Professional Documents
Culture Documents
TABLE OF CONTENT
1. INTRODUCTION
2. KEY PERSONNEL
3. EQUIPMENT
4. PROJECTS
5. PHOTOGRAPHS
INTRODUCTION
COMPANY DATA
1. Name of company
2. Registration Number
: 822852-X
3. Address (Office)
5. Telephone Number
: 03-89275120 / 012-2975120
6. Facsimile
7. E-mail
: smartdrillingmy@yahoo.com
SCOPE OF WORKS
1. Micropiles
2. Bored Piles
3. Underpinning
4. Water Wells
5. Ground Anchors
6. Soil Nailing
7. Diamond Drilling
8. Slope Stabilization
9. Foundation Equipment
KEY PERSONNEL
: General Manager
Date of Birth
Citizenship
: Malaysian
Education
: SRP Grade A
SPM Grade II
STPM 4 Principles
Experience
1988 1991
Tricon Construction
1991 1993
1993 1997
- Supervisor
1997 2002
Binamas Engineering
- Supervisor
2002 2003
LCK Driller
- Project Coordinator
2003 2004
- Project Coordinator
2004 current
Smart Drilling/
Smart Drilling Sdn. Bhd.
- General Manager
Date of Birth
Citizenship
: Malaysian
Education
: SRP Grade A
GCE O Level English Language (1119)
SPM Grade 1
SAP Bahasa Malaysia
LCCI Third Level Group Diploma in Cost Accounting
STPM 5 Principles
IJAZAH SAUJANA MUDA KEJURUTERAAN AWAM (UM)
MASTERS IN BUSINESS ADMINISTRATION (HRM) (UPM)
DOCTOR OF BUSINESS ADMINISTRATION (UKM)
Experience
1991
- Temporary Teacher
1995 1998
SY PERUNDING
- C & S Engineer
2002 2003
- Faculty Coordinator
(Civil/General Studies/Business)
2004 current
Smart Drilling/
Smart Drilling Sdn. Bhd.
: Mechanic /Supervisor
Date of Birth
Citizenship
: Malaysian
Experience
2007 current
- Mechanic / Supervisor
: Supervisor/Welder
Date of Birth
Citizenship
: Malaysian
Experience
2007 current
- Supervisor/Welder
: Supervisor/Welder
Date of Birth
Citizenship
: Malaysian
Experience
2012 current
- Supervisor/Welder
: Supervisor/Operator
Date of Birth
Citizenship
: Malaysian
Experience
2009 current
- Supervisor/Operator
ROLEN JOHN
Position
: Supervisor/Welder
Date of Birth
Citizenship
: Malaysian
Experience
2010 current
- Supervisor/Welder
ROBMEN B BIDON
Position
: Supervisor/Welder
Date of Birth
Citizenship
: Malaysian
Experience
2007 current
- Supervisor/Welder
EQUIPMENT
EQUIPMENT LIST
A.
1. Casagrande C- 50
2. Watson 5000 CA -2 units
3. NCK 180 2 units
4. Ingersolland RP1000 (G-Klamm)
5. Holy CD120 3 units
6. Helco drilling rig
7. Excavator modified EX200
8. Excavator modified Kobelco
9. Excavator modified Hitachi 045-2 units
10. Underpinning rig 7 units
11. Soil nailing machine 12 units
12. Soil investigation Koken 4 units
B.
Air Compressor
C.
Welding Set
D.
8. 50kVa 2 units
9. 100 kVa 2 units
10. 150kVa
E.
Excavator
1. Hitachi 07
2. Kobelco sk 07
3. Sumitumo F2 280
4. Hitachi EX 120
5. Kobelco 115 SR
6. Hitachi 045
7. Hitachi 02
8. Kobelco 04
9. Kubota 03 2 units
10. PU 50
F.
Crane
1. RB 22 Crawler Crane
2. Linkbelt 35 ton Crawler Crane
3. Sumitomo Linkbelt LS 118 55 ton Crawler Crane 2 units
G.
Pump
H.
Others
PROJECTS
PROJECT EXPERIENCE
1. Ground Anchor Works for the Proposed Contiguous Bored Pile Retaining Wall
Together with Ground Anchors for Petronas Petrol Station at Jalan Jelatik, Ampang,
