Professional Documents
Culture Documents
Deliverables
The following services are performed:
Objectives
The primary objective is to
create tags for one or two
standard PI Interfaces already
installed at the customer site.
The installation is performed on
site by a qualified member of
our OSIsoft PI system field
service team.
The scope of this package is
limited to the configuration of
20,000 PI tags.
Timeline
The installation process, from ordering to completion, normally takes 2 to 3
weeks:
Week 1 and 2 Communication of prerequisites. Confirmation of on site date
with OSIsoft. Provide to OSIsoft an electronic version of the raw tag
information extracted from the data source.
Week 3 On site installation by OSIsoft (Up to two days)
Requirements
PI Server and PI Interface must be operational before OSIsoft's arrival
Customer must provide an electronic version of required raw tag information
extracted from the data source (Tagname, description, zero, span,
engineering units, point type, state information and control system address).
Required information will be validated during the pre-installation checklist
review
Customer's technical staff needs to be available to provide system support
(Security, Network and Control Systems)
Customer must provide a configuration station with the PI SMT tools and
MS Excel software
Customer must arrange for safety training, and any permits required
Customer must provide all special safety equipment as required
Package
This package includes 2 days of OSIsoft field service excluding travel time.
Travel and living expenses will be invoiced at cost.
www.osisoft.com
OSIsoft, Inc. 777 Davis Street Suite 250 San Leandro, CA 94577 (510) 297-5800