Professional Documents
Culture Documents
EVENT
ANALYSIS
1. Event No. 3
REPORT
UNIT NO. 1
Date 24.03.08
Oil Support
164 MW
A, B, C, E, F
Nil
3. Nature of Event : Unit withdrawn to attend Water Wall tube leakage near soot Blower IR
26.
4. Observations :
At 10:00 hrs feed water flow increased by 50 tones .also furnace found pressurised, tube
leakage voice
noticed at RHS water wall.
5. Analysis
Date 25.03.2008
Date 26.03.2008
9.
Remarks Nil
General
Manager-I