You are on page 1of 1

Reference Manual

Section 3: Installation

00809-0100-4100, Rev AA

March 2013

Five-valve Natural Gas configurations shown:


In normal operation, the two block
valves between the process and
instrument ports will be open, and the
equalizing valves will be closed.

Test
(Plugged)

Test
(Plugged)
Equalize
(closed)

Equalize
(closed)

Isolate
(open)

Isolate
(open)

Process

1.

To zero the 3051, first close


the block valve on the low
pressure (downstream) side
of the transmitter.

Drain
Vent

Process

Test
(Plugged)

Test
(Plugged)
Equalize
(closed)

Equalize
(closed)

Isolate
(open)

Isolate
(closed)

Process

Drain
Vent

Process

Note
Do not open the low side equalize valve before the high side equalize valve. Doing so will
overpressure the transmitter.
2.

Open the equalize valve on


the high pressure (upstream)
side of the transmitter.

Test
(Plugged)

Test
(Plugged)
Equalize
(open)

Equalize
(closed)

Isolate
(open)

Process

52

Isolate
(closed)

Drain Vent
(closed)

Process

Installation

You might also like