Kuala Lumpur 2004
2. Tube Well Construction Works for Bungalow at Equine Park, Seri Kembangan 2004
3. Tube Well Construction Works for Bungalow at Taman Bukit Serdang, Seri
Kembangan 2004
4. The Construction and Load Testing of Ground Anchor for KSP Testpile (M) Sdn.
Bhd. 2004
5. Tube Well Construction Works for Store at Taming Jaya, Balakong 2004
6. The Construction and Pull-out Test for Soil Nails at Kampung Hulu, Melaka 2005
7. Micro piling Works at Kampung Hulu, Melaka 2005
8. Tube Well Construction Works for Residential House at Semenyih, Selangor 2005
9. Micro piling Works at Kesas Highway Project, Sri Petaling, Selangor 2005
10. Micro piling Works at Sungai Bunus - 2005
11. Micro piling Works for the Construction and Completion of the Bridges for the
Bridge Replacement Project in Sarawak 2005
29. Continuous Micro piling Works for Kerja-kerja Membaiki Runtuhan Tembok
Penahan Banjir Sungai L Kerayong serta Kerja Berkaitan Ditepi Lebuhraya KLSeremban 2006
30. Site Investigation Works for Kerja-kerja Membaik Runtuhan Tembok Penahan
Banjir Sungai Klang serta Kerja-kerja Berkaitan di tepi Pangsapuri Pinang 1C,
Taman Sri Sentosa - 2007
31. Bored Piling Works for Kerja-kerja Membaik Runtuhan Tembok Penahan Banjir
Sungai Klang serta Kerja-kerja Berkaitan di tepi Pangsapuri Pinang 1C, Taman Sri
Sentosa 2007
32. The Construction and Completion of Underpinning Works for Apartment in Section
10, Wangsa Maju, Kuala Lumpur 2007
33. The Construction and Completion of Rock Bolting Works at Keramat, Kuala
Lumpur 2007
34. Micro piling Works for The Construction and Completion of Jalan dari Kampong
Tekek ke Kampung Juara, Pulau Tioman 2006 to 2007
35. Micro piling Works for Projek Pembangunan Jeti di Negeri Terengganu Darul Iman
(Pakej 2) Jeti Pasir Air, Pulau Lang Tengah dan Jeti Teluk Kalong, Pulau Redang
2007 to 2008 (Contract Sum RM 100k)
36. Micro piling Works for Projek Mengganti Jambatan Rosak No. FT 005/252/80, Di
Laluan Persekutuan 005, Daerah Alor Gajah, Melaka 2008
37. Coring Works at West Port, Port Klang, Selangor 2008 (Contract Sum RM 60k)
38. Micro piling Works for Texas Instrument, Ulu Kelang 2007
39. Underpinning Works for Central Sugar Refinery (CSR), Shah Alam, Selangor 2008
40. Micro piling Works for The Construction of Bungalows at Bangsar, Kuala Lumpur
2008 (Contract Sum RM50k)
41. Micro piling Works for The Construction of Bungalows at Taman Desa, Kuala
Lumpur 2008
42. Micro piling Works for Texas Instrument, Ulu Kelang 2008 (Contract Sum RM
40k)
43. Cadangan Pembangunan Projek Pendidikan bagi SMK Bengkongan, Kota Marudu,
Sabah (1490 points) 2007 to 2008 (Contract Sum RM1.2 million)
44. Proposed Bangunan Pejabat Lembaga Hasil Dalam Negeri, Cawangan Sandakan Di
Lot 075504344 KM11, Di Jalan Persekutuan A, Off Jalan Labuk, Sandakan, Sabah
(503 points) 2008 (Contract Sum RM 1.5 million)
45. Cadangan Merekabentuk, Membina, Menyiapkan dan Mengujiterima Rumah
Pangsa Kelas D (24 Unit), Kelas F (30 Unit) dan Kelas G (48 Unit) Di Hospital
Slim River, Perak (425 points) current (Contract Sum RM800k)
46. Micro piling works for TNB, Melaka 2008 (Contract Sum RM 13k)
47. Kemudahan Laluan Awam ke Tapak Solar Hybrid di Pulau Perhentian Kecil,
Trengganu Darul Iman 2008 (Contract Sum RM 121k)
48. Pembinaan Jeti di Tembok Danau Stesen Utama (Pulau Penyu) Dan Pulau Ular,
Taman Pulau Tiga, Sabah -2008 (Contract Sum - RM300k)
49. The Execution and Completion of Civil Works for Proposed 1 unit of Indoor
Generator Circuit at Block 3 (ST34) Lumut Power Plant, Perak Darul Ridzuan
2008 (Contract Sum RM 33k)
50. Micro Piling Works for Cadangan Pindaan dan Pengubahsuaian kepada Pintu
Gerbang yang sediada, di Kuil Subramaniam, Lot 31849, Jalan Raja Musa Aziz,
Ipoh, Perak Darul Ridzuan 2009 (Contract Sum RM181k)
51. Micro Piling Works for Cadangan Membina Jejantas Tertutup bagi Cadangan
Membina Jejambat Menyambung Jalan Dewan Bahasa ke Jalan Hang Tuah, Kuala
Lumpur 2009 (Contract Sum RM112k)
52. Cadangan Kerja-kerja Membaiki Cerun Runtuh di Jalan Seremban Kuala Klawang,
