PPAP Level III REQUIREMENTS

PPAP Submission Levels


Level
Level
Level
Level
Level

1
2
3
4
5

Part Submission Warrant (PSW) only.


PSW with product samples and other items requested.
PSW with product samples and complete supporting data.
PSW and other items requested.
PSW with product samples and complete supporting data
available for review at the manufacturer.

Note: Level 3 will typically be used. Blackmers minimum supporting data is


indicated below. Yellow items are always needed.
ITEM

REQUIREMENT

COMMENTS

Design Records

Rarely Specified

Blackmer typically owns all design.

Engineering Change
Documents
Customer Engineering
Approval
Design FMEA

Rarely Specified

Process Flow Diagrams


Process FMEA

Always required.
Always required.

Dimensional Results
Material Performance
Test Results
Initial Process Study
Measurement System
Analysis Study
Qualified Laboratory
Documentation
Control Plans

Always required.
Always required.

Rarely Specified

May be requested to assure control of special processes.

Rarely Specified

As specified by QA
As specified by QA
As specified by QA
Always required.

Part Submission Warrant


(PSW)
Appearance Approval
Report
Bulk Material
Requirements
Sample Product

Always required.

Master Samples

As specified by QA

Checking Aids

As specified by QA

Records of Compliance

As specified by QA

As specified by QA
As specified by QA
Always required.

C:\Documents and Settings\misslitz\My Documents\PPAP-Level-III-Requirements.doc