Professional Documents
Culture Documents
1.050
m
Adukan K-175 Readymix
825,000.00
Pekerja
2.500
Oh
45,000.00
Tukang batu
0.250
Oh
60,000.00
Kepala tukang batu
0.100
Oh
75,000.00
Mandor
0.010
Oh
85,000.00
866,250.00
112,500.00
15,000.00
7,500.00
850.00
Jumlah
Dibulatkan
892,500.00
112,500.00
15,000.00
7,500.00
850.00
Jumlah
Dibulatkan
866,250.0
112,500.0
15,000.0
7,500.0
850.0
1,002,100.
1,002,100.00
892,500.0
112,500.0
15,000.0
7,500.0
850.0
1,028,350.
1,028,350.00