Super Critical Salient Features
Super Critical Salient Features
POWER OUTPUT
= 660 MW
TOTAL ENERGY DELIVERED @ 660 MW FOR A PERIOD OF ONE HOUR =
660MWH
Taking Efficiency = 37.96 % and 90 % PLF
Input = 660* 103 x 0.9 x 860 kcal / 0.3796
= 1345732.35 Kcal
(1 KWH = 860kcal)
INDIRECT SAVINGS
Assuming Auxiliary Power consumption as 8 %
Estimated reduction in auxiliary power consumption = 0.3 %
For 660 MW units savings of auxiliary power
= 8 % x 660 x 0.003 = 0.158MW
Yearly savings in MW
1.5
6
5
4
0.6
0.9
3.2
3 .
2
1
167 bar 250 bar
250 bar
250bar
250 bar
538/538c 538/538
540/560c 566/566 c 580/600c
Doosan Units
BHEL Units
Total
MT
Structure 6924 MT
Pr. Parts 7080 MT
P C Piping 3032 MT
P F System 3823 MT
Draft System 5004
MT
Refractory/Insulation
C&I/Misc 2097 MT
Weight-
28585
Structure 10801 MT
Pr. Parts 5800 MT
P C Piping 1445 MT
P F System 2342 MT
Draft System 5680 MT
Refractory/Insulation
C&I/Misc 2517 MT
STEAM PR
SH STEAM TEMP
660
T/HR
2225
1625
KG/CM2
256
179
540
540
T/HR
1742
1397.4
303.7
338.5
568
540
KG/CM2
51.17
46.1
291.4
255.2
RH STEAM FLOW
RH STEAM TEMP
unit
INLET
0
0
500
Tonnage Comparison
Description
660 MW
500 MW
7383
9200
7080
5300
1410
2000
3032
2200
54
76
3573
2000
Draft System
5275
5200
62
200
Miscellaneous System
130
280
282
380
28281
26836
TOTAL
Material Comparison
Description
660 MW
500 MW
Structural Steel
Alloy Steel
Carbon Steel
Water wall
T22
Carbon Steel
SH Coil
T23, T91
T11, T22
RH Coil
T91,Super 304 H
T22, T91,T11
LTSH
T12
T11
Economizer
SA106-C
Carbon Steel
42,000 Nos
24,000 Nos
Structural Comparison
Slno
660 MW
STRUCTURALS
500 MW
b.
Remarks
Structural is
assembled at site
with welding
Advantages (660MW) of
Bolting structure:
oFast in erection.
oClean environment
oNo Welding network required
oSafety at site
oPainting finish is good
o( No Weld surface)
Assembly is carried
out with Welding
Material is supplied
as per the erection
sequence.
COST COMPARISON
1 Cost of SG Package
1970.73 Cr
2 Cost of ESP
183.54Cr
2154.27 Cr
1020.54 Cr
1.09 Cr
1.02 Cr
1204.72 Cr
634.31 Cr
6 TG cost per MW
0.6Cr
0.63 Cr
BOILER SPECIFICATION
Description
unit
STEAM PR
SH STEAM TEMP
2225
KG/CM2
256
540
T/HR
1742
303.7
568
KG/CM2
51.17
291.4
RH STEAM FLOW
RH STEAM TEMP
T/HR
INLET
0
0
= Boiler Efficiency
100% TMCR
86.27%
80% TMCR
86.60%
80% Load
60% TMCR
86.68%
60% Load
50% TMCR
86.91%
50% Load
SUPERCRITICALTHERMAL CYCLE
ADVANTAGES
(1)
SUPERCRITICAL ADVANTAGES
(2)
SUPERCRITICAL DISADVANTAGES
Higher power consumption of BFP
Higher feed water quality required.
More complex supporting and framing in Boiler due to
Spiral Wall tubes.
Slight higher capital cost.
Increased dependency For Spares and services.
IMPORTANCE OF EFFICIENCY
The cost of operating the Plant of 3 x 660 MW, one percentage
point below the design point, will incur additional fuel cost of
Rs. 16 Crores in a year.
The indirect costs for Maintenance, APC, Ash Dyke land etc. will
give additional burden of Rs. 1Crores in a year.
The environment will benefit on account of reduction in GHGs like
Co2, NOX & SOX.
The life time savings of Rs.550- 600 Crores can be achieved by
increasing efficiency by one percentage .
At Sipat, we gain an efficiency of 2.5 percentage by adopting
super critical technology in 1980 MW station, thus saving Rs. 1440
Crores in its life time.