You are on page 1of 1

1- Picking up Drill collars, Heavy weight Drill pipe.

(BHA)
2- Possible slipping of stand.
3- 2 for pipe and 2 for Drill collar. Drill pipe for different size and Drill collar for
different weights.
4- Every Tour / Prior to using.
5- Latches and Jaw are hydraulic and rest are electric.
6- Driller lowers down on rotary when POOH and Driller picks up from rotary
when RIH.
7- Yes F7 & F9
8- TOFS.
9- YES
10-No
11-Prevent overload of motors
12-2 x shear bolts 2 x Allen Bolts
13-Exceeding shear capacity, Picking up stand not fully spun out
14-Spades and shear bolts. Tools required to replace spade.
15-9 DC
16-9 DC.
17-3
18-Ensure tracks clear of obstructions, PA made. Audible alarm and strobe
working
19-Set zero height and 1 / 2 layer
20- Settings set at correct OD for tubulars on latches
21-Pipe clear position DS Pipe clear position ODS
22-Long pipe detection sensor,
23-Stop Respool.
24-9 DC 1 stand
25-9 DC,
26-3
27-Finger # 25 & #26
28-Fingers # 1 to #4
29-10 stands
30-20 stands
31-Stop and Re-index
32-Yes
33-Vision blocked need banksman, 3 DP can be caught in lower latches,
S/R arms can contact derrick beams.
34-Use Banksman
35-While tripping as low as possible, while tripping operations stopped, should
be set down.

You might also like