Professional Documents
Culture Documents
*TM 10-8340-221-13
CHAPTER 1.
Section I.
II.
Paragraph
INTRODUCTION
General .............................................................................................. 1-1
Description and Data ......................................................................... 1-7
CHAPTER 2.
Section I.
II.
OPERATING INSTRUCTIONS
Siting and Operating Procedures ........................................................
Operation Under Unusual Condition ...................................................
2-1
2-7
2-1
2-1
CHAPTER 3.
Section I.
II.
3-1
3-3
3-1
3-1
CHAPTER 4.
Section I.
II.
III.
4-1
4-4
4-7
4-1
4-1
4-1
CHAPTER 5.
Section I.
II.
5-1
5-3
5-1
5-1
CHAPTER 6.
Section I.
II.
REPAIR INSTRUCTIONS
General ..............................................................................................
Repair of Canvas and Webbing..........................................................
6-1
6-4
6-1
6-2
APPENDIX A.
B.
C.
REFERENCES ....................................................................................................
MATERIAL LIST...................................................................................................
MAINTENANCE ALLOCATION CHART ...............................................................
Page
1-1
1-1
A-1
B-1
C-1
TM 10-8340-221-13
Change No.
HEADQUARTERS
DEPARTMENT OF THE ARMY
WASHINGTON, D.C.,17 March 1989
DISTRIBUTION:
To be distributed in accordance with DA Form 12-25A, Operator Maintenance requirements for Tent, Shelter-Half &
Tent, Mountain, Two-Man.
TM 10-8340-221-13
Change No.
HEADQUARTERS
DEPARTMENT OF THE ARMY
WASHINGTON, D.C.,14 August 1981
TM 10-8340-221-13
Page 4-1 paragraph 4-7b line 2 - Delete "wind resistant cotton twill cloth, 5.8 ounces per square yard" and replace with
"oxford cotton warp with a nylon blend filling."
Page 4-2 paragraph 4-8e line 2- Change TM 10-269 to FM 10-16
Pagee6-2 paragraph 6-3c line 2- Change TM 10-269 to FM 10-16
Page 6-2 paragraph 6-9 line 4 Change TM 10-269 to FM 10-16
Page A-1 paragraph A-2 (2) line 2 is superseded as follows:
MIL-C-43847. Cloth. Oxford, Cotton Warp and Cotton Warp and Cotton and Nylon Blend Filling.
Page A-1 paragraph A-2 (2) line 9- Delete MIL-F-10844 and add MIL-F-10884 (Nomenclature remains the same).
Page A-1 paragraph A-3 line 4- Change TM 10-269, General Repairs for Canvas and Webbing to FM 10-16. General
Repair of Tents, Canvas and Webbing.
Page B-1 Section II Group 10 line 1-Change FSN from 8305-926-1531 to NSN 8305-00-926-9989.
Page B-1 Section II Group 01 line 6- is superseded as follows:
NSN 5325-0-985-6718. Fastener. snap, style 2. finish 2. size 1, MIL-F-10884 (Unit of Mesas HD)
Page B-1 Section II. Group 01. line 7 - Delete line item in its entirety.
Page B-1 Group 01 - after last line item add new line as follows:
PO NSN 8340-00-823-7451, Pin. tent. steel. 12 inch long EA
Page B-1 Section II. Group 02. line Item Description is superseded as follows:
Cloth, oxford, cotton, warp and cotton and nylon blend filling MIL-C-43487.
Page B-1. Section 11. Group 02. line 4 - Delete FSN 8340-262-5765. Kit. repair and add NSN 8340-00-262-5767.
Repair Kit. Tentage.
Page B- 1. Section I. Group 02. line 5 - Delete FSN 8305-256-0184.
Page B-2. line . - Change FSN 8340-263-0250 to NSN 8340-00-263-0252.
Page B-2. Group 02 after the last line Item add new line and "NOTE" as follows:
*PO NSN 8340-00-823-.451. pin. Tent. steel. 12 inch long EA
NOTE
Steel tent pins bar authorized for use in
winter climatic conditions where the
temperature falls below freezing.
