Professional Documents
Culture Documents
Consideraciones para Zonas de Riesgo Sismico
Consideraciones para Zonas de Riesgo Sismico
PREDIMENSIONAMIENTO DE ZAPATAS
350
120
100
100
60
730
300
1030
5
210
kg/m2
kg/m2
kg/m2
Kg
Esf terreno=
NFC=
Peso esp. =
Sobregarga=
Esf.neto=
kg/cm2
3.00 kg/m2
1.5 m
1.8 t/m3
0.5 t/m2
26.8 t/m2
Secion cuadrada
B(m)
T(m)
1.43
1.43
1.47
1.47
1.30
1.30
1.43
1.43
Secion rectangular
B(m)
1.50
1.50
1.50
1.50
Area tributaria
8.50
9.00
7.07
8.50
C2 (Exterior)
1042.26
1103.57
866.92
1042.26
b(cm)
25
25
25
25
t(cm)
41.69
44.14
34.68
41.69
Z2(area m2)
2.04
2.16
1.70
2.04
Area tributaria
15.68
16.62
13.00
C1(Interior)
1409.96
1494.48
1168.97
25
25
25
56.40
59.78
46.76
T(m)
1.94
2.00
1.77
B(m)
1.50
1.50
1.50
Area tributaria
8.50
7.07
9.00
7.07
C4(Esquina)
1563.39
1300.38
1655.36
1300.38
25
25
25
25
62.54
52.02
66.21
52.02
T(m)
1.43
1.30
1.47
1.30
B(m)
1.50
1.50
1.50
1.50
diam.
1/2"
5/8"
3/4"
Secion rectangular
T(m)
1.36
1.44
1.13
1.36
cm2
1.29
1.99
2.84
Peralte
h(cm)
60.00
60.00
60.00
60.00
Acero minimo
B(cm2)
T(cm2)
16.20
14.70
16.20
15.57
16.20
12.23
16.20
14.70
Espaciamiento 5/8"
B(cm)
T(cm)
12.28
13.54
12.28
12.78
12.28
16.27
12.28
13.54
T(m)
2.51
2.66
2.08
h(cm)
60.00
60.00
60.00
B(cm2)
16.20
16.20
16.20
T(cm2)
27.12
28.74
22.48
B(cm)
12.28
12.28
12.28
T(cm)
7.34
6.92
8.85
T(m)
1.36
1.13
1.44
1.13
h(cm)
60.00
60.00
60.00
60.00
B(cm2)
16.20
16.20
16.20
16.20
T(cm2)
14.70
12.23
15.57
12.23
B(cm)
12.28
12.28
12.28
12.28
T(cm)
13.54
16.27
12.78
16.27
PREDIMENSIONAMIENTO DE VIGAS
A/B
Sobrecarga
kg/m2
250
500
750
1000
250
500
750
1000
alfa
beta
13
11
10
9
13
11
10
9
13
11
10
9
11
10.3
9.2
8.3
x
3.10
4.06
1.15
y
5.00
5.00
5.00
A/B
0.620
0.812
0.230
V1
V2
V3
b
0.155
0.203
0.058
h
0.485
0.485
0.485
base
0.25
0.25
0.25
Usamos
peralte
0.49
0.49
0.49
VIGAS SECUNDARIAS
V3
V4
V5
0.155
0.203
0.058
0.24
0.27
0.30
base
0.25
0.25
0.25
peralte
0.24
0.27
0.30