ENGINEERING - PIPING

TITLE:
PRODUCT LINE:
OFFSHORE
AUTHOR:
David Towell

WP-AM-OFF-EN-PI201

NUMBER:

REGION:

FUNCTION:

AMERICAS
APPROVED BY (Process Owner):
David Towell

PIPING
PROJECT REVISION BY:
N/A

KBR Management System - Offshore

WORK PROCESS INTERFACE DIAGRAM


PROJECT REVISION APPROVED BY: REVISION STATUS:
N/A
Rev 0. 02-Jun-03

A C T I V I T Y
Client

Information
Technology (IT)

START STAGE 1

Other

Piping Discipline

Project
Management

Project Controls

Other Disciplines

Process
Engineering

Document Control

Materials Control

Procurement

Construction

Process Map
Reference
PM-GL-OFF-EN-201

PROJECT SET-UP
WPID

PM-GL-OFF-EN-204
PM-GL-OFF-EN-215

Review PEP & budgets


with the Piping Dept.

PM-GL-OFF-EN-220
PM-GL-OFF-EN-225

Provide PFDs &


Preliminary Equip. List

Begin Design Activities

PM-GL-OFF-DM-201
Start Level 1
Scheduled Activities

Level 1 Schedule Input

IT
Set up Models based
on CADD Exec. Plan

PM-GL-OFF-EN-217

Develop 3D Equip.
Model. Begin Plot Plan
Development

PM-GL-OFF-EN-218

Client Requirements &


Approved Supplier List

Define Metallurgy
Requirements
Start PMCs (Piping
Material Class. Sheets)

PM-GL-OFF-EN-229

Supply Design
Condition

PM-GL-OFF-EN-211
Start General Piping
Specifications

Establish Stress
Criteria Spec.

Oversee Projects
Implementation of
PEGS

Input to Typical Equip.


Config. & Controls

Establish PEGS
Database Rqmnts.
Numbering & Format
PM-GL-OFF-EN-228

I.T.
PEGS System Setup &
Support

Start PEGS
Implementation
activities

Provide input into P&ID


Development

Prelim. Equip. shapes

Develop P&IDs

Provide Input

Fab. Sequence & Cost


Areas

Break Model into WBS

Continue Plot Plan


Development

PEGS DATABASE EQUIP. REPORT

Incopr. WBS into


Schedule

PM-GL-OFF-EN-257
Update Equipment List

Establish Weight
Control Plan

PM-GL-OFF-EN-201
275668815.xls

Establish/Define Admin
Activities, Schedule
Meeting Project

Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version

Page 1 of 10

ENGINEERING - PIPING

TITLE:
PRODUCT LINE:
OFFSHORE
AUTHOR:
David Towell

WP-AM-OFF-EN-PI201

NUMBER:

REGION:

FUNCTION:

AMERICAS
APPROVED BY (Process Owner):
David Towell

PIPING
PROJECT REVISION BY:
N/A

KBR Management System - Offshore

WORK PROCESS INTERFACE DIAGRAM


PROJECT REVISION APPROVED BY: REVISION STATUS:
N/A
Rev 0. 02-Jun-03

A C T I V I T Y
Client

Information
Technology (IT)

Other

Piping Discipline

Project
Management

Project Controls

Other Disciplines

Process
Engineering

Document Control

Materials Control

Procurement

Construction

Process Map
Reference
PM-GL-OFF-EN-201

Establish/Define Admin
Activities, Schedule
Meeting Project
Reports, Personnel
Eval.

Department
Procedures

Establish Document
Control Plan for
Internal / NonDeliverables

PM-GL-OFF-EN-203

PM-GL-OFF-EN-222

Establish EA Plan with


Scheduled Audits

Input

Develop Equipment
Location Drawings.
Maintenance
Requirements
- Oper. Aides
- Hazardous Area
Classification
- Drop Zones
- Blast/Fire Walls, etc.

Input

Input

Input

Input
PM-GL-OFF-EN-236

Review/Update Work
Area Breakdowns

Setup/Establish IPMS
Work Pkgs.

Input to Sch. Reviews


& Developments

Approve Work Pkgs.

