M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

ENCLOSURE - 1

LIST OF CLARIFICATION/CONFIRMATIONS REQUIRED ON THE


TECHNICAL OFFER OF MCC/CISDI/DANIELI CORUS/MECON FOR
BLAST FURNACE-3
(VSP TENDER SPECIFICATION NO. VSP-6.3-03-PRI-001)

I. GENERAL

1. Refer point 3.1 of page 4 of 9 - Please confirm:

i) Average hot metal production 7150 tpd


Answer: Yes.
ii) Peak hot metal production 7865 tpd
Answer: Yes.
2. To indicate the list of mobile equipment (with parameters)
required for blast furnace operation.
Answer: refer to mobile equipment list.
3. Life of all critical equipment like top equipment including stove,
ceramic burner, mud gun, drill machine, bleeder valve etc to be
indicated in million ton HMt production.
Answer:
(1) BF top: PW BLT, expected life: one BF campaign (except wears and
tears such as seal, bearing, cylinder, wearable liner).
transmission gearbox one BF campaign
planetary gearbox one BF campaign
tilt gearbox one BF campaign
seal valve drives one BF campaign
material gate drives one BF campaign
seal valve’s soft seal 6~ 12 month
distribution chute: 1-year.
Chinese gearbox: already in service for 4~5-year.
(2) clay gun and drill: overall machinery life: one BF campaign, of which
clay gun cylinder needs grinding once every 3-year and allow 3 times of
grindings. That is to say, clay cylinder life is 9~10-year. ; dirll impact
hammer life: 1~2-year, other wears and tears include seals etc.
(3) top bleeder valve: body life: one BF campaign; upper wears and
tears seal, spring and bearing need replacement.
4. To confirm that all stacks have monitoring system & aviation
lamps.
Answer: whether refer to BF framework?.
5. To confirm that provisions have been made for isolating major
process equipment.
Answer: ok
6. The tenderer to confirm acceptance of the following clauses of
Section-I of the technical specification no. VSP 6.3-03-PRI-001:

502084648.doc
2 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

-Clause No. 2.0 for Standards and General Specification.


-Clause No. 3.0 for design, standardisation, name plate,
equipment numbering system, safety.
- All clauses and sub-clauses of clause 6.0 for scope of work.
- Stability certificate as per clause No. 19.0
- Drawings for fast wearing parts/items as per clause 11.0.
- Drawings and documents as per clause No. 12.0 and General
Conditions of Contract.
- Spare parts as per clause No. 10.0 and clause no. 7.7 & 7.8
of General Conditions of Contract.
- Special tools and tackles as per clause no. 13.0
- Consumables as per clause no. 15.0.
Answer: acceptance.
9. Furnish make of all imported equipment and confirm preferred
makes list of VSP for indigenous equipment.
Answer: to furnish imported and local equipment list.
10. To furnish a detailed schedule of submission of drawings and
documents as per clause No. 6.1, Section-I of technical
specification.
Answer: Detailed schedule of submission of drawings and documents
will be furnished in the meeting at VSP.
11. Tenderer has to fill the following data indicated in the table.

Item Unit Tenderer to fill


Hot metal 2.5
production mtpa

Material consumption

Iron ore kg/thm Lump ore 1635


Sinter kg/thm 1308
Limestone kg/thm 2
Dolomite kg/thm 2
Quartzite kg/thm 6
Coke kg/thm 369
Nut coke kg/thm 16
Coal kg/thm 150
Other materials
Utility Consumption

Power kWh/thm
Blower wind M 3 /thm 1098
Water M 3 /thm
Chilled water M 3 /thm
Comp. Air Nm 3 /thm 5
Oxygen Nm 3 /thm 41.7
Nitrogen Nm 3 /thm 16.5
BF gas Nm 3 /thm 613

502084648.doc
3 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

CO gas Nm 3 /thm 26
Steam kg/thm 15
Refractories kg/thm gun clay 0.5, runner clay 1, sand
0.6. coke fine 1, rice shell 0.3
Others overhead

Main power
Integrated repair No. for design blow-down ratio: 4.11%
duration the plant
Intermediate repair Hrs
duration
Interval of repairs

Notes:
(a) All the items are dry & net.
(b) THM – ton of hot metal

12. Any deviation, whatsoever, from the VSP specifications, shall be


specifically indicated in the deviation list for cranes. If any point is not
mentioned, but arising afterwards will not be entertained.
Answer: ok
13. The cranes shall conform to the General Specifications (GS) for VSP as
follows:

- VSP-6.3/GS-CR-01 for Double Girder EOT Cranes.


