EVENT ANALYSIS REPORT

TPS: PARAS THERMAL POWER STATION

Time- 02:13 Hrs.

Date- 01112/20L3

Unit Capacitv: 250 MW


No. of days from last sync.:
05 days 06 hrs 29 min.

Conditions at the time of event:-

Boiler tripped on Furnace pressure Very High and TA set tripped on protection.
4, Name of Protection operated (First Up) and any other main protectians operate*
l) Reverse Power protection 32G1J32G2,& Low forward protection 37GtJ37G2^.
ll) STG2 TR REL 186 B operated.
lll) STG2 TR REL 286 B operated.

5.observations:-CoalMillCD&EFwereinservice*it
withdrawaI of coal mill AB, A side purging was completed (classifier outlet gate
closed] and B side purging was in progress.
Suddenly coal millAB got pressurized above 1.400 mmwc at both A & B side,
noise level*rr rlorirOr;
lurjrace qfe.ssure shgot up to +L29 mmwc & boiler tripped on furnace pressure very high protection.
5. RemedialAction / Work done:
After inspection, boiler lighted up at 02:55 Hrs on date 01./L2/20L3 and TA
set synchronized at 04:49 Hrs on date

;;;;il;;:;;,,

ou12/2013.

7. Root Cause Analysis :


Prior to tripping of boiler: After cut in of coal mill cD, purging of coal mill AB
was in progress. when A side pA flow through
mill was stopped. coal millAB, mill inlet pressure shoot up 1431 mmwc& 1445
mmwc at A & B side respectively. ln next
millisecond furnace got pressurized all three'Furnace pressure high'switches got
operated (Transmitter value above+ 129
mmwc) and boiler tripped on furnace pressure very high protection. Furnace got
over pressurized

through Coal Mill AB.

8. Preventive action suggested (Short Term):- Nil


9. Preventive action'suggested ( long Term] :- Nil
10. Similar event occurred last time:-

Time:

10:24 Hrs

Date:

25/L1,/2013

loA.lmplementation status of Long / short Term measures stated at sr. wo. ru_
short term: lnstruction has been issued to operation staffthat while withdrawal of
coal mill, when purging of anv one side
-in progress there should be at least 30 tph PA cold air flow through mill in
each side of coal mill. sv prrl ;;rp;; ffi;
locked as per feedback received from Chandrapur STpS.
long term: Letter has been send to B.H.E.L. Services, Nagpur & N.T.P.C. for further guidance.

Time- 02:55
Time- 04:49

14. Recommendations

of Work

Hrs

Datet 0t/12/20L3

Hrs

Date:01,/L2/2013

Section:

1. Procurement/ Replacement plan:


2. Operational Error:
3. Delay in Maintenance:
4. Delay in bringing back the unit:
5. Training of Staff:
5.

whether remedial action is completed satisfactory & point is ctosed