SHIFT HAND-OVER REPORT

Installation / Facility: CS 1

Crew / Department: Drilling

Date: July 31, 2015

Time: 0600 Hrs.

Mud Status: Red


Present Operations:
- P/up, M/up and RIH with TCP guns.

Upcoming Operations:
- Cont. P/up, M/up and RIH with TCP guns.
Equipment Status (Including Equipment Under Repair)
- 4 Engines online with SCR 5 selected.
- Standpipe lined up for drilling.
Permits and/or Isolations in Place:
- As required.

Other Comments:
- Mixing Brine.
- 4.5 IF pin x 5 GPDS box x/over on rig floor.
- Cont. cleaning at lower shaker area.
- TIW at Bucking unit need to m/up with x/over and to be tested at moonpool.
- R/down well test line from rig line and install to schlumberger well test line.
- 3.5 IF TIW is on rig floor.
- 18 BOP adaptor spool covered at platform.
Incoming Supervisor
(Name): Daniel

Position:
Driller

Signature:
Signature:

Outgoing Supervisor
(Name): Sandeep

Position:
Driller

Signature:

REV 00

SEPTEMBER 1, 2011

Form No:

HQS-OPS-PP-01 FM 04