By Order of the Secretary of the Army:
E. C. MEYER
General, United States Army
Chief of Staff
Official:
ROBERT M. JOYCE
Brigadier General, United States Army
The Adjutant General
DISTRIBUTION:
To be distributed in accordance with DA Form 12-25A Operator maintenance requirements for Tent, Shelter-Half.
CHAPTER 1
INTRODUCTION
Section I. GENERAL
AMSME-MPP4300 Goodfellow Boulevard, St. Louis,
Missouri 63120. A reply will be furnished directly to you.
1-1. Scope
This manual is for your use in erecting, striking, and
maintaining the shelter-half tent and the two- man
mountain tent.
1-1
1-2
1-3
1-4
CHAPTER 2
OPERATING INSTRUCTIONS
NOTE
Drainage can be improved by trenching
around the tent and digging an outlet ditch
to divert water in the desired direction.
Refer to paragraph 2-8 for trenching details.
c. The site should be protected from wind and
storm.
d. An area with a ground cover of tough top grass is
desirable.
2-1
2-2
b. Ventilation.
NOTE
Ventilation is important in the mountain tent.
because the cloth has been coated to make it
impermeable. The tent can be ventilated by
opening the tunnel entrances or by using the
built-in ventilators.
(1) An 8-inch diameter ventilator with mosquito
netting at the outside opening is at each end of the tent.
In good weather the ventilators are kept wide open by
tying them to the guy lines with tie tapes (fig. 2-1). In
storms, they are left hanging loosely to provide
adequate protection as well as ventilation.
NOTE
To achieve maximum mobility. the tent can be
pitched without using poles and pins; this
procedure is especially valuable in wooded
terrain. However. poles and pins should always
be available.
g. Pitching Tent Without Poles and Pins. The
corners of the tent and the front and rear guy lines can
be secured down with available sticks or stones. If the
ridge of the tent sags, it can be supported by attaching a
line to the loop in center of ridge and securing the line to
a tree. Skis and ski poles can be owed in place of tent
poles and pins.
h. Pitching Tent in Rocky Terrain. In rocky terrain.
it may be impossible to drive tent pins into the ground.
In this case. attach guy lines to rocks.
i. Pitching Tent in Loose and Powdery Snow
Then the snow on which the tent is pitched is loose and
powder). the guy lines can be attached to ski poles or
mountain axes. which are driven down into the snow
after it has been packed. or the lines can be attached to
a "dead man" anchor. This is made be burying a tent
pin or stick horizontal. in a hole in the snow and
stamping snow on top of the anchor until it is thoroughly
packed.
WARNING
The ventilators should never be closed when a
gasoline-burning stove is lighted.
(1) In cold weather. there is an additional reason
for leaving the ventilators open. Unless the moisture
caused by breathing and cooking can pass off into the
outside air. it forms as frost on the roof of the tent. In a
wind. this shakes off and wets clothes and sleeping
bags.
c. Floor. The floor is constructed as an integral part
of the tent. Special care should be taken not to tear the
floor with boots.
2-5. Striking the Too-Man Mountain Tent
a. Untie ventilator and tunnel entrance tie tapes
front guy lines.
b. Remote guy and eave lines from pins.
c. Remove pins from ground.
d. Untie guy lines from webbing loops at front and
rear peaks of tent.
e. Unfasten adapters from poles and remote poles
iron tent disassemble pole..
NOTE
The tent has two tubular tunnel entrances,. 2
inches in diameter and 24 inches long.
(1) A tunnel entrance can be closed by tying it
either from the inside or outside with tie tapes. To tie
entrances wind tie tape around tunnel entrance as if
entrance were the mouth of a bag. and fasten it with a
half hitch.
(2) A tunnel entrance can be kept open by pulling
it out and securing it to a guy line with tie tapes (fig. 211. or it can be rolled against the tent and secured by
tying the tie tapes on the tent through grommets on the
outside opening of the entrance.
