BASICOFSCAFFOLDING

A. GENERAL

Internationalstandard:
1. BS11391990

2. ANSIA10.81988

3. BSEN7411998

4. BSEN392001

5. OSHAFederalRegulation29CFR,Part1910.28
6. OSHAFederalRegulation29CFR,Part1926(L)
7. AS1576.31991

8. JISG34442004

Indonesianstandard:
1. UndangundangNo.011970

2. PermenNaker&Trans(PER.01/Men/1980)
3. KepalaDirjenBinawas(KEP.20/DJPPK/2004)

:MetalScaffolding&Accessories
:ScaffoldingSafetyRequirements
:ScaffoldingRequirements&TestProcedures
:ScaffoldingTechnicalDeliveryConditions
:SafetyRequirementsforScaffolding
:Scaffold
:ScaffoldingGeneralRequirements

:KeselamatanKerja
:Kesehatan&KeselamatanKerjapadaKonstruksi
Bangunan
:SertifikasikompetensiK3dibidangkonstruksi
bangunan

ThedifferencebetweenBS1139withAS1576.3standard:

BS11391990
IronPipes
OutofDia.
48,330,5mm
Thickness
4,00,5mm
GalvanizedPipes

OutofDia.
48,33 0,5mm
Thickness
410%mm

AS1576.31991
48,330,5mm
4,00,5mm

48,330,5mm
3,20,48mm

miduka@yahoo.com

Scaffolding

:atemporaryelevatedplatform(supportedorunderhung)whichdevelopedandits
supportingcomponentsusedforsupportingtheworkman,material,tool/deviceorboth.*
:bangunanperalatan(platform)yangdibuatuntuksementaradandigunakansebagai
penyanggatenagakerja,bahanbahansertaalatalatpadasetiappekerjaankonstruksi
bangunantermasukpekerjaanpemeliharaandanpembongkaran.**

ThetermsofinstallationofScaffolding:
Weightmax.ofworker

:80kg
JarakantaraLedgerdengandiatasnyadanjarakantaraTransomdengandiatasnyamax.2m
Heightofscaffolding

:min.1,8m
:max.45m(forlight,medium&heavy)
Kemiringanpenguat(bracing)
:35o55o
Kemiringantangga(ladder)

:4:1(75o)dantidaklebihdari6:1
Jarakantaranaktangga

:3002mm
Ukuranpapan(plank)

:225mmx35mm
Ukuranpondasi(baseplate)
:150mmx150mmx6mm
Taliserat(fiberrope)

:16mmdenganbebanangkatmax.50kg
Jarakkabellistriksejajarygberaliran&tidakterisolasi :4,5m

Load&dimensions:

Transom(Lebar)
Ledger(Panjang)
LightDuty(225kg)3workers
2,4m
3m
MediumDuty(450kg)6 workers
1,8m
2,4m
HighDuty(675kg)9workers
1,275m
1,8m

PersonnelsforScaffoldingconstruction:
1. ScaffoldingInspector

:1personnel
2. Helper

:4personnels

InspectionofScaffolding:
1. DiperiksaolehScaffoldingInspector
2. Bengkokyangmempengaruhikerataan(tidaklebih1mmdarisetiappanjang600mm)
3. Bebasdariretak,robek,penyokdankarat
4. Potonganujungpipaharushalus,ratadantidakbergerigi

miduka@yahoo.com

B. SCAFFOLDTERMINOLOGY

HandRail/
TopRail

MidRail

Bracing

Stairway

Decking
ToeBoard

Ledger

Transom

BasePlate

miduka@yahoo.com

miduka@yahoo.com

C. SCAFFOLDINGSAFETYCHECKLIST

Sample

miduka@yahoo.com

D. SCAFFOLDTAG

RedTag

Red Tag shall be putted while


Scaffoldstillinunderconstructed
anddonotreadyforused

GreenTag

Green Tag putted after Scaffold is


already constructed and inspected
by Scaffolding Inspector and
approvedforusedsafely

miduka@yahoo.com

E. SCAFFOLDACCIDENT

Scaffoldaccidentsresultfromarangeofcauses,causedby:
Inadequatescaffolddesign
AbsenceofacompetentpersonlikeScaffoldingInspector'tooverseescaffoldconstructionor
compliancewithsafetystandards
Failureofscaffoldtiewires,bracing,planking,guardrailing,locks.

miduka@yahoo.com

F. REFERENCES

BS11391990,MetalScaffolding&Accessories
AS1576.31991,ScaffoldingGeneralRequirements

SaudiAramco,ScaffoldSafetyHandbook,July2003*
PermenNaker&Trans(PER.01/Men/1980)**
TripatraSHEManualScaffolding