Professional Documents
Culture Documents
Aux HT
Aux HT
PLANT DETAILS
2.0
OBJECTIVE
3.0
PROPOSAL
4.0
SERVICES REQUIRED
5.0
SAFETY PERECAUTIONS
6.0
EMERGENCY PROCEDURE
7.0
8.0
METHOD
9.0
COMPLETION CRITERIA
10.0
APPENDICES
a) APPENDICES
PLANT DETAILS:
Refer to procedure - I
2.0
OBJECTIVE:
Refer to procedure - I
3.0
PROPOSALS:
3.1
3.2
4.0
SERVICES REQUIRED:
4.1
4.2
4.3
4.4
Signatures
NTPC
BHEL
SAFETY PRECAUTIONS:
5.1
5.2
5.3
6.0
EMERGENCY PROCEDURES:
6.1
6.2
6.3
Signatures
NTPC
BHEL
7.1
7.2
7.3
7.4
The drain valves and test valve in the calibrated standard test pressure
gauge sensing line must be open.
7.5
The isolating valves provided in all the other branching systems like SB
system tapping, SH spray connections, Pr. Gauges etc. have to be tightly
closed. Hydraulic test of SB system, SH spray system etc. is carried out
separately at specified pressures.
7.6
7.7
When valves are in tandem (double valves) both valves must be closed
during the hydrotest.
7.8
All the hangers in Boiler & piping system are set / locked as per
recommendation.
7.9
Signatures
NTPC
BHEL
7.11
7.12
7.13
7.14
7.15
All connected pipelines (temporary) are welded.
7.16
Delivery line of pressurizing pump should be high-pressure seamless
pipe to withstand the required test pressure.
7.17
Signatures
NTPC
BHEL
8.1.1
8.1.2
8.1.3
8.1.4
8.1.5
After completing the air tightness testing keep vent valves in SH drum
and drain and test valves in official pressure gauge in open position.
8.2
TEMPORARY
BOILER
FILL
PRESSURISING
PUMP, WITH
CONNECTING PIPELINES.
PUMP,
THEIR
TEMPORARY
TEMPORARY
8.2.1
8.2.2
8.2.3
Signatures
NTPC
BHEL
Before starting the filling pump, the delivery valve to be closed and the
suction valve kept open. Then open delivery valve gradually for filling.
Before stopping the pump, delivery valve should be closed.
8.2.5
8.3
8.3.1
The boiler Drum, bank tubes and Superheaters are filled through filling
lines connected to the boiler drain header.
8.3.2
8.3.3
Close and open the vent valves several times in order to allow venting
of entrapped air.
8.3.4
8.4
8.4.1
8.4.2
The pressure shall be increased at a rate of not more than 10kg/sq.cm (g)
per minute upto approximately 80% of the test pressure and by 1 to 2
kg/sq.cm (g) per minute beyond that value.
Signatures
NTPC
BHEL
Raise the pressure to the hydrostatic test pressure. The pressure shall be
under proper control at all times. The pump operator and the responsible
person watching the official test gauge must have constant contact.
When the test pressure is reached, the responsible person watching the
test gauge shall give orders to stop the test pumps immediately and to
cut off the electric connections.
8.4.4
The test pressure is held for about 10 minutes. During the holding time
the official test gauge pressure reading shall not drop noticeably.
8.5
HYDRAULIC TEST
8.5.1
The hydraulic test pressure reading will be taken from the caliberated
standard test pressure guage located at the Drum level.
8.5.2
After the hydraulic test pressure has been noted, the test pressure is then
reduced to not less than the maximum allowable working pr. and the
whole pressure parts checks will be carried out.
8.5.3
If leaks are found, it will be necessary to release the pressure and drain
these portions. Make the repairs and refill the unit as mentioned above
and repeat hydraulic test.
8.5.4
Signatures
NTPC
BHEL
leaks,
burn
through,
8.6.1
8.6.2
While releasing the pressure, the vents should be opened when the
system pressure reaches 1kg/sq.cm to prevent creation of vacumm in the
system.
8.7
8.7.1
8.7.2
8.8
8.8.1
Signatures
NTPC
BHEL
COMPLETION CRITERIA;
The test pressure in the official pressure gauge is held for 10
minutes ( or for a duration decided by Inspection authority) in
presence of Inspection authority. The Boiler shall satisfactorily
withstand such pressure without appreciable leakage or undue
deflation or distortion of its pressure parts.
10.0
APPENDICES:
Refer to Procedure
- I
Signatures
NTPC