Technical brief
It is important to ensure that the row of bricks serving as a
base for lintels placed at the top of door and window openings
should extend not less than 6 inches beyond the sides of the
opening as shown in fig 3A and 3B.
Fig 1A - Plan view
An 8W x 4H reinforced insitu concrete lintel reinforced with
2 no. 8 dia. top steel and 2 nos. 10 dia. bottom steel with
stirrups at 8 centres must be laid on the base described
above.
Fig 1B - Elevation
The next row above the base row of bricks should have 2
bricks laid parallel with each other along the exterior and
interior surface of the wall with a cavity between them.
The ends of these bricks will be stabilised with the
placement of a single brick on edge that spans the width
of the wall. (see fig 1B)
L and T corners in wall must be constructed as illustrated
bellow. (see fig 2)
Constructing a corbel
Corbels can be constructed using bricks placed flat or onedge as preferred, as shown in fig 3A & 3B.
Fig 2
Fig 4A
Fig 4B
Fig 3A
Fig 3B
Practical Action Walls using the rat trap bond technology Technical brief
Technical brief
Corbel Bench (Seat)
the top of the seat from the finished floor level must be 1- 6.
(See fig: 5).
Points to note:
2 1/2"
2 1/2"
8"
8 brick
Brick
foundation
3 courses of
brick
Finished floor
level
Fig 5 - Section at corbel seat