(3) Tubular mosquito netting attached to the body
of the tent inside the entrance tunnels can be closed by
tying it tight either from the inside or outside by tie
tapes. To tie the mosquito netting. wind tie tapes
around opening of netting as if it were the mouth of a
bag and fasten it with a half hitch.
2-3
NOTE
There should be enough slope in the trench so
that the water will flow freely toward the outlet
and not back up.
d. When there is possibility that water may flow to
the trench from higher ground, dig a ditch that ,will
divert the water before it can reach the tent.
e. Before the tent lines become water soaked.
loosen them sufficient, so that when the, shrink then will
not pull the tent pins from the ground or tear the tent
body. However, they must remain slightly taut.
NOTE
Pins aluminum 9 (FSN 8340-261-9749) are to
be utilized for hard or frozen ground.
2-5
CHAPTER 3
OPERATOR/ CREW MAINTENANCE INSTRUCTIONS
Interval
and
Sequence No.
D
W
1
2
3
W-Weekly
Time Required
ITEM TO BE INSPECTED
PROCEDURE
TENT LINES AND PINS
Inspect tent lines and pins for looseness and serviceability
TENT BODY
Inspect the body fabric and screening for tears and rips. Examine fabric for evidence of leaks.
FOOTSTOP LINES AND PINS
Check the footstop lines and pins for looseness and serviceability
Work
Time
(M-H)
.10
.10
.10
3-1
tent. In the case of the latter. make sure the pins and
poles are cleaned and dried before being placed with
the tent.
(c} Keep tent clean at all times. If tent is pitched
under trees, inspect the tent roof frequently to see if it is
being harmed by drippings from branches or leaves.
The growth of fungi and mold is caused to some extent
by tree drippings, oils and greases which accumulate on
tentage.
3-2
CHAPTER 4
ORGANIZATIONAL MAINTENANCE INSTRUCTIONS
Code
Expansion
be free of tears and deterioration. The item
will be free from corrosion, rot, mildew, or
other deterioration. Ventilators and tunnels
will be of correct design and free of defects.
All pins, poles, guy lines, foot stops, and
other components will be of proper design
and serviceable. Cement patches will be
accepted if they are intact and secured by
two rows of stitching. Patching will be
limited as follows:
LIMITATION OF PATCHES
Tent. shelter-half
Tent Mountain-two
man
Area patch limitation
Each
Side
6
6
Each
End
4
Each
Tunnel
4
Each
Door
4
-
25%
25%
25%
25%
4-7. General
a. Shelter-Hall Tent. The shelter-half tent is made
of cotton duck material with cotton warp and rayon
filling, oxford. 7.5 ounce per square yard. It is weather
repellent and mildew resistant treated, olive green
shade No. 107. The tent is attached to other shelterhalf tents by snap fasteners with triangular closing flaps
on both ends.
4-1
NOTE
Only lumber that has been thoroughly cured
should be used for dunnage, since the moisture
contained in green lumber will promote the
growth of mildew.
NOTE
Damage in excess of 4 inches in diameter or
length requires a sewn patch.
e. In cases requiring sewn patches, mark the
damaged area according to TM 10-269 and refer the
repair to direct support maintenance.
j. When storing or transporting keep pins and poles
separate from tent except when tent instructions require
them to be packed with the tent. In the (.ate of the
latter. make sure the pins and poles are cleaned and
dried before being placed with the tent.
g. Before storing, dry tent by hanging it up off the
ground in bright sunlight. A tent dried on the ground or
left hanging outdoors after sundown night absorb
enough dampness for mildew to start. When necessary,
a tent can be dried indoors. When drying indoors, hang
the tent in a well-ventilated place, high enough to permit
the tent to be suspended off the floor.
h. Do not drag tentage along the ground or permit it
to come in contact with the ground while in storage.
i.
When storing tent, stack it on dunnages
supported by 2 by 4-inch lumber. If the floor is hard
surfaced or wooden. the tentage should be at least 4
inches from the floor. If the floor is earthen. the tentage
should be at least 8 inches from the ground.
