M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
ENCLOSURE - 1
I. GENERAL
502084648.doc
2 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
Material consumption
Power kWh/thm
Blower wind M 3 /thm 1098
Water M 3 /thm
Chilled water M 3 /thm
Comp. Air Nm 3 /thm 5
Oxygen Nm 3 /thm 41.7
Nitrogen Nm 3 /thm 16.5
BF gas Nm 3 /thm 613
502084648.doc
3 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
CO gas Nm 3 /thm 26
Steam kg/thm 15
Refractories kg/thm gun clay 0.5, runner clay 1, sand
0.6. coke fine 1, rice shell 0.3
Others overhead
Main power
Integrated repair No. for design blow-down ratio: 4.11%
duration the plant
Intermediate repair Hrs
duration
Interval of repairs
Notes:
(a) All the items are dry & net.
(b) THM – ton of hot metal
502084648.doc
4 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
Relative humidity :
Absolute maximum 100%
Absolute minimum 4%
Highest monthly mean 88%
Lowest monthly mean 51%
Rainfall :
Highest annual 1314 mm
Highest monthly mean 606 mm
Highest daily 293.3 mm
Max hourly intensity 63 mm
Max. intensity for 15 minutes 32.3 mm
Max intensity for 5 minutes 13.5 mm
Wind velocity :
Max. mean monthly wind velocity for 21.4 km / hr.
24 Hrs.
Extreme wind velocity 131.0 km/ hr.
Earthquake factor Zone II as per
IS:1893
The above changes are shown in the enclosed Sketch No. SK-1.
502084648.doc
5 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
6 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
7 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
8 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
- Parking angle
502084648.doc
9 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
10 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
11 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
12 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
- Expected life The wears and tears, seal, spring and bearing and
bearing need replacement, Other parts can stand for one BF campaign
- Maintenance hoist Rotary crane is located on top for
maintenance and replacement.
- Sequence of operation
When difference between top gas actual pressure (Pp) and setup
pressure (Ps) is at certain value, bleeder valve must be opened.
Differentia pressure settings for bleeder valve opening are given from
CRT:
△P 1=0.01 MPa ( can be corrected)
△P 2=0.015 MPa ( can be corrected)
△P 3=0.02 MPa ( can be corrected)
△P 4=0.025 MPa ( can be corrected)
when Pp-Ps= △ P1 , command NO.1 top gas bleeder valve “open”.
NO.1 valve is opened;
when Pp-Ps= △ P2 , command NO.2 top gas bleeder valve “open”.
NO.1 valve remains open;
when Pp-Ps= △ P3 , command NO.3 top gas bleeder valve “open”.
NO.1 and NO.2 valve remain open;
when Pp-Ps= △ P4 , command NO.4 top gas bleeder valve “open”.
NO.1 , NO.2 and NO.3 valve remain open;
when Pp<Ps , command all top gas bleeder valves “close”. All valves
are closed.
17. Please indicate about the heat insulation of feeder spout
rotating chute.
Answer: chute length ~4.5m, base material: stainless steel
liner material: carbon steel with deposit welding of hard alloy (high Cr
alloy, code: FA45-0B, HRC55~58. expected life: over 1-year)
V. BF PROPER
502084648.doc
13 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
14 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
16. Indicate the total length and inclination of the main trough.
502084648.doc
15 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
- Rotation speed
- Maximum torque
- Hammering force – forward direction and reverse direction
- Taphole length measurement system
20. Ensure that cast house columns are protected by bricks upto a
suitable level.
VII. SGP
2. Slag production per day indicated as 1460 tpd not matching with
slag rate considered - to be rechecked.
4. Please also note that two (2) nos. slag granulation plants to be
offered for each cast house.
6. Please indicate the granulation slag quality – grain size and glass
content.
502084648.doc
16 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
10. Please clarify the water supply system during emergency like
power failure. Please also explain what is mill water system.
