CONSTRUCTION OF FOUR LANING OF AMRITSAR - PATHANKOT SE

FROM KM.57.900 (End of Dhariwal by pass) to Km.108.502 Package - 2 in

SUMMARY OF CONCRETE MIX DESIGN WITH ULTRATE


Sl.
No.

Concrete
Grade

Trial Mix
Date

Trial Mix No.

M15 PCC

05.12.12

T.M- 36 A

M20 PCC

M20 Kerb

M20 RCC

M25 RCC

M30 RCC

M35 RCC

M40 RCC & PSC

05.12.12

06.12.12

06.12.12

04.12.12

04.12.12

11.12.12

03.12.12

Propertion

Cement
(Kg.)

SSD

Coarse
Agg.

Fine
Agg.

Water (Kg)

Admixture
(KG)

20 mm
(Kg)

10 mm
(Kg)

Sand
(Kg)

280

767.380

511.586

773.960

140.000

3.36

Dry

280

761.701

507.749

762.351

161.125

3.36

SSD

290

759.386

506.257

765.898

145.000

3.77

Dry

290

753.767

502.460

754.410

165.905

3.77

SSD

290

450.790

676.486

911.758

142.100

2.61

Dry

290

447.454

671.412

898.082

164.186

2.61

SSD

310

758.387

505.591

764.890

139.500

3.72

Dry

310

752.775

501.799

753.417

160.377

3.72

SSD

330

741.400

494.267

747.758

148.500

4.29

Dry

330

735.914

490.560

736.542

168.910

4.29

SSD

360

727.412

484.941

733.649

154.800

3.96

Dry

360

722.029

481.304

722.644

174.825

3.96

SSD

410

732.311

488.207

677.851

155.800

4.51

Dry

410

726.892

484.545

667.683

175.048

4.51

SSD

420

713.762

475.841

689.812

159.600

4.62

T.M- 35 B

T.M- 38

T.M- 39

T.M- 33 C

T.M- 34 A

T.M- 42

T.M- 30

M40 RCC & PSC

M45 RCC & PSC

03.12.12

01.12.12

T.M- 30
Dry

420

708.480

472.272

679.465

178.798

4.62

SSD

450

725.091

483.394

671.168

148.500

5.40

Dry

450

719.725

479.769

661.100

167.559

5.40

T.M- 29 A

ANKOT SECTION OF NH-15


ckage - 2 in the state of Punjab

TRATECH CEMENT OPC-53


60
90 Min.
Min.

Compressive
Strength
7
28
Days
Days

150

100

60

22.73

27.78

Approved

170

140

100

60

27.56

31.78

Approved

0.9

90

60

30

25.11

32.22

Approved

0.45

1.2

190

150

120

85

26.25

32.91

Approved

62 :,38

0.45

1.3

Collaps

180

150

110

30.24

40.22

Approved

62 :,38

0.43

1.1

Collaps

190

150

110

34

44.66

Approved

64 :,36

0.38

1.1

Collaps

190

160

120

37.51

63:,37

0.38

1.1

Collaps

180

140

110

40.71

Slump Observation

CA:FA
Ratio

W/C
Ratio

Admixture
Dosage
(%)

62 :,38

0.5

1.2

180

62 :,38

0.5

1.3

55 :,45

0.49

62 :,38

Initial

30 Min.

Status

Approved

54.91

Approved

63:,37

0.38

1.1

Collaps

180

140

110

40.71

54.91

Approved

64 :,36

0.33

1.2

Collaps

190

150

120

45.98

61.78

Approved

CONSTRUCTION OF FOUR LANING OF AMRITSAR - PATHANKOT SEC


FROM KM.57.900 (End of Dhariwal by pass) to Km.108.502 Package - 2 in

SUMMARY OF CONCRETE MIX DESIGN WITH ULTRATECH CEMENT


Coarse
Agg.
Sl.
No.

Concrete
Grade

M35 RCC

M40 RCC & PSC

M45 RCC & PSC

Trial Mix
Date

17.12.12

18.12.12

12.12.12

Trial Mix No.

Fine
Agg.
Water (Kg)

Admixture
(KG)

748.766

128.000

2.40

491.221

737.535

148.437

2.40

751.393

500.928

742.719

131.200

2.26

410

745.833

497.171

731.578

151.658

2.26

SSD

430

731.408

487.606

737.680

129.000

2.15

Dry

430

725.996

483.949

726.615

149.135

2.15

Propertion

Cement (Kg.)

SSD

20 mm
(Kg)

10 mm
(Kg)

Sand
(Kg)

400

742.400

494.933

Dry

400

736.906

SSD

410

Dry

T.M- 48

T.M- 49 A

T.M- 45

KOT SECTION OF NH-15


age - 2 in the state of Punjab

MENT OPC-53 & PCE Based Admixture


Compressive
Strength

Slump Observation
CA:FA
Ratio

W/C
Ratio

Admixture
Dosage
(%)

Initial

30 Min.

62 :,38

0.32

0.6

190

62 :,38

0.32

0.55

62 :,38

0.3

0.5

60
90 Min.
Min.

7
Days

28
Days

160

140

120

44.87

A waited

190

170

150

120

49.13

A waited

190

160

140

120

54.22

A waited

Status