CHAPTER 5
DIRECT SUPPORT MAINTENANCE INSTRUCTIONS
5-1
CHAPTER 6
REPAIR INSTRUCTIONS
Section I. GENERAL
stitching. and backstitch or overstitch breaks and ends
6-1. Stitching
not less than one inch to prevent raveling. Where
Machine stitch all sewing except emergency repairs.
stitching is permitted, use the types of stitches, thread
Operating and maintenance instructions for sewing
size, and stitches per inch as indicated in table 6-1.
machines are contained in TM 10-3530-203-10.
Restitch loose, broken, or defective stitches, Maintain
thread tension to prevent loose
Table 6-1. Stitching Table
Item
Shelter-half tent
Two-man mountain tent
Sewing
operation
Stitch
type
General
Bartacking
General
Bartacking
301
301
Needle
Thread
Bobbin
Stitches
per inch
F
F
E
E
F
F
E
E
6 to 8
28 each
6 to 8
28 each
6-2. Darning
Darning in the shelter-half and two-man mountain tent is
not allowed in the body, door, end, or floor sections.
6-3. Patching
a. Shelter-Half Tent.
(1) Use the watershed patch for general repair
except at ridge of tent where a rectangular type of patch
is required (fig. 1-1).
NOTE
Observe patch limitation table in paragraph 1-4B.
NOTE
A hole or tear in the tentage larger than X inch
and smaller than 4X4 inch in diameter or length
ma! be repaired by- a cemented or sewn patch.
provided the damage is not on a seam, edge, or
in an area sup- porting hardware.
NOTE
Patch damaged area with two patches making
sure to rise an olive drab patch and a natural
patch on the matching surface.
(1) Cut two patches (olive drab and natural) of
equal size, large enough to extend on all sides of
damaged area and allow for a 1/2 inch turn-under.
(2) Place the first patch over the damaged
6-1
6-2
APPENDIX A
REFERENCES
A-1
APPENDIX B
MATERIAL LIST
Section I. INTRODUCTION
(2) Maintenance code indicates the lowest
B-1. Scope
category of maintenance authorized to install the listed
This appendix lists materials applicable to the shelteritem. The maintenance level codes are:
half and the two-man mountain tents or are required for
Code
Explanation
installation, operation. or maintenance.
O
Organizational
F
Direct support
B-2. Explanation of Columns
(3) Recoverability code indicates whether
The following provides an explanation of columns in the
unserviceable items should be returned for recovery or
tabular list of materials. section II.
salvage. Items not coded are expendable.
a. Source. Maintenance and Recoverability Codes
b. Federal Stock Number. This column indicate:
(SAR):
the Federal stock number assigned to the item and will
III Source code indicates the source for the
be used for requisitioning purposes.
listed item. Source code is:
c. Description. This column indicates the Federal
Code Explanation
item
name and any additional description of the item
P
Items which are stocked in or supplied from the
required.
GSA/DSA, or Army supply system and
d.
Unit of Measure (U/M).
A two-character
authorized for use at indicated maintenance
alphabetic abbreviation indicating the amount or
levels.
quantity of the item, e.g., ft. ea. pr. etc.