VIII. STOVE
502084648.doc
17 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
15. Refer equipment list No. 03-PRI-001-7.0 (hot blast stove) – List
is not indicating the following items:
502084648.doc
18 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
17. Indicate the heat input (in G cal) per ton of hot metal.
IX. PCI
502084648.doc
19 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
20 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
1. Hearth
502084648.doc
21 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
Answer: 6 layers (400mm thick per layer), bed joint: 2mm thick; 1 layer
of graphite; 2 layers of semi-graphite; 3 layers of micro-porous carbon
blocks.
iii) Please indicate lining thickness at elephant foot area and
hearth wall where carbon refractories have been offered.
Please indicate the fixed carbon (%) and average pore dia
(m) of NMA & NMD carbon blocks.
Answer: In elephant foot area, wall thickness is approx. 1700mm. UCAR
does not provide data of fixed carbon (%) and average pore dia (m)
NMA & NMD.
iv) In the first stanza of clause no.2.5.4.1 you have mentioned
use of hot pressed carbon blocks (NMA, NMD) for hearth only
whereas in the sixth stanza you have mentioned the use of
the same for both under hearth and hearth. Filled in
questionnaire indicated Graphitic Carbon bricks and semi
Graphitic Carbon bricks for the under hearth. Please
clarify.
Answer: Hearth: hot pressed carbon blocks (NMA, NMD); bottom: hot
pressed carbon blocks on external ring of graphite, semi-graphite and
micro-porous carbon blocks
v) Please indicate the quality specification and thickness of
hearth wall protection material (clay brick).The same
mentioned as Alumina bricks in the drawing no.
KT2006.035LT-16.
Answer: The alumina brick in such drawing shall be clay brick
(Al2O3≥42%). thickness of hearth wall protection: 230mm (upper) and
340mm (lower).
2. Tuyere
3. Bosh Area
502084648.doc
22 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
2.7.2.3.3 Downcomer
Manufacturer
Code YPZ-1
Al2O3 ≥50
Chemical composition (%) Fe2O3 ≤1.0
CaO ≤5.0
110C×24h ≥8.5
600C×3h ≥6.5
Rupture Strength (MPa)
1000C×3h ≥6.0
1300C×3h ≥8.0
Compressive Strength 110C×24h ≥35.0
502084648.doc
23 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
600C×3h ≥30.0
(MPa) 1000C×3h ≥25.0
1300C×3h ≥31.0
600C×3h ±0.1
Linear Variation (%) 1000C×3h ±0.3
1300C×3h ±0.6
Bulk Density (110C×24h) (g/m3) ≥2.1
max. Grain Size (mm) ≤3
Rebounding Rate (%) ≤25
Ability to Withstand CO abrasion CO=4 l/h
No breaking-up
(500C×48h)
7. Stove
8. Cast House
Source-
Material Indigenous
Area Lining specification Thickness MT / Foreign
Trough Working
Safety
Back-up
Iron
Runner Working
Safety
Back-up
Slag
Runner Working
502084648.doc
24 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
Safety
Back-up
Tilting
Runner Working
Safety
Back-up
9. General
502084648.doc
25 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
1. Besides the scope of work mentioned in the point no. 7.2 of section 7
in your technical offer, the tenderer to confirm all clauses and sub-
clauses under clause no. 6.0 of section I in technical specification no.
VSP 6.3-03-PRI-001.
Answer: This question will be replied in the meeting at VSP.
2. Division of scope of work amongst MCC/CISDI/Danieli Corus/Mecon
to be indicated clearly in the offer.
Answer: This question will be replied in the meeting at VSP.
XIII. LAYOUT
502084648.doc
26 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
4. Refer point no. 2 of your offer - System will run under the
supervision and guidance of the tenderer and hence control of
parameters is the responsibility of bidder.
XV. EXCLUSION/DEVIATIONS
502084648.doc
27 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
XVI. ELECTRICAL
502084648.doc
28 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
29 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
-
At least two(2) nos. spare feeders for the highest motor rating fed
from that MCC
- 2 X 250A SFU & 1-100A feeders for flare stack from the nearest
PCC/DB
- 2 x 400A SFU for Nitrogen control station.
Answer: Confirmed.
