You are on page 1of 2

REV.

5/7/2015

Project Assessment Form


CONTACT INFORMATION

PROJECT INFORMATION

Name

Project Name

Company

Project Owner

Phone

Location (City, Country)

Email

CURRENT OPERATIONS

FINANCIAL METRICS

How does the facility currently handle waste gas emissions? (select all that
apply)

Cost of Gas

Thermal Abatement (Flares, Oxidizers, etc.)

Cost of Electricity

Scrubbing (Chemical, Water, etc.)

Onsite Electrical Load

Venting

Calorific Value

Pressure

Flow Rate

Temperature

WASTE GAS DETAILS

GAS COMPOSITION*
*Please attach gas composition if components are not
included in the list below
Water
____%
Hydrogen
____%
CO
____%
Nitrogen
____%
Oxygen
____%
H2S
____%
Argon
____%
CO2
____%
Methane
Ethane
Propane
isoButane

____%
____%
____%
____%

n-Butane
isoPentane
n-Pentane
n-Hexane

____%
____%
____%
____%

n-Heptane

____%

n-Octane

____%

n-Nonane

____%

n-Decane

____%

Ethyne

____%

Ethene
Propene
Benzene

____%
____%
____%

FUEL SOURCE
Landfill/Biogas
Associated Petroleum Gas (APG)
Coal Mine Methane (CMM)
VOC/Odor Elimination
Syngas
Natural Gas
LNG Boiloff Gas
Other

FUEL CONTAMINANTS
Siloxanes
H2S
Other

COMPOSITION/FLOW VARIABILITY
Describe fluctuations in
flow and composition (if
any)

REV. 0

PROJECT SUMMARY/NOTES
Please provide a summary of the project as well as any additional criteria not covered previously

Please contact us with any questions or concerns at the information provided below:
Ener-Core, Inc.
9400 Toledo Way
Irvine, CA 92618
office: (949) 616-3300
fax: (949) 616-3399
info@ener-core.com

5/7/2015

You might also like