Professional Documents
Culture Documents
Anda Street Oxford Road: MA RT IN
Anda Street Oxford Road: MA RT IN
STREET
RESIDENTIAL
OXFORD
STREET
R ESE
RK
VENTOR ST.
LIME ST.
.
PL
IVE
DR
NT
CE
ES
CR
CLA
AVENUE
SWAN
DISCHARGE MH
ST.
NUE
RVE
AVE
GRATE
SWAN
BAIN ST.
STR
S
COAT
BARN
EET
ST.
ON
NT
FE
26.01-70/180-5.69
9.22-8
7.5/18
0-2.52
NON RESIDENTIAL
ROAD
PARRY
ROAD
5.62-8
7.5/21
0-1.79
ANDA
6.75-8
7.5/18
0-1.48
MA
RT
IN
3.83-21600-144
8.53-70/220-2.28
LEGEND
DRAIN
EN
QUE
CON
VI
EW
.03
AD
RO
0-4
18 D
.5/ ROA
NT
HU
-87
.75
14
FAL
5.83-16992-172
CL.
52.66-14976-13.69
BA
Y
ILE
R
DO
TU
STREET
N
ER
DF
RE
ST.
RUTH
ET
RE
ST
ROAD
ET
RE
ST
N
YA
BR
AD
RO
IS
RR
HA
PROPOSED CARLTON
PUMPING STATION NO.1
HARRIS STREET
ET
RE
ST
STREET
HARRIS
Y
WA
MAPLE
ET
RE
ST
ET
RE
ST
17.49-105/180-5.73
STREET
POINTER
ET
RE
ST
E
GL
EA
ET
RE
ST
ET
RE
ST
H
RS
MA
BISHOP
EE
LL
FR
HA
13.74-52.5/180-2.25
N
ER
DF
RE
BRYAN
22.74-70/180-4.97
STREET
PARAMETER
GROSS CATCHMENT AREA:
NETT CATCHMENT AREA:
MAXIMUM INFLOW TO PUMPING STATION:
PUMPING FLOW RATE(S):
STORAGE TIME IN SEWERAGE SYSTEM AT
ULTIMATE GRAVITY SEWER DESIGN FLOW CONDITION
BETWEEN HIGH LEVEL ALARM LEVEL
AND INVERT LEVEL
OF
EMERGENCY OVERFLOW PIPE (OVERFLOW TO
ENVIRONMENT).
STORAGE VOLUME OF WET- WELL BETWEEN
CUT OUT-AT LEVEL
AND
ULTIMATE DUTY CUT-IN LEVEL
BASED ON 5 STARTS/HOUR (3 MIN STORAGE
AT PUMP RATE) THIS IS SUITABLE FOR A
MAXIMUM PUMPING FLOW RATE OF:
TOTAL STORAGE VOLUME
- SYSTEM STORAGE VOLUME
- STORAGE TANK VOLUME
INITIAL
20.38 ha
15.28 ha
22.46 L/s
30 L/s
ULTIMATE
249.59 ha
187.19 ha
66.29 L/s
88 L/s
5.2 hrs
3.5 hrs
15840 L
88 L/s
3
256.3m
312.8m3
NIL
403.1m3