502084648.doc
30 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
18. To note that for 3.7KW and below capacity motors, motor protection
circuit breakers(MPCB) can be used in place of MCCB.
Answer: Noted.
19.As per clause no. 3.1.3 of section 2 of offer (page 138 of 250) Power
factor compensation parallel capacitor bank will be used, but in
equipment list for BF-3 the item is not appearing.
Answer: Confirmed provision of 11 kV compensation equipment.
20 To confirm that there will be separate double ended load centres of
11/0.433KV, 3 phase, 4 Wire, 630 KVA rated transformer feeding
Main Lighting Distribution Boards for lighting. Also, separate
415/240V (1 phase), 415/24V transformers shall be provided for
feeding small power sockets wherever applicable. These transformers
will be fed from the power distribution boards.
Answer: Confirmed with price implications.
1.2 Two (2) Nos. HMI units and one (1) No. Engineering station should be
provided in Stock house & RMHS control room. Screens for RMHS
and Stock house should be available in both the HMI units.
Answer: agree.
1.3 All the screens of Bell less top equipment, BF proper, stoves and GCP
should be available in all the four HMI units located in central control
room. Further, the screens of water systems, GCP water treatment,
cast house and slag treatment should also be available in the HMI
units of central control room.
Answer: Confirmed.
1.4 One (1) No. Engineering station should be provided in PCI control
room. Screens for PCI pulverizing equipment and PCI injection
equipment should be available in both the HMI units.
Answer: agree.
1.5 Distributed server architecture is to be considered with separate
Redundant HMI servers in Stock house control room, central control
room and PCI control room.
Answer: agree.
1.6 Please include OPC server for compatibility with 3rd party system.
Answer: Confirmed.
1.7 As per page 154 of the write-up, 3 Nos. colour laser jet printers are
envisaged while configuration diagram indicates 4 Nos. colour inkjet
printers. Please check.
502084648.doc
31 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
3.1 CPU model shall be selected based on processor speed, RAM capacity,
I/O handling capacity and I/O scan rate requirement of plant units to
be covered by respective PLCs. The I/O handling capacity of selected
CPU shall be at least 50% more than the required I/Os. Also, the CPU
data memory and programme memory utilization shall not exceed
50% of its full rated capacity. CPU model for each PLC will be finalized
during engineering, meeting these requirements.
Answer: Confirmed.
3.2 Network switches shall have required Nos. of fiber optic ports, media
converters shall not be used.
Answer: Confirmed.
3.3 I/O modules are to be selected adhering to the features specified in
General Specification VSP-6.3/GS-I-02.
Answer: Confirmed.
3.4 PLC software will also include PID control functions and other
complex control loops as per requirement of Blast furnace process.
Answer: Confirmed.
4.0 Refer Section 4.1.3.2 and 4.1.3.3 :
502084648.doc
32 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
i)
Peripheral gas temperature measurement at eight points for
assessing indirect flow profile.
Answer: Confirmed.
ii) AMANOSCOPE for monitoring charge and gas distribution to
be mounted on furnace dome.
Answer: Confirmed.
iii) RADAR type level measurement in BLT hopper
Answer: Confirmed.
iv) Digital encoders for the rotation and tilting mechanisms of
BLT to provide two independent inputs separately for the
interface cards (similar to ISN02) and separately received in
DCS / PLC system to fully support parallel processing of the
inputs.
Answer: Confirmed.
11.0 Please include Emergency panel in main control room with the
following functions:
502084648.doc
33 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
34 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
Answer: Confirmed.
17.3 Magnetic flow meters shall be separate electronics type.
Answer: agree.
18.0 Complete automation system for the Turbo blower shall be supplied
by the blower supplier. However one (1) no. remote I/O cabinet
alongwith 1.8 KM of fibre-optic cable shall be included for locating in
Turbo blower house. Supply and installation of remote I/O cabinet
and interconnecting cable as well as necessary co-ordination with
blower supplier for signal exchange shall be included in the scope of
the tenderer. One dedicated remote I/O cabinet shall be provided at
RMHS control room for interlocking with other systems (Sinter plant
and O&FS/CHP). No. of inputs/outputs to be considered is
approximately 300 for DI/DO and 50 for AI/AO. Space shall also be
kept in RMHS control room to install two (2 ) nos. remote I /O
cabinets (supplied by others) for sinter discharge conveyors and
O&FS/CHP conveyors
Answer: agree.
