Minutes of meeting held amongst M/s MICCO, M/s Primetals, MECON & NMI for (Gas Holder in

SMS Complex (Pkg-06) on 21.06.2022, at NISP


Nagarnar

Members Present:

M/s MICCO M/s Primetals MICON NMDC


Shri Kush Manna Shri Ashish Dhawle Shri S.K. Katiyar (WMC-EMD) Shri T. K. Dey (1MID)
Shri P. Mandpey. (FSPD) Shri Akash Chaudhary. (SMS)
Shri Lucky Rana. (SMS)

A n tinspectionwas done by representative of M/s MICCO. M Pimetal, MI cON & NMI of BO-Cias
Tlolder Proper on lDid.-16.06.2022 & 17.06.2022. Followed to inspection the below indicated points iwere discusseu
and agrecd upon:-

A. Electrical & Instrumentation balance work:-


SI. No. Deseription of activity Date of Completion
arthing of Gasholder along with carth pits. 4 nos At the earlicst
Lightning protection system of Gasholder as per drawing At the carliest
Aviation Lamp 3 nos. to be erected at the
lop of gasholder. At the carliest
Laying of instrument cable for gasholder to be complcted. At the carliest
Instruments mounting with necessary tubing shall be At the carliest
completed.
Limit Swilch-8 nos.,
Pressure Transmitter-2 nos.,
Temperature Transmitter-2 nos.,
Load Cell- 2 nos. as per P&l & drawing
. Supplicd & erected of CO gas dctectors. Shall be done 2 month
prior to relractory
ining o! 1BO} convertor
1. Calibration/Commissioning ol Instruments Shail be done priuor to
conducting trial run of
(ius Holder Proper.

B. Mechanical balance/rectification work:


. No. Description of activity Date of C ompletion
.Ocation- Roof
Modification of center roof vent of Gasholder to be done to AL the carliest prior to
preventingressof water inside Gas Holder. rainy season
Instrument opening (Load Cell) and lock strip of rope pulley of At the earliest
the roof top to be fíxedproperly.
Preventive action/rectification of the rusted portion at the At the earliest
peripheryof roof platform.
Providing handle on vent line in VR-pipe At the carliest
Pulley erecasing_ AL the earliest
L.ocation -Inside Gas Holder
6. Preventive action/rectilication of the rusted portion at the At the carliest
periphery of piston top arca
Manhole of the piston to be checked and adequate size of bolt to At the earliest
be providcd
3. I land railing of the monkey ladder at the inside of gaas holder to At he earliest
be lised
Ocalion Outside Gas Ilolder
9. Providing seal pot lid N the earliest
10. Filling of gap between botlom plate & foundation AL the eriest
Painting of water pipcline along with support At the carliest
2. Pressure testing of water & nitrogen pipeline of gas holder At the earliest
proper
13. Preventive action/rectification of the rusted portion at the bottom AL the earliest
of gas holder outer shel.
4. Providing manhole's bolt of the gas holders adequate sizeALthe earliest
15. Preventive palch paining of gas holder outer shell at rusted Atthe earliest
1 of 2

L
Minutes of meeting held amongst M/s MICCO, M/s Primetals, MECON & NMDC for (Gas Holder in
SMS Complex (Pkg-06) on 21.06.2022, at NISP Nagarnar

SI. No. Description of activity Date of Completion


portion
At the carliest
16. NDT ofthe bottom shell plate and piston top where corrodecd
17. Demonstration of trial run of Gas Holder proper with all mounted At the earliest
instruments, electrical & mechanical items
8. Removal of bushes/ plants at the surrounding of (ias 1lolder. The AL the earliest
civil work for drip pot afier removal of plants shall be conereted.
19. ligh mast light in gas holder complex shall be provided AL the earliest

20. Shall be done 2 month


Final coat painting of Gas IIlolder Proper
prior to relractory
lining of 3OF convertor

P:my
M/s MICCO M/s Primetals MIECON NMDC