You are on page 1of 1

INLET SEWER

DN 25 WATER SERVICE
LOCATED AS SPECIFIED
ON PROJECT DRAWING
NON-MOUNTABLE KERB
(VERTICAL DISTANCE
BETWEEN TOP OF KERB
AND HARDSTAND TO BE
300)

NON-RESIDENTIAL VEHICULAR CROSSING


HARDSTAND (& ACCESS ROAD
IF REQUIRED)

KERB &
CHANNEL

RPZD

STANDARD 1830 DIA.


GRIT COLLECTOR MN.
LOCATION MAY VARY.
SUCTION CLEANING PIPES
TO FACE ACCESS ROAD
DN 20 HOSE TAP WITH
VACUUM BREAKER.
LOCATION TO SUIT
SITE LAYOUT

EDUCT/INDUCT
LOCATION TO SUIT
SITE LAYOUT.

10000 MIN.
SIZE AS SPECIFIED
ON PROJECT DRAWING

4000 MIN.

GATE TO BE SHOWN
ON PROJECT DRAWING

START OF PRESSURE MAIN

DN 32 ELECTRICAL
CONDUIT (FOR FUTURE
LEVEL PROBE)

POWER AND CONTROL


CUBICLE
SPOON DRAIN WITH
SUITABLE APPROVED
DISCHARGE IF SPECIFIED
ON PROJECT DRAWING

2 METRE HIGH GALVANISED


STEEL FENCE (FIREPROOF)
WITH CONCRETE MOWING
STRIP PROJECTING OUTSIDE
THE FENCE LINE.
SURVEY MARK ON TOP SLAB

BASED ON BRISBANE WATER STANDARD DRAWING

LOCATION OF CONDUITS AND


PIPEWORK AS SPECIFIED ON
DESIGN DRAWINGS
10000 MIN.
SIZE AS SPECIFIED ON DESIGN DRAWINGS

TYPICAL SITE LAYOUT

PRESSURE MAIN

SURFACE TREATMENT TO
BE AS SPECIFIED ON
PROJECT DRAWING
(AREA TO BE MAINTENANCE
FREE CONCRETE ETC.)

ELECTRICITY PILLAR
BOX

NOTES

You might also like