19.0 Please include Conventional control desk/panel with indicators
lamps push-buttons and switches etc as required for operating the
process during emergency. Semi-graphic mimics in all pump houses
having digital indicators and lamps are also to be included.
Answer: It will be discussed during the tender meeting.
20.0 The following items shall be included in tenderer’s scope of supply.
Please confirm :
502084648.doc
35 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
Answer: agree.
20.6 Ergonomically designed console for operator stations and
Engineering station.
Answer: agree.
20.7 Commissioning spares & consumables.
Answer: agree.
20.8 Special tools and tackles as required for testing and
commissioning .
Answer: agree.
20.9 List of spares for two (2) years normal operation.
Answer: Refer to annex sparepart.
21.0 Necessary instruments for measurement of pressure, flow,
temperature and analysis etc of all utility parameters at TOP shall be
included in Tenderer’s scope.
Answer: agree.
26.0 Training requirement and List of spares shall be discussed during the
Tender meeting.
Answer: agree.
27.0 Please submit list of drawings to be submitted by the Tenderer during
Engineering.
Answer: Confirmed.
502084648.doc
36 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
A. Scope of work
Hardware and
2 MCC MCC MCC MCC MCC MCC MCC
networking
Process models
3 MCC MCC MCC MCC MCC MCC MCC
software program
Application and
4 communication MCC MCC MCC MCC MCC MCC MCC
software program
Establishing
communication
links with
Laboratory
automation
5 MCC MCC MCC MCC MCC MCC MCC
system, Planning
computer system,
Plant SCADA
system and VSP
intranet
2. Section 7, item 7.2: The scope of work shall also cover co-ordination
with other system suppliers/concerned agencies for establishment of
links with external computers/systems.
Answer: OK
502084648.doc
37 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
B. Technical aspects
1. Section 2, Item 4.1.2.2: Confirm that the HMIs indicated under item
4.1.2.2 are common for both level 1 and level 2 systems.
Answer: CISDI will actualize HMI’s Common using for both level 1 and
level 2 systems, Rsview SE software will used to edit L1 and L2 HMI .
2. Section 2, Item 4.1.2.3:
i) Provide hot stand-by facilities (instead of warm back up) for the
servers as asked in tender specification.
Answer: agree
ii) VSP Intranet should also be connected through Web server (upto
the nearest node within battery limit).
Answer: agree
iii) Supply and laying of communication cables for connecting
laboratory system and the above VSP Intranet are to be
considered.
Answer: agree
3. Section 2, Item – 4.1.4:
502084648.doc
38 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
39 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
40 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
Topics to be covered
a. Programming tool software;b. Database;c. Application Software.
Number of people to be trained
a. Programming tool software training 5 person ; b. Database
training 5 person;c. Application Software training 5 person。
Place of training
Chongqing,China
Basic needed qualification of the persons to be trained
Know some knowledge of Windows System and network , know
some technical knowledge of blast furnace , have some experience of
program.
2. Section 10, Spare Part: Furnish list of spares for 2 years operation.
Also spares for HMI and printer not considered. Please check and
confirm.
