Job No.

214807

Ove Arup & Partners Hong Kong Ltd.

ARUP
Job Title

Sheet No.

Rev.

Calculation Sheet

Residential Development At Ho Man Tin

Member / Location
Drg. Ref.

Typical 1-way Slab Design - Tower 2

Made by

T.V.

22nd Floor - Slab S28 - Strip Y2 Top.

Date

3-Nov-12

Chd.

N.T.

Design Information:
Flange width, bf
Web width, bw
Section depth, D
Flange depth, hf
Top clear cover
Bottom clear cover
Concrete strength
Rebar strength
Design Moment

=
=
=
=
=
=
=
=
=

1000
1000
250
0
40
35
45
460
47.0

mm
mm
mm
mm
mm
mm
Mpa
MPa
kNm

Tensile Reinfrocement

As, req.

Compression Reinforcement

618

sq.mm

> As, min


< As, max

Provide

(Not required)

10000 sq.mm
Provide

1st Layer
Spacing

= T
=

10
125

8
mm

1st Layer
Spacing

= T
=

0 5
200
mm

2nd Layer
Spacing

= T
=

0
200

5
mm

2nd Layer
Spacing

= T
=

0 5
200
mm

3rd Layer
Spacing

= T
=

0
200

5
mm

3rd Layer
Spacing

= T
=

0 5
200
mm

4th Layer
Spacing

= T
=

0
200

5
mm

As, prov.

As, prov.

=
628
0.251
=
==> OK

sq. mm
%

=
0
0
=
==> OK

sq. mm
%

> As, req.

> As, req.

Shear Reinforcement

Design Element
With shear reinfrocement
vc
vmax.

=
=

Location
av
Shear froce
v
Enhanced vc
Asv/sv, req.

=
=
=
=
=
=

Bar size

=
=

0.622
5.367

N/mm2
N/mm2

1
0
1050.0
5.250
5.367
0.000
T

slab
no

(e.g. Slab or Beam)


(e.g. Yes or No)

OK!
2
500
120.0
0.600
0.622
0.000

10

3
1000
0
0.000
0.622
0.000

4
1500
0
0.000
0.622
0.000

NO SHEAR LINKS IS REQUIRED

5
2000
0
0.000
0.622
0.000

6
2500
0
0.000
0.622
0.000

7
3000
0
0.000
0.622
0.000

8
3500
0
0.000
0.622
0.000