You are on page 1of 7

1 Of 7

Preventive Manitenance report

Preventive maintenance carried at

Orbicular Pharmaceutical Technologies Pvt Ltd.


Plot#53, Aleap Industrial Estate, Behind Pragatinagar
Kukatpally, Hyderabad 72.

preventive maintenance carried by

KamalSai Enterprises
108, Vijayalakshmi Arcade
Plot126-130, Springfield colony, Jeedimetla Vil
Hyderabad 55.

Report No:
Date PM Performed:

Service done by:


Date:

Reviewed by:
Date:

2 Of 7
System Details
Name: ____________
Make:_____________
S. No: ______________
Solvent delivery module:
S. No:

Verification of plumbing connection:

Verification of Electrical connections:

Cleaning of dust in modules:

Checking the condition of rotating parts:

Lubrication of CAM and shaft:

Sonication of Inlet and outlet valves:

Verification of filter at outlet:

Verification of inlet filters:

Service done by:


Date:

Reviewed by:
Date:

3 Of 7

Solvent delivery module:


S. No:

Performance parameters Checked:


Flow:

Pressure:

Remarks:

Comments:

Service done by:


Date:

Reviewed by:
Date:

4 Of 7
Autosampler:
S. No:

Verification of plumbing connection:

Verification of Electrical connections:

Cleaning of dust in modules:

Lubrication of screw bearings and other frictional parts:

Verification of needle position & rack position:

Verification of Consumable status:

Verification of needle rinse/purge operation:

verification of sample cooling unit:

Remarks:

Comments:

Service done by:


Date:

Reviewed by:
Date:

5 Of 7
Column Thermostat:
S. No:

Verification of plumbing connection:

Verification of Electrical connections:

Cleaning of dust in modules:

Verification of heating system:

Verification of Thermal safety system:

Verification of thermal distribution :

Performance check:

Temperature verification:

Set Value

Actual temperature

Remarks:
Comments:
Service done by:
Date:

Reviewed by:
Date:

6 Of 7
Detector:

Module type:

S. No:

Verification of plumbing connection:

Verification of Electrical connections:

Cleaning of dust in modules:

heat removal path cleaning:

Flow cell cleaning:

leak check from flow cell:

Lamp checking/replacement:

Performance parameters:

Remarks:
Comments:

Service done by:


Date:

Reviewed by:
Date:

7 Of 7
Data Acquisition system:

Model of data Acquition system:

PC used:

Verification of communication system:

Software Integrity checking:

Checking of Software control:

Remarks:

Comments:

Miscellaneous:

Final Review:

Service done by:


Date:

Reviewed by:
Date:

You might also like