Data & Drawings Required

1. Transformer Details
GTP + Drawings
Test Reports
2. DGs present at site
GTP and Wiring drawings of syn. Panel.
Test Report
3. Servo Stabilizer
GTP & Drawings.
Test Report
4. Main Panel from Stabilizer
Wiring Drawings.
GA (General Arrangement0
BOQ (Bill of Quantity)
Shunt trip coil, closing coil & motor details of all the ACBs in the panel.
Short circuit ratings of the bus and the breakers.
5. Main PCC drawing and GTP of all equipments.
6. MCC wiring drawings for the modifications made on site.
7. Rendering Panel drawings GTPs and the wiring drawing.
8. The ETP Panel drawings for the entire plant.
9. Compressor panel drawings in the plant (Rendering Area).
10.The VCB & Sf6 details from the Grid to the transformer.
11.Lighting loads (KW) & the Air conditioning (KW) for the office area.
12.Plot plan of the entire plant.
13.Medium & large motor compressor nameplates.
14.Slaughter Area loads (Motor & Machines)
15.Full load in KWH for rendering area.