Date- 01112/20L3
Boiler tripped on Furnace pressure Very High and TA set tripped on protection.
4, Name of Protection operated (First Up) and any other main protectians operate*
l) Reverse Power protection 32G1J32G2,& Low forward protection 37GtJ37G2^.
ll) STG2 TR REL 186 B operated.
lll) STG2 TR REL 286 B operated.
5.observations:-CoalMillCD&EFwereinservice*it
withdrawaI of coal mill AB, A side purging was completed (classifier outlet gate
closed] and B side purging was in progress.
Suddenly coal millAB got pressurized above 1.400 mmwc at both A & B side,
noise level*rr rlorirOr;
lurjrace qfe.ssure shgot up to +L29 mmwc & boiler tripped on furnace pressure very high protection.
5. RemedialAction / Work done:
After inspection, boiler lighted up at 02:55 Hrs on date 01./L2/20L3 and TA
set synchronized at 04:49 Hrs on date
;;;;il;;:;;,,
ou12/2013.
Time:
10:24 Hrs
Date:
25/L1,/2013
loA.lmplementation status of Long / short Term measures stated at sr. wo. ru_
short term: lnstruction has been issued to operation staffthat while withdrawal of
coal mill, when purging of anv one side
-in progress there should be at least 30 tph PA cold air flow through mill in
each side of coal mill. sv prrl ;;rp;; ffi;
locked as per feedback received from Chandrapur STpS.
long term: Letter has been send to B.H.E.L. Services, Nagpur & N.T.P.C. for further guidance.
Time- 02:55
Time- 04:49
14. Recommendations
of Work
Hrs
Datet 0t/12/20L3
Hrs
Date:01,/L2/2013
Section: