Professional Documents
Culture Documents
CONTRACTOR
PROJECT
LOA No.
1.0 Introduction:
This document contains design calaculations for Surface storm water drains ( Power Station)
Total Substaion drains are Designed as rectanular surface drain type of drains based
Analysis is carried out based the basic input parameters furnished in the Civil Structural
Reference documents:
i) Civil and Structural Design Basis SL-PE-23-CAL-DBR-002_R02
ii) Manual on storm water drainage systems valume I Part A Central public health and environment
Engineering Design by Government of India engineering organization
Reference drawings:
DOC NO. 0
CASE-1 Concrete pavement with Tied Concrete Shoulder with Doweled joints
MODULUS OF SUBGRADE REACTION (K) (Mpa/M) = 42.9 Mpa/m ( As Per Table 2, IRC 58)
Reference drawings:
Design Basis Document. However, furnished below for easy reference.
Total Substaion drains are Designed as rectanular surface drain type of drains based
Analysis is carried out based the basic input parameters furnished in the Civil Structural
Rainfall Intensity I= 90
DOC NO. 0
Fy 500 Mpa
Concrete U W 25 kN/m3
Slab Thk. 0.2 m
As = mm2
Ld = 4500 4m m
f = 1.5
W = 5 kN/m2 kN/m2
Sst = 275 (50-60%(50-60% of the minimum yield Stress of steel
LdfW
As = 2Sst
Transverse Direction
Asreq. = 0.055 mm2
Longitudinal Direction
Asreq. = 61.364 mm2