(2)
SMR
code
PO
Federal stock
number
8305-926-1531
PF
8310-988-1300
PO
PO
PF
PF
PF
PO
PO
8340-263-0254
8340-263-0255
5325-231-6603
5325-290-5930
5325-292-5343
8340-261-9749
8340-223-7849
PF
8305-965-1654
PO
8305-965-1654
PO
PF
PF
8340-262-5765
8305-256-0184
8305-263-2475
PF
PF
8315-262-3373
8315-253-6289
(3)
Description
CLOTH, duck, cotton warp and rayon filling, olive green 107, water repellent
and mildew resistant. MIL-C-43605
THREAD, polyester, type I, class I, sub-class B of V-T-285, size F, olive drab
shade S-1, cable number 66022, 4-ply (4200 yds pkg)
FOOT STOPS. Type II tent guy lines
GUY LINES, type XIII, tent
GROMMET, type II, class 3. Size No. 23
FASTENER, snap, style 2, finish 2 size 1, MIL-F-10884
FASTENER, snap, style 2. finish 2, size 1, MIL-F-10884
PIN, tent, aluminum 9 inch type I. MIL-P-501
POLE, tent, single section and adapter MIL-P-608
GROUP 02-MOUNTAIN, TWO-MAN TENT
CLOTH, cotton, wind resistant twill, type I. Class C. MIL-C-342, olive drab
no. 7 one side, other side white, reversible
CLOTH, coated, nylon, waterproof, tent, floor, type I, class 3, olive drab no. 7,
MIL-C-20696
CLOTH, cotton duck, 9.85 ounce floor shield, class 1, MIL-C-41808, olive
drab no. 7
KIT, repair
CLOTH, nylon netting, type I. MIL-C-3395
WEBBING, textile, cotton, type III, class 4 (water repellent mildew resistant)
1/8 inch wide MIL-W-530
TAPE, textile, cotton, type I natural color, 3/4 inch wide MIL-T-435666
TAPE, textile, cotton, type I, olive drab color, 3/4 inch wide. MIL-T-43566
B-1
(4)
Unit
of
meas.
YD
TU
EA
EA
EA
EA
EA
EA
EA
YD
YD
YD
EA
YD
YD
YD
YD
(1)
(2)
(3)
SMR
code
Federal stock
number
Description
PF
8315-262-2789
PF
8315-253-6292
PF
8310-988-129.
PO
PO
PO
PO
PO
8340-261-9749
8340-223-7849
8340-263-0250
8340-263-0253
8010-298-3865
PO
8010-298-3867
PO
8010-161-7336
TAPE. textile. cotton. type I. natural color. 1 1/2 inches wide. MILT43566
TAPE. textile. cotton. type I. olive drab color. 1 inches wide MILT43566
THREAD. polyester. type I or II. size E natural color V-T-285. 3 ply
(5700 yds / pkg)
PIN. tent. aluminum. 9 inch type 1. MIL;P-501
POLE. tent. single section and adapter MIL-P-608
LINE. tent. eave types LIX and LX. 6 feet long. MIL-L1709
LINE. tent. guy. types LIX and LX. 15 feet long. MIL-L-1709
ENAMEL olive drab color number X24087. Federal Standard 595. class
A., TT-E-529
ENAMEL olive drab color number X24087. Federal Standard 595, class
A, TT-E-529
LACQUER. international orange color number 12197. Federal Standard
595. class A. type II. TT-L-58
B-2
(4)
Unit
of
meas
YD
YD
TU
EA
EA
EA
EA
1 gal
5 gal
CN
APPENDIX C
MAINTENANCE ALLOCATION CHART
Section I. INTRODUCTION
C-1. General
Consists of the comparison of two
a. This section provides a general explanation of all
instruments one of which is a detect standard
maintenance and repair functions authorized at various
of known accuracy. to detect and adjust any
maintenance levels,.
discrepancy in the accuracy of the instrument
b. Section II designates overall responsibility for the
being compared with the certified standard.
performance of maintenance functions on the identified
G-INSTALL: To let up for use in an operational
end item or component. The implementation of the
environment such as an emplacement, site,
maintenance functions upon the end item or component
or vehicle.
will be consistent with the assigned maintenance
H-REPLACE: To replace unserviceable items
functions.
with serviceable like items.
c. Section III lists the special tools and test
I-REPAIR: Those maintenance operations
equipment required for each maintenance function as
necessary to restore an item to serviceable
referenced from section II.
condition through correction of material
d. Section IV contains supplemental instructions or
damage or a specific failure. Repair may be
explanatory notes required for a particular maintenance
accomplished at each level of maintenance.
function.
J-OVERHAUL : Normally. the highest degree
of maintenance performed by the Army in
C-2. Explanation of Columns in Section II
order to minimize the time work is in process
a. Group Number. Column (1). The assembly
consistent with quality and economy of
group number is a numerical group assigned to each
operation, it consists of that maintenance
assembly. The assembly groups are listed on he MAC
necessary to restore an item to completely
in disassembly sequence beginning with the first
serviceable condition as prescribed b!
assembly removed in a top down disassemblymaintenance
standards
in
technical
sequence.
publications for each item of equipment.
b. Assembly Group. Column (2). This column
Overhaul normally does not return an item to
contains a brief description of the components of each
like new zero mileage or zero hour condition.
assembly group.