Daerah Seremban, Negeri Sembilan 2009 (Contract Sum RM532k)
53. Micro Piling Works at KL PLAZA Refurbishment Works, Kuala Lumpur 2009
(Contract Sum RM140k)
54. Micro Piling Works for Proposed Upgrading of the Existing District Cooling Plant
at the Curve on Lot PT. 40037 (Bahagian Lot 70), Mutiara Damansara, Mukim
Sungai Buloh, Daerah Petaling, Selangor 2010 (Contract Sum RM362k)
55. Soil Nailing Works at Sungai Merab, Bangi, Selangor 2010 (Contract Sum
RM8k)
56. Cadangan Membina Rumah Banglo 3 Tingkat dan 1 Tingkat Bawah Tanah Di Atas
Lot PT 36657, No. 51, Jalan Penaga, Bukit Bandaraya, Mukim Kuala Lumpur
2010 (Contract Sum RM46k)
57. Micro Piling Works Telecommunication Tower Project at Bukit Tambun 2010
(Contract Sum RM41k)
58. Micro Piling Works for Projek Menggantikan Jambatan-Jambatan Lama di
Kawasan Pedalaman Negeri Sabah, Sub-Pakej 6: (Tambunan, Kota Belud, Pitas &
Beaufort) ongoing (Contract Sum RM272k)
59. Micro Piling Works at Proposed Crossing at Sg. Pegalan, Tenom (Binaie Bridge),
Sabah 2011 (Contract Sum RM1.15 million)
60. Micro Piling Works for Kuarters Kakitangan Kementerian Pertahanan at Kuantan
2011 (Contract Sum RM1.3 million)
61. Micro piling Works & Foundation Work for Ko-Nelayan Complex Kuala Penyu ,
Sabah 2011 (Contract Sum -RM1.3 million)
62. Micro piling Works for Persimpangan Bertingkat at Jln Tun Razak, Jln Pudu,Jln
Cheras,Jln Chan Sow Lin, Kuala Lumpur -2011 (Contract Sum RM820k)
63. Micro piling Works for Proposed Nuclear And Radiotheraphy Medical Centre,Likas
Specialist Hospital, Kota Kinabalu, Sabah -2011 (Contract Sum RM1.8 million)
64. Micro piling Works for Proposed Bridge at Sg. Timbang, Jalan Sarang / Dudar,
Kota Belud, Sabah-2011 (Contract Sum RM40k)
65. Micro piling Works for Bungalow at Bukit Damansara, Jln Penaga, Kuala Lumpur.2011 (Contract Sum RM180k)
66. Underpinning Works for Existing Kingfisher Bridge, Kota Kinabalu, Sabah 2011
(Contract Sum RM600k)
67. Soil Nailing for Slope Protection, Upper & Lower, Bukit Bendera, Sabah 2011
(Contract Sum RM60k)
68. Micro piling Works for Pembangunan Hospital Queen Elizabeth (Pakej 4) 2012
(Contract Sum RM600k)
69. Micro piling Works for Sg Lidong and Sg Lutok Bridge, Lawas, Sarawak 2012
(Contract Sum RM1.8million)
70. Soil Nailing for Jln Cheng Ming, Sandakan, Sabah 2012 (Contract Sum RM120k)
71. Bored Piling & Jetty Works for Cadangan Pembinaan Pejabat Daerah Agensi
Penguatkuasaan, Maritim Malaysia, Sandakan, Sabah 2012 (Contract Sum
RM6.08million)
72. Bored Piling for Pembinaan Jambatan ke Wanita Dan Kanak-Kanak Kingfisher,
Kota Kinabalu, Sabah -2012 (Contract Sum RM 130k)
73. Bored Piling for Project Pembaikan Cerun Di KM 4.30, Jalan Inobong Putaton
Bansadon, Penamapang, Sabah 2012 (Contract Sum RM 2.1 million)
74. Sheet Piling Works at Kimanis Power Plant, Sabah 2012 (Contract Sum RM
142k)
75. Micro piling Works for Protection Wall for Road Embankment at Jln Ulu Sapi, Jln
Lalang & Jln Airport Quarry, Sandakan, Sabah 2012 (Contract Sum RM 160k)
76. Micro piling Works for 300MW Combined Cycle Power Plant at Gonopis Sub
station, Kota Kinabalu, Sabah -2012 (Contract Sum RM 270k)
77. Continuous Micro piling Works for Pump Pit at 300MW Conbined Cycle Power
Plant, Kimanis, Sabah - 2013 (Contract Sum RM 500k)
78. Micro piling Works at Jambatan Ulu Bandukan KM0.00, Jalan Ulu Bandukan,
Keningau, Sabah 2013 to 2014 (Contract Sum RM600k)
79. PROJEK MASS RAPID TRANSIT LEMBAH KELANG JAJARAN SUNGAI
BULOH - KAJANG. Supply and Install Ground Anchor in Existing Basement at
Plaza Warisan and UO Superstore, Pasar Seni Station 2013 to 2014 (Contract Sum
RM721K)
80. Ground Anchor Works at Jalan Istana KM0.20, Kota Kinabalu, Sabah 2013 to
2014 (Contract Sum RM200k)
81. Supply Labour & Machinery for Micro pile, Soil nail, Gabion wall and Backfilling
Works for Slope Strengthening at KM0.30, Jalan Menteri, Kota Kinabalu, Sabah
ongoing (Contract Sum RM234k)
PHOTOGRAPHS
KL Plaza 40m
KL Plaza 40m
Tenom
LHDN, Sandakan
Sandakan