Answer : OK
502084648.doc
41 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
XIX. TELECOMMUNICATION
502084648.doc
42 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
43 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
PCI
1 PCI control room desk top set 1 3W~5W
wall mount
2 Coal pulverizer operation layer explosion- set 1 15W
proof type
wall mount
3 Coal feeder operation layer explosion- set 1 15W
proof type
wall mount
4 Raw coal bunker layer explosion- set 1 15W
proof type
wall mount
5 Dry gas generator operation layer explosion- set 1 15W
proof type
wall mount
Coal Powder Ventilator operation
6 explosion- set 1 15W
layer
proof type
wall mount
High Concentration Bag Filter
7 explosion- set 1 15W
operation layer
proof type
502084648.doc
44 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
Raw system
1 Ore vibrating screen platform wall mount set 1 15W
2 fines bin wall mount set 1 15W
3 Coke vibrating screen platform wall mount set 1 15W
4 Intermediate stand wall mount set 1 15W
5 Coke room wall mount set 1 3W~5W
6 Ore room wall mount set 1 3W~5W
7 PCI room wall mount set 1 3W~5W
8 Return fines room wall mount set 1 3W~5W
9 Slag granulation room wall mount set 1 3W~5W
502084648.doc
45 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
operation room of
2 1
south casthouse
operation room of
3 1
north casthouse
502084648.doc
46 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
total 6 44
502084648.doc
47 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
9 Plant EPABX, 2
operation room of south Shop EPABX
casthouse
10 Plant EPABX, 2
operation room of north Shop EPABX
casthouse
11 Plant EPABX, 20
office Shop EPABX
12 Plant EPABX, 7
spare Shop EPABX
合计 48
502084648.doc
48 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
6. Crane and trolley rails shall be selected from the Indian Crane rail
sections generally available in India.
7. Maintenance provision for all other cranes & hoists shall be kept
with suitable ladder/stair and platforms.
9. Please indicate the duty and standards followed for these cranes &
hoists. The cranes & hoists shall conform to relevant Indian
standards mentioned in GS.
11. The cast house cranes in Blast Furnace, are required in production
activities regularly as well as in maintenance. Therefore, these
cranes should be of heavy duty type as per IS:4137 and shall be
provided with air-conditioned cabin alongwith radio remote control.
Please confirm.
12. All cranes shall have VVVF drives with provision for micro speed.
1.0 Please confirm your acceptance to clause No. 4.0 (Plant &
Equipment) of Section-IX of technical specification and
include the same suitably in your offer.
Answer: There are some deviation listed in the deviation table.(equipment
supplied by MECON, MECON will confirm if the material of all the
equipment can be provided according to technical specification.)
502084648.doc
49 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
502084648.doc
50 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
13.0 Section-2, Clause No. 6.5 – Water Based Fire Hydrant System
a)
Outlet water pressure from consumers in Soft Water
System-I.
Answer: Outlet water pressure from consumers is about 0.27MPa
b) Outlet pressure of water from consumers in Soft Cooling Water
System-II.
Answer: Outlet pressure of water from consumers is about 0.44 MPa
16.0 Section-2, Clause No. 9.2.2.1 – Process Flow Diagram
16.1 Please explain the function of degassing tank in Soft Water Circuit I
& II.
Answer: It’s for degassing
502084648.doc
51 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
18.1 Please indicate the outlet water temperature from high and medium
pressure water systems.
Answer: Water temperature from high pressure water system is39 dec;
Water temperature from medium pressure water system is39
dec
19.0 Section-2, Clause No. 9.2.3.1 – Process Flow
502084648.doc
52 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
19.2 Return water scheme for the consumers (spray water for hearth,
water spraying in the late stage of campaign life, tuyere nose, level
detector, temperature probe, gas sampler, top spraying, TRT etc),
differs from the system envisaged in the specification. You are
requested to indicate reason for the same and also furnish the
reference list where similar system is in operation satisfactorily.
Answer: The return water scheme for the consumers are designed
according to the specification, return water flow to the hot well
first ,and then pumped to the cooling tower.
19.3 For the probe cooling, it is noted that ICW is considered in place of
soft water. Please indicate reason for the same and furnish
reference list where similar system is in operation.
Answer: We use the clean water as the icw in China.
20.0 Section-2, Clause No. 9.2.3.3 – Safety Water Supply
a)
Please confirm inclusion of bowl rake classifier/spiral
classifier in the inlet water to waste water treatment plant
as per Technical Specification clause No. 4.5.1.8, 4.5.1.9,
4.5.1.10 & 4.5.1.11.