Update IPMS Primerva

Input to Schedule
Development

Track/Report Schedule
& Budget

Input to Schedule
Development

Input to Schedule
Development

Provide Input

Process Metallurgy
Input

Input to Schedule
Development

Input to Schedule
Development

Input to Schedule
Development

Schedule Level 3
Develop./Refine

Preliminary issue of
PMC's

Participate in Line List


Develop and Speciality
item input

Extract Preliminary
Line List & Specialty
Item List
275668815.xls

PEGS AUTO NUMBER & REPORT

Provide / Input Data for


Line List

PM-GL-OFF-EN-204

Populate Process Data


in Line List
(Press & Temp)
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version

Page 2 of 10

ENGINEERING - PIPING

TITLE:
PRODUCT LINE:
OFFSHORE
AUTHOR:
David Towell

WP-AM-OFF-EN-PI201

NUMBER:

REGION:

FUNCTION:

AMERICAS
APPROVED BY (Process Owner):
David Towell

PIPING
PROJECT REVISION BY:
N/A

KBR Management System - Offshore

WORK PROCESS INTERFACE DIAGRAM


PROJECT REVISION APPROVED BY: REVISION STATUS:
N/A
Rev 0. 02-Jun-03

A C T I V I T Y
Client

Information
Technology (IT)

Other

Extract Preliminary
Piping
Line
List Discipline
& Specialty
Item List

Project
Management

Project Controls

Other Disciplines

Populate
Process Data
Process
in Line List
Engineering
(Press & Temp)

Document Control

Materials Control

Procurement

Construction

Process Map
Reference

Define Critical Lines for


Stress Analysis

Define Project Pipe


Support Standards
Insure CADD Macro's
Exist

Issue Pipe Support


Standards

Start / Develop Cat. &


Specs to Support
Design

Start Formal Studies of


Major Piping Valves
with Operating &
Equipment Access
Platforms

Extract Equ. Drawing


from model and orient
nozzles

Prove Equipment
Location Model from
Layout Route Major
Piping (8" or larger)
Point / Point in Model

Model Primary
Structure(s)

Weight Data & C.O.G.

PEGS Data

Construction Reviews

PM-GL-OFF-EN-202

Perform Preliminary
Stress Analysis in
Critical Lines

Route Additional Piping


Sufficient to define
Racks Piping
Requirements

Define Main Racks and


Cable Tray Runs

Electric Locates Trays

Show Racks in Model

275668815.xls

Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version

Page 3 of 10

ENGINEERING - PIPING

TITLE:
PRODUCT LINE:
OFFSHORE
AUTHOR:
David Towell

WP-AM-OFF-EN-PI201

NUMBER:

REGION:

FUNCTION:

AMERICAS
APPROVED BY (Process Owner):
David Towell

PIPING
PROJECT REVISION BY:
N/A

KBR Management System - Offshore

WORK PROCESS INTERFACE DIAGRAM


PROJECT REVISION APPROVED BY: REVISION STATUS:
N/A
Rev 0. 02-Jun-03

A C T I V I T Y
Client

Information
Technology (IT)

Other

Perform 10 - 15% Eng.


Assurance Audit

Piping Discipline

Show Racks in Model

Project
Management

Project Controls

Other Disciplines

Process
Engineering

Document Control

Materials Control

Procurement

Construction

Process Map
Reference

PM-GL-OFF-EN-222
Review Equipment
Location Model &
Piping Config. Make
adjustments re-route
major piping as
required
Issue ELO for IDC
Setup Drawings for
Plot Plans & General
Arrangement

Update Equipment
Location Plans and
issue IDC

IDC ELO

IDC ELO

Review ELO Plan


Return IDC Comments

Incorporate IDC
Comments

Review

Review

Review

Review

PM-GL-OFF-EN-218

Perform STAGE 1
Model Review

Review / Approve

PM-GL-OFF-EN-217

Update Weight Control


Report & CG

Approve Weight Report

Provide List of Design


Changes

Analyze Cost &


Schedule Impact

Provide Additional
Design Changes

Update Equipment &


Process Info.

Evaluate Scope / coast


Changes
Input
IT Set-up Matmam

Input

Start Baseline MTO


Effort

Extract Valve List from


PEGS Data Base

Continue P&ID
Develop Support

Continue P&ID
Develop

Input

PM-GL-OFF-EN-228

Input

Define Misc. Branch


Conn. Chart / Macros
275668815.xls

Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version

Page 4 of 10

ENGINEERING - PIPING

TITLE:
PRODUCT LINE:
OFFSHORE
AUTHOR:
David Towell

WP-AM-OFF-EN-PI201

NUMBER:

REGION:

FUNCTION:

AMERICAS
APPROVED BY (Process Owner):
David Towell

PIPING
PROJECT REVISION BY:
N/A

KBR Management System - Offshore

WORK PROCESS INTERFACE DIAGRAM


PROJECT REVISION APPROVED BY: REVISION STATUS:
N/A
Rev 0. 02-Jun-03

A C T I V I T Y
Client

Information
Technology (IT)

