Professional Documents
Culture Documents
1
11) Rough cut and L/D 20"casing;
12) Final cut and dress 20"casing, N/U 21-1/4"casing head, pack off test;
13) N/U 21-1/4"BOP stack;
14) Function test BOP stack, run test plug and pressure test BOP stack and
relevant equipments as per the standard;
15) Retrieve the test plug, run 20" wear bushing, close the bypass valve of the
wellhead.
26"phase precaution:
Use low WOB and high RPM to keep hole vertical;
26"hole section TD shall be adjusted based on the length of casing to keep
the casing head away from the casing coupling;
Calculate the cutting height of 20"casing accurately, and ensure the cut be
level.
Company Man:
Senior Toolpusher:
Supervisor: