Full Hydraulic Calculations Computer Printout Page No 1

Project:
Address:
Number:
Area ref:
Hazard:
Authority:
Source:

Submitted by Engr Anwar Ul Karim, MBA, PMP


MIEB No M/34416
DeFire Bangladesh

Standpipe & Hose System of ATHL (5 Std Bldg 2)


Chandra. Gazipur
DB-ATHL-4H2-V1.0
Most Unfavourable
ordinary
National Fire Protection Association
2885.7 l/min @ 6.732 bar

Tel: Fax:

Project Data and Design Parameters


Project name
Area reference
Address / location
Project number
Installation number(s)
Drawing number(s)
Issue no / date
Designers reference
Project Data File
Hazard classification
Design authority
Insurance company
Specified density of discharge
Assumed maximum area of operation
Number of operating sprinkler heads
Maximum area covered per head
Highest head / nozzle above source
Number of pipes in system
Pressure loss equation used
Fluid
Pipe Data Table
Maximum fluid velocity
Volume of pipework and fittings
Elbows are welded for
Comment
Checked by & Date

:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:

Standpipe & Hose System of ATHL (5 Std Bldg 2)


Most Unfavourable
Chandra. Gazipur
DB-ATHL-4H2-V1.0
0
DB-ATHL-4H2-V1.0
17.06.15
4th floor
C:\DOC
ordinary
National Fire Protection Association
--0.00 mm/min (l/min/m2)
0.00 m2
3
0.00 m2
0.00 m
86
from 65 to 200 mm
Hazen-Williams
Water
STD_PIPE.PDT
4.38 m/s in pipe 139 140
7.13 m3
65
mm and above
---

Source duty = 2885.7 l/min @ 6.732 bar at node no 100

FHC - Hydraulic Analysis Software - Ver: 1.8.0


By CANUTE LLP - Email info@canutesoft.com Web www.canutesoft.com

Program FHC

Full Hydraulic Calculations Computer Printout Page No 2


Submitted by Engr Anwar Ul Karim, MBA, PMP
MIEB No M/34416
DeFire Bangladesh

Project:
Address:
Number:
Area ref:
Hazard:
Authority:
Source:

Standpipe & Hose System of ATHL (5 Std Bldg 2)


Chandra. Gazipur
DB-ATHL-4H2-V1.0
Most Unfavourable
ordinary
National Fire Protection Association
2885.7 l/min @ 6.732 bar

Tel: Fax:

Operating Sprinkler Heads, Nozzles and Hydrants


Head|Node| Size | 'K' |F l o w|A
no | no | mm | factor| l/min |
10 140
445.95
972.7
19 158
445.95
967.1
20 160
445.95
946.0

r e a|Density mm/min|Pressure bar|Heights|Pipe


m2 |Req.d
Actual| Min
Actual|
m
| no
0.000
0.00
0.00
4.50
4.757 16.550
40
0.000
0.00
0.00
4.50
4.703 13.500
58
0.000
0.00
0.00
4.50
4.500 16.550
60

0 heads are under the required density / minimum pressures

FHC - Hydraulic Analysis Software - Ver: 1.8.0


By CANUTE LLP - Email info@canutesoft.com Web www.canutesoft.com

Program FHC

Full Hydraulic Calculations Computer Printout Page No 3


Submitted by Engr Anwar Ul Karim, MBA, PMP
MIEB No M/34416
DeFire Bangladesh

Project:
Address:
Number:
Area ref:
Hazard:
Authority:
Source:

Standpipe & Hose System of ATHL (5 Std Bldg 2)


Chandra. Gazipur
DB-ATHL-4H2-V1.0
Most Unfavourable
ordinary
National Fire Protection Association
2885.7 l/min @ 6.732 bar

Tel: Fax:

