Re: Permit renewal questions

Aaron Setran to: Brenda Stein


Aaron Setran

03/31/2009 09:34 AM

Brenda: Since PTP is applying for re-issuance of an existing permit, the attachments are n

Brenda:
Since PTP is applying for re-issuance of an existing permit, the attachments are not required. Just have
PTP fill-out the form, reference the existing permit, and send it in w/out attachments. We already have
most of the necessary info on file. I'll let you know if we need anything else, but I doubt that we will.
Thanks, Aaron

Aaron Carr Setran


U.S. EPA, Water Division
75 Hawthorne St.
San Francisco, CA 94105
(415) 972-3457
"Brenda Stein" <brenda@exdengineering.com>

"Brenda Stein" <brenda@exdengineering.com>


03/27/2009 12:18 PM

To

Aaron Setran/R9/USEPA/US@EPA

cc

"Justin Clouser" <jclouser@clouserlaw.com>

Subject

Permit renewal questions

What should we use for the SIC code?


Some of the attachment questions/requirements I simply do not have adequate information for a proper reply.
A. Area of review methods I think this is already set. Is there anything I would need to do now for
this?
B. Are the plans that we have completed for the entire system adequate. If Leon purchases the flight
info, we could have that topo. I am thinking I need to ask him to purchase the information.
C. Are the reports we have submitted good for this. For the corrective action plan, do we just need to
point out that we can turn all the fields on and off as needed?
D. Does this information already exist?
E. N/A
F. Does this information already exist?
G. N/A
H. Can I just attach the proposed permit, or the existing permit?
I.
Can I just attach the proposed permit, or the existing permit?

J.
I am not sure what is being asked here.
K. Can I just use the permit or do I need to restate it?
L. N/A
M. The plans should already be with EPA, or do I need to resubmit them?
N. N/A
O. We will propose to be able to modify the active fields as needed.
P. This is outlines in the permit. Does it need to be restated?
Q. Does this plan already exist or does it need to be revisited anyway?
R. I will talk with Leon about this.
S. N/A
T. I will list the existing permit
U. Do I just say it is a residential subdivision?
That is all I have for today. After I get your response I will talk with Leon and complete the renewal request. Justin
and I met this morning and we are both on the same page.
Thanks Aaron.
Brenda Stein P.E., M.B.A.
Principal Engineer
brenda@exdengineering.com

EXD Engineering & Land Surveying, Inc.


1641 Mono Avenue Minden, Nevada
Ph: (775) 783-4772 Fx: (775) 783-4773