Professional Documents
Culture Documents
5th Floor - Slab S3 - Bottom PDF
5th Floor - Slab S3 - Bottom PDF
214807
ARUP
Job Title
Sheet No.
Rev.
Calculation Sheet
Member / Location
Drg. Ref.
Made by
Flange width, bf
Web width, bw
Section depth, D
Flange depth, hf
Top clear cover
=
=
=
=
=
1000
1000
150
0
30
mm
mm
mm
mm
mm
=
=
=
=
25
45
460
3.8
mm
Mpa
MPa
kNm
DL
SDL
LL
Factored Load, q
=
=
=
=
3.75
8.55
2.50
21.2
Date
Kpa
Kpa
Kpa
Kpa
Compression Reinforcement
195
22-Oct-12
Chd.
Span, L
N.T.
1.2 m
Tensile Reinfrocement
As, req.
T.V.
sq.mm
Provide
6000
(Not required)
sq.mm
Provide
1st Layer
Spacing
= T
=
10
200
5
mm
1st Layer
Spacing
= T
=
10 4
250
mm
2nd Layer
Spacing
= T
=
0
200
5
mm
2nd Layer
Spacing
= T
=
0 5
200
mm
3rd Layer
Spacing
= T
=
0
200
5
mm
3rd Layer
Spacing
= T
=
0 5
mm
200
4th Layer
Spacing
= T
=
0
200
5
mm
As, prov.
As, prov.
=
393
=
0.262
==> OK
sq. mm
%
= 314.16 sq. mm
= 0.2094 %
==> OK
Shear Reinforcement
Design Element
With shear reinfrocement
vc
vmax.
=
=
Location
av
Shear froce
v
Enhanced vc
Asv/sv, req.
=
=
=
=
=
=
Bar size
=
=
0.753
5.367
N/mm2
N/mm2
1
0
12.7
0.116
5.367
0.000
T
slab
no
OK!
2
500
2.1
0.019
0.753
0.000
10
3
1000
0
0.000
0.753
0.000
4
1500
0
0.000
0.753
0.000
5
2000
0
0.000
0.753
0.000
6
2500
0
0.000
0.753
0.000
7
3000
0
0.000
0.753
0.000
8
3500
0
0.000
0.753
0.000
ARUP
Job Title
Sheet No.
Rev.
Calculation Sheet
Member / Location
Drg. Ref.
Made by
= 152 N/mm
T.V.
Date
22-Oct-12
Chd.
N.T.