INTRODUCTION
Day 1:08-11-2021
HEIGHT
Ground Floor to First Floor =4.10m
First Floor to Second Floor =3.20m
Third Floor to Thirteenth Floor = 3x11=33m
13 Apartments
47 flat
4 Type- A B C D
A(Option 1 and 2)
4BHK
B C D - 3BHK
BASEMENT :
Pump room, Parking -2 and 4 Wheelers, Collection
pit ,STP(Soil Treatment Plant) Sump tank[ 1) Domestic, 2)
Rain water harvesting, 3) Flesh, 4) Fire
GROUND FLOOR:
Lobby, Main Lobby, Panal Room, Toilet ( Women, Gents,
Handicap), DG, Driver's rest room, Fire control.
FIRST FLOOR :
3
13TH FLOOR
Terrace , 2 Pergola , Over head tank
3
Day 2:09-11-2021
QUALITY STANDARDS
1 PILE SETOUTING
2 PILING
3 PILE CHIPPING
4 PILE INTERGRITY
5 PCC @PILECAP, PLINTH BEAM & LIFT WELL
6 PILE CAP, PLINTH BEAM, COLUMN & LIFT WELL STEEL
WORK
7 PILE CAP. PLINTH BEAM & LIFT WELL SHUTTERING
8 PILE CAP, PLINTH
9 FLOOR PCC
10 BASEMENT FLOOR SLAB & LIFT WELL CASTING
11 LIFT WALL & COLUMN SHOE
12 LIFT WALL, COLUMN STEEL & SHUTTERING WORK
3
54 CP AND SANITARY →
55 INTERNAL & EXTERNAL WALL FINAL COAT PAINTING→
56 TILE CLEANING & POINTING→
Our STD Final Engg Inspection Procedure
(Process to Ensure Zero Defect Product)
Day 3:10-11-2021
WORK IN PROGRESS
Things we noted
STP= Soil Treatment Plant
118 Pile
Pile Depth: 46m
Soil type of site: Black soil area
Sunken
Cranking
Mix Design: M25 Concrete
Steel fe500D
STRUCTURAL DESIGNS
We go through the plans of structural designs of
drawings .Structural designs is very important for a project.
Structural designing provide all the crucial information about
3
foundations, walls,
floors, roof types, steep beams,
material quality, and more to
ensure that the structure
is built to be safe and sound.
3
Day 4:11-11-2021
Basement
Pressure grouting-pressuring pumb
Ramp work in process for rebar fixing
Reinforcement (slab) work in progress
STP -2' width pipeline trench
First floor
Pergola reinforcement work & column shuttering
External wall plastering work in progress
Second floor
Water proofing (Dr fixit) -liquid + powder
Floor cleaning
Sanitary fittings
Skerting piece work & cutting
3
Third floor
Fourth floor
Water proofing coat
Fifth floor
Wiring work
Sixth floor
Scaffolding
Framework - lift
Wiring work
Seventh floor
Tile work -bathroom,main floor
Eighth floor
Kerb plastering
3
Plumbing
Ninth floor
Wiring
Plumbing
Bathroom flush tank fixing
Tenth floor
Wiring
Painting - fire ducts
Eleventh floor
Pergola -plastering
Twelveth floor
Lift work
Plumbing work -bathroom
Thirteenth floor
Pergola top finishing
3
Day
5:12-11-2021
Visited sample room
(2A)
Visited whole site and
works.
3
3
CONCLUTION
The training section at a live firth made us now the practical
of various theories that are thought in the class room. It
made aware of the planning and activities adopted at site.
Training was very beautiful in each requirement to read
building in a very short span of time.