Why Migration?
Due to aging.
Due to Obsolescence of the components/ modules of DCS - unable to repair
or replace any more
Requirement of meeting change in Environmental regulation
Installation of new systems or process or increase in capacity of the
existing plant calling for change in existing automation requirement.
Bringing most of the controls onto a single platform - for better spares and
maintenance management
ARC - 2012
Migration Possibilities
COMPLETE REPLACEMENT
TRANSITIONAL UPGRADE OF
ELEMENTS OF THE SYSTEM
AFTER
BEFORE
MIGRATION
AFTER
PLUG - IN SYSTEM
TO OBTAIN
THE ADDITIONAL FUNCTIONALITY.
Bharat Heavy Electricals Limited
Electronics Division Bangalore
ARC - 2012
FEW CONSIDERATIONS
Developing a migration cost/benefit analysis
Leveraging existing investments
Determining functional versus value-added replacement
ARC - 2012
FEW CONSIDERATIONS
Selecting the best criteria for new partners and platforms
Handling process suites
Ensuring a solid path to long-term support
Speed, field modules, software capacity, and security.
AFTER
BEFORE
Possibility
to manage modern instrumentation
Not to lose connection with old instruments
Open systems
ARC - 2012
ADVANTAGES OF MIGRATION
State Of The Art Technology
Better Diagnostics
Faster Response
Better accuracy and control
Ease Of Maintenance
Flexible For Modification
Improved Aesthetics
Better Spares Availability
Remote Diagnostics And Information Availability.
ARC - 2012
BEFORE
AFTER
Bharat Heavy Electricals Limited
Electronics Division Bangalore
ARC - 2012
Conducive Environment
Rapid developments in the field of automation and control systems provide the
power plant personnel with immense opportunities to achieve complete
AFTERunits from centralized
process/plant
information access and control of multiple
BEFORE
place, thus ensuring safe, reliable and efficient operation of plant with more
information, data, diagnostic features at operator desk.
AFTER
Bharat Heavy Electricals Limited
Electronics Division Bangalore
ARC - 2012
Potential Market
A large number of 200/250 MW & some 500 MW units majority
being with German / Czech technology are in operation for more
than 15 years and the control platform in last 15 years have
become state of art which provides a high potential for life
extension & efficiency improvement in turn to upgrades in
automation
Rating
Running for
> 15 Years
200/ 210 MW
Running for
> 20 Years
Design
basis
53
LMZ design
KWU Design
200 / 210 MW
37
12
500 MW
12
This all couple with Human Machine Interface to replace the conventional operator interface
ADD-ON OR UPGRADE
OPTIMISATION SOLUTIONS
(SAC)
Mill Reject Systems
Etc.
Instrumentation Scope for R&M of DCS for typical Thermal Power Plant
SYSTEM
PRIMARY
INSTRUMENTS
TRANMITTERS
CONTROL ROOM
DISPLAY/RECORDING
EQUIPMENT
CONTROL DESK
EQUIPMENT & POWER
SUPPLY
SWAS &
GAS ANALYSER
EXISTING
ELECTRO MECHANICAL
INDICATORS AND
POTENTIOMETRIC
RECORDERS
LOCAL / REMOTE
CONTROL THROUGH
PUSH BUTTON &
LAMPS
OBSOLETE
PROPOSED
SMART TRANSMITTERS
PC BASED DATA
AQCUISITION SYSTEM WITH
CRT DISPLAY, VIDEO
PROCESS CONTROL &
SCADA & REMOTE CONTROL,
DATA ACQUISITION FOR
ELECTRICAL SYSTEM,ALARM
MANAGEMENT & HISTORIAN
& SOE etc.
CENTRALLISED VIDEO
PROCESS CONTROL
WITH MINIMUM BACK UP
FOR EMERGENCY SHUT
DOWN.
ON-LINE STATE OF
ART
INSTRUMENTATION
ADVANTAGES
BETTER
AESTHETICS
INFORMATION
AVAILABILIITY AT
A SINGLE PLACE
ENERGY SAVING
BETTER
DIAGNOSTICS
EASE IN
COMMISSIONING &
MAINTENANCE
BETTER
AVAILABILITY OF
SPARES &
SERVICE
SUPPORT
BETTER
ACCURACY AND
CONTROL
Only HMI
Only Integral Controls
Only Station C&I Controls
Only Controls retaining
instrumentation and field
cabling
Add on packages
Total solutions
It can together
or phased
manner based
on the need /
shutdown /
condition of
the equipment
needs change
Unified Training for O&M personnel and Better resource / Spares Management.