Answer: MECON will answer it
b) Please indicate the following:
502084648.doc
53 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
a)
You are requested to furnish the reason for adopting clear
water as cooling media for gearbox cooling against soft
water. Also furnish the reference list where similar system
is in operation satisfactorily.
Answer: There is not necessary.
23.2 Deviation against Clause No. 3.9.2 of Section-IX
a)
The fast fill pump is required to take care of emergency
situation such as hose bursting etc. Please indicate how
such situation can be handled in absence of such pump.
Please review and include suitable pump in your scope.
Answer: There are three make-up pumps, one work and the other two
standby, in such situation mentioned above, all of the fast pumps
can be put into use. If emergency situation such as hose bursting
happen, maybe there is no enough soft water in soft make-up water
pipe, so even there is fast fill pump in the system, it is no use. In
China, in this situation, we use clear water or industry water
instead of soft water for this system.
23.3 Deviation against Clause Nos. 4.1.1 & 4.1.8 of Section-IX
502084648.doc
54 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
a)
Please indicate pump group where this will be applicable
indicating its tentative duty parameters. In case during
detail engineering it is observed that the type/speed of
pump as specified in the Technical Specification is not
available from any of the approve vendor, the matter will be
discussed and suitable alternative will be accepted.
Answer: It’s already indicated in the flow sheet and equipment list about the
each pump group andtentative duty parameters , we will provide
more detailed order list in detail design.
23.4 Deviation against Clause No. 4.2.1 of Section-IX
a)
Regarding cooling tower, the deviation is not accepted.
Please confirm that the cooling tower shall be cross-flow
type.
Answer: MECON will answer it
23.5 Deviation against Clause No. 4.5.1.8 of Section-IX
a)
Regarding bowl rake classifier, the deviation is not accepted.
This is a specific requirement for this project. Please revise
your offer accordingly.
Answer: MECON will answer it
23.6 Deviation against Clause No. 4.5.1.36 of Section-IX
a)
Regarding moisture in cake, the deviation is not accepted.
However, this point will be discussed during tender
discussion considering use of this cake in sinter plant.
Answer: MECON will answer it
24.0 Comments on Drawing
24.1 Please confirm that the flow diagram/P&I diagrams submitted are
preliminary in nature and will be finalised during detail
engineering.
Answer: confirmed.
24.2 Flow Chart of Soft Water Circuit System (drawing No.
KT2006.035SD-02)
a)
It is noted that you have considered soft water for hot blast
valve cooling in place of clear water. Please indicate the
reason for the same and furnish reference list of similar
installation.
Answer: Clear water tend to be scale.
b) Please indicate the staging height of expansion tank for
both soft water circuits.
Answer: Expansion tank of System Ⅰ lies in 27.2 meter level。
502084648.doc
55 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B
b)
Please include air compressor for backwashing the side
stream filter in clear water flow circuit.
Answer: Air compressor will be added to the flowsheet
c) Please confirm that the emergency overhead tank for CW
and SW shall have N2 blanketing and trickle fill
recirculation arrangement.
Answer: confirmed
24.4 Flow Chart for Gas Cleaning Water System (Drawing No.
MEC/11/40/VIZAG/02)
a)
Please confirm inclusion of bowl rake classifier in waste
water treatment plant.
Answer: MECON will answer it
b) You have considered two (2) sludge storage tanks and
distribution well in waste water treatment plant instead of
one (1) sludge storage tank having 8 hours retention time.
Please review.
Answer: MECON will answer it
24.5 Please submit flow diagram/P&I diagram for GCP (proper) water
system.
Answer: The diagram will be submitted by MECON.
24.6 Please submit flow diagram/P&I diagram for SGP water system.
Answer: The flow diagram will be submitted by DENIELI
25.0 Regarding pipework, please confirm your acceptance to General
Specification for Pipework (VSP-6.3/GS-M-01) and clause No. 4.7 of
Section-IX of Technical Specification.
Answer: Concerning abour the material request,MECON will confirm If all
the pipework can follow the custermer’s request。
We can’t understand some requestment in No. 4.7 of Section-IX of
Technical Specification ,please explain it.( The technical
Specification will be discussed in the clarification.)