I Ref. No. CHN/POG.Tr|ppin g/C-421


Date:
EVEI{TANALYSNM
UNIT NO : 5 TPS: chandrapur Super Thermal power station
Unit Capacity: 500 MW
1. *HO Code: Station Code: CSTPS U5 Time- No. of days from last
Tr4 2015-16 L7:IB Hrs sync.:- 29.33
Last overhaul (coH) synchronisation Date 3rl0Bl20L3
2. operating conditions at the time of Event ,-
Coal Cycles in seruice Oil Suppoft
A,B,C, E, F, G
3. Nature of Event :
Unit tripped on Flame Failure.
4. Name of First Up, Main Protections a protect
Boiler tripped on Flame Failure, Boiler to turbine tripped
on interlock, Generator tripped on Reverse power protection
operated,
5 A) Observations :-
Unit was running with 377 MW load with coal mill A,B,c,E,F,G in
service, Suddenly Unit tripped on Flame failure.

5 B) Remedial Action/work done .-


FSSS unit panel primary & reduntant protection logic controllers checked,
found healthy.
FSSS panel during set normalisation,

6. Root Cause Analysis :- No a


may have resulted into furnace flame disturbance & ultimately flame
failure tripping.

7. Preventive action suggested (Shom


8. Preventive action suggested (l-ong Term) :- Nil

9. Similar event occurred last time:

9A. Implementation Status of ton


Short Term: ---
Long Termr ---

10. Boiler lighted up Time - 17.55 Hrs Date- 17lL2l20ls


11, T-A Set Synchronised Time - 19,55 Hrs Date- L7 li2l20l5

,'ytf 1
L2. Remark :

crjerMo&M)
CSTPS'Wrandrapur.

13. Recommendations of Works Section:


1, Procurement/Replacement Plan: ,

2. Operational Error:
3. Delay in Maintenance:
4. Delay in bringing back the Unit:
5. Training of Staff:
6. whether remedial action is completed satisfactory & point is closed :

CEIDy C E (Works)
*HO Code will be given by Works Section.