Professional Documents
Culture Documents
Bo 2-8
Bo 2-8
Clear Berth
It is important that vessels should have a clear berth to go to
upon arrival, particularly in respect of specified vessels and
those which may have a problem in aborting their inward
passage. The berth must liaise closely with ships agents and
the PLA if delays are expected.
Develop abort procedures
The berth operator should have in place arrangements to give
early warning to the PLA when it is thought that the arrival of
an inward bound vessel may need to be aborted due to adverse
weather, berth delays or other unforeseen circumstances.
(Please ensure that the PLA is aware of your arrangements for
a standby/emergency berth).
Comply with recommendations of Code of Practice for the
Safe Mooring of Vessels on the Thames, particularly in
respect of mooring gangs and self-mooring
Section 4.2 of the PLAs Code of Practice for the Safe Mooring
of Vessels on the Thames sets out the berth operators
responsibilities in respect of mooring operations under the
Docks Regulations 1988, the Management of Health and Safety
at Work Regulations 1999 and the Merchant Shipping Act 1995,
which berth operators should comply with. Other useful
guidance is contained in the HSE document Managing Health
& Safety in Dockwork. Berth operators must also ensure that