Other

Piping Discipline

Project
Management

Project Controls

Other Disciplines

Process
Engineering

Document Control

Materials Control

Procurement

Construction

Process Map
Reference

Define Misc. Branch


Conn. Chart / Macros

IT audit of the Load &


Configure System
Tools & Applications

System Verification &


Check. Insure all
Systems & Tools are
Located and
Functional

PM-GL-OFF-EN-218

Establish Model
Tracking Tools
Distribute

Issue PMC's for IDC


and issue General
Piping Specs.
Review

Review

PM-GL-OFF-EN-211

Review
Return

Update PMCS or
Specs & Issue for
Client Approval

Distribute

Review / Approve
For Info

For Info

For Info
Return Comments

Incorporate Comments

Complete Initial
MERLIN & CAD Spec
Development

START STAGE 2

Update Equipment
Model

Provide Mech data &


Equipment List.
Provide Electrical
Equipment Data

Establish / Confirm
Pipe N/S E/W Pipe
Runs for Each Oper.
Level

Input

Develop Pipe Support


Tray Support Design
Plan
275668815.xls

PM-GL-OFF-EN-229

Input
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version

Page 5 of 10

ENGINEERING - PIPING

TITLE:
PRODUCT LINE:
OFFSHORE
AUTHOR:
David Towell

WP-AM-OFF-EN-PI201

NUMBER:

REGION:

FUNCTION:

AMERICAS
APPROVED BY (Process Owner):
David Towell

PIPING
PROJECT REVISION BY:
N/A

KBR Management System - Offshore

WORK PROCESS INTERFACE DIAGRAM


PROJECT REVISION APPROVED BY: REVISION STATUS:
N/A
Rev 0. 02-Jun-03

A C T I V I T Y
Client

Information
Technology (IT)

Other

Piping Pipe
Discipline
Develop
Support
Tray Support Design
Plan

Project
Management

Project Controls

Other Disciplines
Input

Input
Update Major Pipe
Routing & Continued
Point / Point Routing
for Balance of Piping

Process
Engineering

Document Control

Materials Control

Procurement

Construction

Process Map
Reference

Continue P & ID
Development

Set-up drawings for


Piping Orthos
(as needed)

Issue PMC's for


Design

Issue Piping Gen.


Specs. for Design

Update input & config.


to P&ID's. Add
Additional Line
numbers value,
Specialty Item Tags

PM-GL-OFF-EN-228

Update P&ID's

Finalize all Cat. Spec.


Input / Database
P&ID HAZOP Reviews

Input

Input

Conduct P&ID HAZOP


Reviews

Participate in HAZOP
Reviews

Issue Comments to
Draft

Update PEGS

Begin MTO updates


based on 3D Model

Update weights &


COG

Issue P&ID's for


Design

Begin Valve Selection


for purchase

Provide Technical
Assistance

Prepare Inquiry Pkgs.


For:
- Bulk Material
- Gen ser. Vivs
- Specialty Vivs &
Comp.

Specify Specialty Items


Distribute

275668815.xls

IDC
Specialty Items

PM-GL-OFF-EN-211
PM-GL-OFF-EN-205
PM-GL-OFF-EN-209
PM-GL-OFF-EN-212

Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version

Page 6 of 10

ENGINEERING - PIPING

TITLE:
PRODUCT LINE:
OFFSHORE
AUTHOR:
David Towell

WP-AM-OFF-EN-PI201

NUMBER:

REGION:

FUNCTION:

AMERICAS
APPROVED BY (Process Owner):
David Towell

PIPING
PROJECT REVISION BY:
N/A

KBR Management System - Offshore

WORK PROCESS INTERFACE DIAGRAM


PROJECT REVISION APPROVED BY: REVISION STATUS:
N/A
Rev 0. 02-Jun-03

A C T I V I T Y
Client

Information
Technology (IT)

Other

Piping Discipline

Project
Management

Project Controls

Other Disciplines

Process
Engineering

Document Control
Distribute

Materials Control

Procurement

Process Map
Reference
PM-GL-OFF-EN-212

IDC
Specialty Items

Issue Inquiry Packages


Review

Incorporate IDC
Comments

Review
Distribute

Define and Document


Checking Procedures

Receive Bid Packages

Technical Input to Eval.


Bid Packages

Issue P.O.'s

Verify Inline Instr. Input


from N-Tools

Prior to STAGE 2
Review conduct &
Constructability
Review

Construction

Provide Instr. Data for


in-line Components

Input

Input

Input
Review Model &
Provide Input

Define Level of
Construction Support
that will be needed
during const.

Input from all Package


Engineers

Input

Input
PM-GL-OFF-EN-260

Define all External


Design Interfaces
(if required)

PM-GL-OFF-EN-254

Define all Supplier


interfaces & KBR
Resp. to be shown on
KBR P&ID with line
nos.

