Datez /

(!0 54 g 6
MNEr,YSISREPORT

Ref. No. CHN/POG.TriPPin gl C-421

UNIT NO i 6
1. *HO Code:

TPS: Chandrapur Super Thermal Power

Station Code:

CSTPS U6

Station

Time10:07 Hrs

TOB 2OI3-14

B DEC 2013

Unit Capacity: 500 MW


No. of days from last
DateLslLL|20L3 sync.:- 18.5

2310812012

Last Overhaul (AOH) synchronisation Date

rr
ons at the time of Event
Coal Cycles in seruice

Oil Suppoft

A,C,D,E,F,G

oiler Tube Leakage)


ion on which GCB triPPed:
push Button, Boiler to Turbine Tripped and Generator Tripped on Reverse
Boiler Hand rrippeo ilv operating Manual
Power Protection.

5 A) Obseruations :primary Failure: LTSH (Upper) Assy. No. 58 Coil No. 116 Tube No. 7 found pin hole Punctured'
Secondary Failure:
eroded.
1) LTSH (U-pp"r) Assy. No. 58 Coil No. 115 Tube No. 7 found
Zi UfSff Rssy. trtos. 56,57 & 58 hanger tube no. 1 found eroded.
fi nffS steam cooled wall LHS to LRSB 123 tube no. 7 eroded.

nemedial Action/work done :fotit t+ joints carried out. Eroded tubes in coil no. 115,
S e1

SCW and hanger


dislocation.
shielding of tubus carried out with proper locking to avoid

no.

replaced with new spools.

6. Root Cause AnalYsis :Failure appears due to Flue Gas Erosion.


n suggested (Short Term) 'I- Nil
ring forthcoming overhaul of unit-6 in JulY-I4, LTSH tube
or protected with shields. SS shields will be locked to avoid
thickmess will be cneckedlioded tubes will be replaced
the dislocation.

9. Similar event occurred last time: Unit


withdrawn to attend Boiler Tube Leakage at u# 6, 130 MW
LTSH zone (Boiler Tube Leakage)

Time :

16:38 Hrs

Date: 2610612013

easures stated at Sr No 9:Arc welding done'


Shoft Term: 'V' groove made along the crack up to root' TIG and

Long Term:

Nil

10. Boiler lighted

uP

11. T-A Set SYnchronised

Time

' 01:00 Hrs

Time'

L3:47 Hrs

Date-

L7

lLLl20L3

Date- L7 lLL|20L3

L2. Remark :- Nil

n
(M

Chief BAdineer (o&M)


CSTPS, Chandrapur.

13. Recomendations of Works Section:


1. Procurement/RePlacement Plan:
2. Operational Error:

3. Delay in Maintenance:
4. Delay in bringing back the Unit:
5. Training of Staff:
6, Whether remedial action is completed satisfactory & point is closed

CE/DyCE(Works)