Hydraulically Significant Pipes in System


NUMBERS | P I P E | F L O W |DIMENSIONS|ANGLE| VALUES |HEIGHT M|PRESSURES BARS
Pipe|Start|Size
Type| L/min | Length VJ|Dir. | Eq.len | Start | Start
Frict
no | End |Bore
'C'| Vel m/s |EL T
VT|Slope| mbar/m |
End | End
Static
1 100 200mm
MW
2885.7
1.000
Up
15.96
0.000
6.732 -0.019
101 206.40 120
1.4
0 0
MV 90.0
1.2
1.000
6.616 -0.098
3 101 200mm
MW
2885.7
1.600
180
13.24
1.000
6.616 -0.015
103 206.40 120
1.4
0 1
0.0
1.2
1.000
6.601 +0.000
6 103 200mm
MW
2885.7
29.180
90
40.82
1.000
6.601 -0.047
106 206.40 120
1.4
0 1
0.0
1.2
1.000
6.553 +0.000
7 106 150mm
MW
2885.7
6.970
0
16.48
1.000
6.553 -0.076
107 155.32 120
2.5
0 1
0.0
4.6
1.000
6.477 +0.000
9 107 150mm
MW
1913.1
25.570
0
25.57
1.000
6.477 -0.055
109 155.32 120
1.7
0 0
0.0
2.2
1.000
6.422 +0.000
10 109 150mm
MW
1913.1
26.500
270
36.01
1.000
6.422 -0.078
110 155.32 120
1.7
0 1
0.0
2.2
1.000
6.344 +0.000
31 107 100mm
MW
972.7
1.520
Up
8.50
1.000
6.477 -0.035
131 105.14 120
1.9
0 1
90.0
4.1
2.520
6.293 -0.149
33 131 100mm
MW
972.7
4.420
Up
4.42
2.520
6.293 -0.018
133 105.14 120
1.9
0 0
90.0
4.1
6.940
5.842 -0.433
35 133 100mm
MW
972.7
3.510
Up
3.51
6.940
5.842 -0.015
135 105.14 120
1.9
0 0
90.0
4.1
10.450
5.483 -0.344
37 135 100mm
MW
972.7
3.050
Up
3.05
10.450
5.483 -0.013
137 105.14 120
1.9
0 0
90.0
4.1
13.500
5.172 -0.299
39 137 100mm
MW
972.7
3.050
Up
3.05
13.500
5.172 -0.013
139 105.14 120
1.9
0 0
90.0
4.1
16.550
4.860 -0.299
40 139
65mm
MW
972.7
1.520
270
3.10
16.550
4.860 -0.102
140
68.67 120
4.4
1 0
0.0
32.9
16.550
4.758 +0.000
51 110 100mm
MW
1913.1
1.520
Up
3.61
1.000
6.344 -0.052
151 105.14 120
3.7
1 0
90.0
14.5
2.520
6.142 -0.149
53 151 100mm
MW
1913.1
4.420
Up
4.42
2.520
6.142 -0.064
153 105.14 120
3.7
0 0
90.0
14.5
6.940
5.646 -0.433
55 153 100mm
MW
1913.1
3.510
Up
3.51
6.940
5.646 -0.051
155 105.14 120
3.7
0 0
90.0
14.5
10.450
5.251 -0.344
57 155 100mm
MW
1913.1
3.050
Up
3.05
10.450
5.251 -0.044
157 105.14 120
3.7
0 0
90.0
14.5
13.500
4.908 -0.299
58 157
65mm
MW
967.1
1.520
180
6.27
13.500
4.908 -0.205
158
68.67 120
4.4
0 1
0.0
32.6
13.500
4.703 +0.000
59 157 100mm
MW
946.0
3.050
Up
3.05
13.500
4.908 -0.012
159 105.14 120
1.8
0 0
90.0
3.9
16.550
4.597 -0.299
60 159
65mm
MW
946.0
1.520
180
3.10
16.550
4.597 -0.097
160
68.67 120
4.3
1 0
0.0
31.3
16.550
4.500 +0.000
Continued on the next page

FHC - Hydraulic Analysis Software - Ver: 1.8.0


By CANUTE LLP - Email info@canutesoft.com Web www.canutesoft.com

Program FHC

Full Hydraulic Calculations Computer Printout Page No 4

BV
MV

100

MRH

FHC - Hydraulic Analysis Software - Ver: 1.8.0


By CANUTE LLP - Email info@canutesoft.com Web www.canutesoft.com

Program FHC