Set up ISO drawings


and verify extractions

Resolve all clashes


Review / Approve

Review

Review

Review

Review

Perform STAGE 2
Model Review

START STAGE 3

Resolve STAGE 2
Review Comments
Perform 30 - 35%
Engineering Assurance
Audit

275668815.xls

Begin the completion /


trim out of all L.B.
Piping

Finalize:
- Framing & Supports
- Inline Instr.
- Cable Trays
- Loss control
- Process
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version

PM-GL-OFF-EN-257
Page 7 of 10

ENGINEERING - PIPING

TITLE:
PRODUCT LINE:
OFFSHORE
AUTHOR:
David Towell

WP-AM-OFF-EN-PI201

NUMBER:

REGION:

FUNCTION:

AMERICAS
APPROVED BY (Process Owner):
David Towell

PIPING
PROJECT REVISION BY:
N/A

KBR Management System - Offshore

WORK PROCESS INTERFACE DIAGRAM


PROJECT REVISION APPROVED BY: REVISION STATUS:
N/A
Rev 0. 02-Jun-03

A C T I V I T Y
Client

Information
Technology (IT)

Other

Piping
Begin
the Discipline
completion /
trim out of all L.B.
Piping

Project
Management

Project Controls

Finalize:
- Framing
& Supports
Other Disciplines
- Inline Instr.
- Cable Trays
- Loss control
- Process

Continue MTO
Updates based on 3D
Models

Weight Control
Updates

Perform & Incorporate


Final Stress Review
Comments

Provide Weight and


Loads to Structural

Route all L.B. FireWater Piping in Model

Loss Control P&ID


Design

Extract ISO's for


Engr'g Review of
Lines/Suppts. For the
Sys. not formerly
analyzed

Provide Weight and


Loads to Structural

Complete L.B. Pipe


Supports & Request all
additional Trimmer
Steel

Start to Provide
Additional Steel
Supports

Process
Engineering

Document Control

Materials Control

Procurement

Construction

Process Map
Reference

PM-GL-OFF-EN-257

Complete Purchase on
Non-critical valves &
specialty Items

Conduct Discipline
Check of Model
Content & Design

Review Design basis


information Status

Establish Plan to Place


and Remove Holds

Perform 65-70% Eng.


Assurance Audit

PM-GL-OFF-EN-222

Insure Model
Completeness

PM-GL-OFF-EN-208
Resolve all clashes

275668815.xls

Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version

Page 8 of 10

ENGINEERING - PIPING

TITLE:
PRODUCT LINE:
OFFSHORE
AUTHOR:
David Towell

WP-AM-OFF-EN-PI201

NUMBER:

REGION:

FUNCTION:

AMERICAS
APPROVED BY (Process Owner):
David Towell

PIPING
PROJECT REVISION BY:
N/A

KBR Management System - Offshore

WORK PROCESS INTERFACE DIAGRAM


PROJECT REVISION APPROVED BY: REVISION STATUS:
N/A
Rev 0. 02-Jun-03

A C T I V I T Y
Client

Information
Technology (IT)

Other

Piping Discipline

Project
Management

Project Controls

Other Disciplines

Process
Engineering

Review

Review

Document Control

Materials Control

Procurement

Construction

Process Map
Reference

Perform Formal
STAGE 3 Review

Review
Approve

Review

Review

Resolve STAGE 3
Comments

Complete ISO
Extraction & Checks

Begin Issue L.B. ISO


to Fab.

START STAGE 4

Route & Detail Balance


of SB Piping in Model

Complete Level Bridels


& Misc. Equip. Trim

Complete Loss Control


Piping

Extract check & Issue


Remaining Isometrics
Perform Final E.A.
Audit
Submit De-staffing
Plan & Personnel
Receive Personnel
Evaluation
Extract & Issue Final
Documents Plot Plan,
GA's Orthos.

Document Lessons
Learned

Participate in Project
Close out Procedures

275668815.xls

Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version

Page 9 of 10

ENGINEERING - PIPING

TITLE:
PRODUCT LINE:
OFFSHORE
AUTHOR:
David Towell

WP-AM-OFF-EN-PI201

NUMBER:

REGION:

FUNCTION:

AMERICAS
APPROVED BY (Process Owner):
David Towell

PIPING
PROJECT REVISION BY:
N/A

KBR Management System - Offshore

WORK PROCESS INTERFACE DIAGRAM


PROJECT REVISION APPROVED BY: REVISION STATUS:
N/A
Rev 0. 02-Jun-03

A C T I V I T Y
Client

275668815.xls

Information
Technology (IT)

Other

Piping Discipline

Project
Management

Project Controls

Other Disciplines

Process
Engineering

Document Control

Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version

Materials Control

Procurement

Construction

Process Map
Reference

Page 10 of 10