K-REBUILD: The highest degree of materiel
c. Maintenance Functions. Column (3). This
maintenance.
It consists of restoring
column lists the various maintenance functions (A
equipment as nearly as possible to new
through K). The upper case letter placed in the
condition in accordance with original
appropriate column indicates the lowest maintenance
manufacturing standards.
Rebuild is
level authorized to perform these functions. The symbol
performed only when required by operational
designations for the various maintenance levels are as
considerations or other paramount factors
follows:
and then only at the depot maintenance.
C-Operator or crew
level. Rebuild reduces to zero the hours or
O-Organizational maintenance
miles the equipment. or component thereof.
F-Direct support maintenance
has been in use.
The maintenance functions are defined as follows:
d. Tools and Equipment. Column (4). This column
A-INSPECT: To determine serviceability of an
is provided for referencing b. code the special tools and
item by comparing its physical, mechanical.
test equipment (sec. III) required to perform the
and electrical characteristics with established
maintenance functions (sec. Il).
standards.
e. Remarks. Column (5). This column is provided
B-TEST: To verify serviceability, and to detect
for referencing by code the remarks (sec. II pertinent to
electrical or mechanical failure by use of test
the maintenance functions.
equipment.
C-SERVICE: To clean. to preserve. to charge.
C-3. Explanation of Columns in Section III Not
and to add fuel, lubricants, cooling agents
applicable
and air. If it is desired that elements, such as
painting and lubricating, be defined
C-4. Explanation of Columns in Section IV
separately they may be so listed.
a. Reference Code. This column consists of two
D-ADJUST: To rectify to the extent necessary
letters separated b- a dash entered from Column 5 of
to bring into proper operating range.
section II. The first letter references alpha sequence
E-ALIGN: To adjust specified variable elements
in column 5 and the second letter references a
of an item to bring to optimum performance.
maintenance function. column 3. A through K.
F-CALIBRATE: To determine the corrections to
b. Remarks. This column lists information pertinent
be made in the reading of instrument or test
to the maintenance function to be performed as
equipment used in precise measurement
indicated in section II).
C-1
(1)
(2)
Assembly group
G
r
o
u
p
N
o.
01
02
03
(3)
Maintenance functions
equipment
D
E
F
G
H
I
n
s
p
e
c
t
T
e
s
t
S
e
r
v
i
c
e
A
d
j
u
s
t
A
l
i
g
n
C
a
l
i
b
r
a
t
e
I
n
s
t
a
l
l
R
e
p
l
a
c
e
R
e
p
a
i
r
O
v
e
r
h
a
u
l
R
e
b
u
i
l
d
C
C
C
C
C
C
O
O
O
O
O
O
C-2
(4)
Tools and
(5)
Remarks
..................
..................
..................
A-I
A-I
A-I
Reference
code
Maintenance
Category
Nomenclature
No special tools are required.
C-3
Tool
number
A-I
Remarks
Average, time standard for repair at organizational level of maintenance is 5 minutes for Tent. Shelter.
Half. and 15 minutes for Tent. Mountain. Two-Man. Repairs consist of capabilities contained in
organizational repair kit and other minor repairs mentioned in narrative portion of TM.
Average time standard for direct support level of maintenance is 2 hours for Tent. Mountain. Two-Man.
and 1/2 hour for Tent. Shelter-Half. This is the lowest level of maintenance for machine sewing.
C-4
CREIGHTON W. ABRAMS
General. United States Army
Chief of Staff
Official:
VERNE L. BOWERS
Major General, United States Army
The Adjutant General
Distribution:
To be distributed in accordance with DA Form 12-25A (qty rqr block no. 885 ) Operator requirements for Tent,
Shelter-Half.
PIN: 028536-002
Sincerely
Igor Chudov
http://igor.chudov.com/