You are on page 1of 7

Standard Production Cycle

Material : Basic Assly-001


MD04 shows planned order as per DepReq of T10000000 (extruder)

Checking of planned order:

BOM and routing is present

Partial conversion of planned order to Prod order

Production order 1000022 is released


Material reservation MB24 for above production order

GI for above prod order using MIGO

Material document 4900000101 is generated

FI document generated

Production confirmation

Goods Receipt for header material (Mat doc: 5000000031)

FI account check

MMBE : to check material availability is storage location

You might also like