greetings.
With reference to the above subject and project we are pleased to submit our offer as per the
scope mentioned below.
Please see attached BOQ
Option 1
Description
1
5 Tr Split Type AC
2
Tr Split Type AC
3
5Tr Split Type AC
4
Tr Split Type AC
5
5 Tr Window Type
TOTAL
Option 2
Description
1
5 Tr Split Type AC
2
3
4
5

Tr Split Type AC
5Tr Split Type AC
Tr Split Type AC
5 Tr Window Type
TOTAL

Nos.
5
8
2
2
7

Unit Price
3,500.00
4,200.00
4,900.00
5,400.00
2,100.00

Nos.
5

Unit Price
4,900.00

Amount
24,500.00

Brand
Emadi General

5,200.00
6,000.00
6,900.00
2,100.00

41,600.00
12,000.00
13,800.00
14,700.00
106,600.00 QR

Emadi General
Emadi General
Emadi General
Emadi General

8
2
2
7

Amount
17,500.00
33,600.00
9,800.00
10,800.00
14,700.00
86,400.00 QR

Brand
Gree Thailand
Gree Thailand
Gree Thailand
Gree Thailand
Gree Thailand

VALIDITY
Our offer is valid for your acceptance for a period of one week from the date of our offer and
subject to written confirmation thereafter.
PAYMENT TERMS:
-50% Advanced Payment
-50% after installation
Execution:
-Execution period will be as per project scheduled time.

Warranty:
The equipment would carry warranty of 5 years from the date of commissioning against
manufacturing defects only in Doha.
TERMS AND CONDITION:

1. The prices quoted for equipment/ materials are based on the makes specified
against each. Should an instruction be received at a later stage for a different
make equipment/ material (than the one offered) the difference in prices between
the two makes will be claimed by International Group.
2. Any hold ups/ stoppages in the works for any length of period after mobilization
due to non-availability of fronts to International Group will be considered as
Idling Time
3. Proper lighting and working conditions shall be provided by the client/ Main
contractor.
4. Water, electricity, store, site office shall be provided free of cost.
5. Any safety clearances shall be achieved by Client/ Contractor before
commencing of jobs.
6. Any excavation, backfilling & civil works are not included.
We trust our proposal will meet your requirement and would be glad to provide any
further information on request.
Your acceptance/approval on this subject matter will be highly appreciated.

Best Regards.
For INTERNATIONAL GROUP
Eng. Amr Fatouh
Executive Manager