Better immunity to noise.
Better structuring and flexibility.
Comprehensive diagnostics
Ergonomic and utilization based Man-Machine interface System
Better response times.
CHALLENGES
System Engineering support.
.BHEL Experience
AFTER
BEFORE
AFTER
Bharat Heavy Electricals Limited
Electronics Division Bangalore
ARC - 2012
CUSTOMER RATING
APGENCO 1X210 MW
SCOPE
SG/TG/
Stn C&I
2X210 MW (LMZ SG/TG/
TURBINE)
Stn C&I
1X210 MW
SG/TG/
Stn C&I
VIJAYAWADA #1&2
APGENCO
IB VALLEY #1
OPGCL
IB VALLEY #2
OPGCL
STATUS
Commissioned in Oct.2009 (Commissioning
done within 55 days )
Under Commissioning
Commissioned in Dec.2009 (Commissioning
done within 45 days)
1X210 MW
2X210 MW
MEJIA #3
DVC
1X210 MW
RAICHUR #1&2
DAHANU
TROMBAY #5 (R&M
been done in stages)
TROMBAY #6 (R&M
been done in stages)
TANDA#1,2,3&4
KPCL
RIL
TATA
POWER
TATA
POWER
NTPC
2X210 MW
1X250 MW
1X500 MW
SG
TG
TG
1X500 MW
TG
DAMANJODI
NALCO
4X110 MW
SCOPE
TG
STATUS
Commissioned in Jan.2010.
HAZIRA
CUSTOMER
RATING
Grasim Industries 10.5 MW
Ltd.
RIL
1X40 MW
TG
JOJOBERA #1
TATA POWER
1X67.5 MW
TG
GGSSTP ROPAR#3
UKAI
PSPGCL
GSECL
1X210 MW
2X120 MW
OBRA# 9 TO 13
UPRVUNL
5X200 MW
PANIPAT#1
HPGCL
1X110 MW
BHATINDA # 3 &4
PSPGCL
2X110 MW
PATRATU # 9 & 10
JSEB
2X110 MW
HARDUAGANJ #7
UPRVUNL
1X110 MW
BARAUNI
BSEB
(NTPC consultant)
2X110 MW
SG/TG
Commissioned.
SG/TG/ Stn Commissioned.
C&I
SG/ Stn C&I One Unit Commissioned. Other
Units Supply is over and under
commissioning.
Stn
Commissioned.
C&I/HMI
SG/TG/ Stn Under Commissioning
C&I
SG/TG/ Stn Under Commissioning
C&I
SG/TG/ Stn Under Commissioning
C&I
SG/TG/ Stn Supplied
C&I
CUSTOMER
KBUNL (NTPC
JV)
RATING
2X110 MW
SCOPE
STATUS
SG/TG/ Stn Supplied
C&I
JSW ENERGY
(TORANAGALLU)
JSW LTD
1 X 130 MW
EHTC
Under Supply
(TMR)/
TSE/GAMP
GNFC
2 X 25 MW TG
TENUGHAT#1
TVNL
1X210 MW
HPBP &
Commissioned.
APRDS
CONTROL
TENUGHAT#1
TNVL
1x210 MW
R&M CARRIED OUT ON HYDRO PLANTS WITH SHORT SPAN OF TIME FOR THE PROJECTS AFFECTED
DUE TO FLOOD.(e.g. SRISAILAM-7X115 MW, RANGIT-3X20 MW, KOTESHWAR-4X100 MW)
FOR MANY PROJECTS IN THERMAL/HYDRO/INDUSTRY EXCITATION SYSTEM R&M IS BEING
CARRIED OUT ON CONTINUAL BASIS.
UNIT 1
BEFORE
AFTER
UNIT 2
AFTER
Electronics Division
Bangalore
ARC - 2012
BHEL ADVANTAGE
BHEL ADVANTAGE