DOCUMENT MANAGEMENT
PRODUCT LINE:
REGION:
ENERGY & CHEMICALS DIVISION
AMERICAS
AUTHOR:
APPROVED BY (Process Owner):
Rhonda Neely
Keith Ackley
WP-AM-ECD-DM-0301
NUMBER:
FUNCTION:
Worldwide
Engineering
Client
Business Unit
Information
Management
Document
Management
Business Strategy
Provide Startup
Procedures:
Develop Proposal
Staffing Guidelines
Personnel Admin.
Strategy
System Application &
Cost Proposal Support
Project
Management
Project Controls
Engineering
MRP
Procurement &
Materials
Construction
External Supplier
Process Map
Reference
Provides Systems
Security
Input
Human Resources, as
required
Personnel Resources
Admin. Dept.
Manpower Planning
Receive Input, if
Required
Receive Input
Operation Education
Training Development
Presentations
Input
Input
Provide Input
Assist in
Development of
Distribution Matrix &
Update
Provide Approved
Distribution Matrix
Write D/C
Procedures,
Provide Updates
Receive Equipment
List
Input
Develop Equipment
List
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 1 of 10
TITLE:
DOCUMENT MANAGEMENT
PRODUCT LINE:
REGION:
ENERGY & CHEMICALS DIVISION
AMERICAS
AUTHOR:
APPROVED BY (Process Owner):
Rhonda Neely
Keith Ackley
WP-AM-ECD-DM-0301
NUMBER:
FUNCTION:
Worldwide
Engineering
Client
Business Unit
Information
Management
Document
Receive
Equipment
Management
List
Project
Management
Project Controls
Develop
Equipment
Engineering
List
Receive Material
Status Reports
MRP
Procurement &
Materials
Construction
External Supplier
Process Map
Reference
Maintain Material
Status Report
Maintain Inquiry
Register & P.O.
Register
Receive Inquiry
Register & P.O.
Register
Input
Input
Input
Accounting
I. T. & System
Support, as
Required
I. T. & System
Support
Assist I. T. &
System Support
Status Report
Status Report
Status Report
Status Report
Status Report
Status Report
Receive Copies as
Required
Receive Copies as
Required
Receive Copies as
Required
Provide Engineering
Document Originals
Engineering &
General Document
for I.D.C.
*Comment as Req'd
*Reconcile Comment
Approves/Reviews as
Required
Status Report
*Provide Engineering
Document Originals
*Reconcile Client
Comment
*Receive File Copies
Internal Expediting
Receive Copies as
Required
*Provide Engineering
Document Originals
*Reconcile Client
Comment
*Receive File Copies
Issue Engineering
Documents for Design,
IFC "As Build" and
Distribute
1
Pg. 4
Receive Copies as
Required
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 2 of 10
TITLE:
DOCUMENT MANAGEMENT
PRODUCT LINE:
REGION:
ENERGY & CHEMICALS DIVISION
AMERICAS
AUTHOR:
APPROVED BY (Process Owner):
Rhonda Neely
Keith Ackley
WP-AM-ECD-DM-0301
NUMBER:
FUNCTION:
Worldwide
Engineering
Client
Business Unit
Information
Management
Document
Management
Project
Management
Project Controls
Engineering
MRP
Procurement &
Materials
Develop SDRL
Issue P. O.
Receive P. O.
Expedite Supplier
Data
Provides Supplier
Approval Document
per SDRL
Construction
External Supplier
Process Map
Reference
1
Pg. 4
1
Pg. 4
Review and
Comment as
Required
Receive Supplier
Approval Documents
Input
Issue Supplier
Document Check
Comment &
Reconcile as
Required
Return Approval
Documents
Receives &
Consolidates
Comments.
Resubmit for
Approval or Submit
Certified Final
Documents per SDRL
Receive Certified
Final Documents
1
Pg. 4
1
Pg. 4
Issue Backcheck to
Responsible
Engineer
Reviews for
Complete and
Releases for Certified
Final Issue
Trans. Only
Page 3 of 10
TITLE:
DOCUMENT MANAGEMENT
PRODUCT LINE:
REGION:
ENERGY & CHEMICALS DIVISION
AMERICAS
AUTHOR:
APPROVED BY (Process Owner):
Rhonda Neely
Keith Ackley
WP-AM-ECD-DM-0301
NUMBER:
FUNCTION:
Worldwide
Engineering
Client
Business Unit
Information
Management
Input
Input
Document
Management
Project
Management
Project Controls
Input
Engineering
MRP
Procurement &
Materials
Input
Input
Input
Input
Input
Construction
External Supplier
Trans. Only
Process Map
Reference
Input
As Built Drawings
Input
Input
Initiate Supplier
Rating Process
Input
Provides Close-out
Guidelines for
Corporate Archiving
1
Provide Requirements
for Handover Dossier
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 4 of 10
TITLE:
DOCUMENT MANAGEMENT
PRODUCT LINE:
REGION:
ENERGY & CHEMICALS DIVISION
AMERICAS
AUTHOR:
APPROVED BY (Process Owner):
Rhonda Neely
Keith Ackley
WP-AM-ECD-DM-0301
NUMBER:
FUNCTION:
Worldwide
Engineering
Client
Business Unit
Information
Management
Document
Management
Project
Management
Project Controls
Engineering
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
MRP
Procurement &
Materials
Construction
External Supplier
Process Map
Reference
Page 5 of 10
T I V I T Y
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 6 of 10
T I V I T Y
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 7 of 10
T I V I T Y
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 8 of 10
T I V I T Y
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 9 of 10
T I V I T Y
Paper copies of this Process Map are UNCONTROLLED. Please refer to the KBR MS website for the current version
Page 10 of 10