SITE CIRCULATION

MASTER
PLAN

Location Zirakpur
Architecture Firm Gian P.
Mathur Associates (New Delhi)

7
1
2
4

6
5

PURPOSE
Location of site is conveniently accessible from our
dwelling
Many attributes present in this enclave vow for better
case study
Co operative Management
To better analyze the design and its concept

ACCESS TO THE SITE

Plot Area =
56061.468 sq. mtrs.
Total built up area =
111156.26 sq. mtrs.

F.A.R. = 200%
Total ground coverage
= 14941.691 sq. mtrs.
Ground coverage
percentage = 28%

EWS
2 BHK

Site area =
56315 sq.
mtrs.
Entrance through 2 main gates
The VIP entrance can be accessed from both Ambala and
Patiala highway

3 BHK

TYPES OF
DWELLING
966 UNITS
2 BHK
3 BHK
PENT HOUSES

DISTRIBUTION OF
TOWERS

DWELLING PLANS
3 BEDROOM APARTMENTS (GROUND
FLOOR)

Descripti
on

No.
of
bloc
k

No.
of
floor
s

G+7(3BR unit)

4 FLAT
CLUSTER
(A,B,C,D,E,
F,G,H,I,J,L,
N)

12

4 FLAT
CLUSTER
(K & M)

G+6(3BR unit)

6 FLAT
CLUSTER
(V)

Master
bedroom

13.79 sq.
mtr.

G+7(2BR unit)

8 FLAT
CLUSTER
(O,U,T)

TV room

13.79 sq.
mtr.

8 FLAT
CLUSTER
(R & S)

G+5(2BR unit)

8 FLAT
CLUSTER
(P & Q)

G+6(EWS unit)

12 FLAT
CLUSTER

G+6(3BR unit)

G+6(2BR unit)

CLUSTER PLANNING

2 BEDROOM APARTMENTS (GROUND


FLOOR)

Configuration

Room type

Area

Room type

Area

Living room

16.35 sq.
mtr.

Living room

196sq. ft.

Dining room

14.05 sq.
mtr.

Dining room

164 sq. ft.

Master
bedroom

180 sq. ft.

TV room

148 sq. ft.

Kitchen

100 sq. ft.

Store

39 sq. ft.

Master Toilet

46.75 sq.
ft.

Kitchen

6.5 sq. mtr.

Store

2.30 sq. mtr.

Toilet

4.08 sq. mtr.

Area covered = 141.038 sq. mtrs.

Provision of additional
courtyard
on ground floor

BLOCK A : 3 BEDROOM
APARTMENTS

SERVICES
Electrical

No substation on site

2 transformers were installed.

Electrical panel room was installed in the


basement.
It was located behind the staircase leading
from each block to the parking below.

Storm water management

Centrally placed corridor with


dwellings on both sides

Recharge pits of various sizes are provided.

A main drain runs through the central portion


of the site for storm water management
treatment
The storm pipe varies from 60 0-800mm in
dia.

Area of cluster = 4459.604 sq. mtrs

DWELLING UNIT
ELEVATORS
STAIRCASE

It is made up of RCC.

Plumbing

The main sewer line runs along the site


boundary.
It
is made up ofwere
RCC.installed.
2 transformers

It varies from 150mm in the inner part of the


site to 250mm on the boundaries

The soil waste pipe is 150mm in dia.

Area covered = 830.648 sq.ft.