- VSP-6.3/GS-CR-02 for Single Girder EOT Cranes, Jib Cranes,
HOT Cranes and Electric Hoists.
Answer: ok
14. The makes of the equipment and components shall conform to the
preferred make list approved by VSP.
Answer: ok
15. Design Basis. Cl. 11.2.1.1. of offer. English Translations of relevant
Chinese Standards for design of Technological Structures like shells
of Blast Furnace, Stove, Dust Catcher etc. are to be furnished along
with drawings submitted for Client’s approval.
Answer: ok
16. Structural steel plates and sections used from foreign source shall
conform to renowned International standards eg. BS, AISC, DIN, JIS
etc.
Answer: ok
17. The climate of Visakhapatnam indicated in para 4.2 of Section-1 of
the Technical Specification to be considered as follows:

Barometric pressure 760 mm


Altitude above mean sea level 10.5M
Ambient temperature :
Absolute maximum 45.3 0
C
Absolute minimum 10.5 0
C
Highest mean monthly (maximum) 37.8 0
C
Lowest mean monthly (minimum) 14.3 0
C

502084648.doc
4 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

Relative humidity :
Absolute maximum 100%
Absolute minimum 4%
Highest monthly mean 88%
Lowest monthly mean 51%
Rainfall :
Highest annual 1314 mm
Highest monthly mean 606 mm
Highest daily 293.3 mm
Max hourly intensity 63 mm
Max. intensity for 15 minutes 32.3 mm
Max intensity for 5 minutes 13.5 mm
Wind velocity :
Max. mean monthly wind velocity for 21.4 km / hr.
24 Hrs.
Extreme wind velocity 131.0 km/ hr.
Earthquake factor Zone II as per
IS:1893

18. Tenderer shall indicate the operational and maintenance


manpower required for blast furnace as mentioned in clause No.
6.5 of Section-I of technical specification VSP-6.3-03-PRI-001.
Answer: Ansteel 2 BFs: 880 persons
19. The tenderer to furnish complete filled in questionnaire as in
Section-XV of technical specification VSP-6.3-03-PRI-001.
Answer: ok
20. Battery Limit for BF-3 Water Facilities

An area bounded by coordinates A+6878.00/B+1507.00 and


A+7039.00/B+1664.00 has been indicated in the tender for locating
the various facilities for the blast furnace water system. The tenderer
may note the following regarding the above area:

a) Change in the alignment of the railway track shown in the north-


east corner of the area. This track will be used for transfer of hot
metal from BF-3 to SMS-2.

b) In future, VSP may construct a fly-over on the road along


A+6865.00, west of the area proposed for the BF-3 water system.
In such a case, a new 7 m wide road along A+6898.00 will be
constructed by VSP. The existing road along B+1675.00 will be
connected to this road instead of the existing connection to road
along A+6865.00. To keep provision for the future fly-over and
road, Tenderer shall locate all facilities and services east of the
future road along A+6898.00. In view of the restriction in space
due to the provision for future road, the battery limit on the
southern side has been shifted to B+1475.00

The above changes are shown in the enclosed Sketch No. SK-1.

502084648.doc
5 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

II. DESIGN BASIS

1. Refer page 2 of 250, Cl. No. 2.1.2.1 - Top gas generation =


3840 Mm 3 /y - Unit to be corrected.
Answer: should be MNm 3 /Y
2. Refer page 4 of 250 - Please include furnace working day =
350 day/yr.
Answer: ok
3. The blast furnace flow indicated in Table 2.1-1 is 5450 Nm 3 /min
& 1098 per ton of hot metal. Please indicate whether this flow is
composite (i.e. includes oxygen & steam). If so then please
indicate blast volume without enrichment.
Answer: blast flow: 5450 Nm3/min, including oxygen enrichment and
steam. blast flow excluding oxygen enrichment: 5229Nm3/min.
4. Refer point no. 21 of Table 2.1-1 of page 4 of 250 - The unit for
annual gas production should be Nm 3 in place of m 3 .
Answer: ok
5. Refer Table 2.1-3 of page 5 of 250 - Please consider lump ore
grain size = 10-40 mm.
Answer: normally 8-25mm.
6. Refer Table 2.1-4 of page 6 of 250:

i) Please consider the coke grain size as 25 mm – 70 mm.


Answer: normally 25-75mm.
ii) To mention the coke consumption as per technical
specification.
Answer: coke lump: 269kg/t, nut coke: 16kg/t.
7. To confirm inclusion of all equipment for initial heating of stove.
Answer: TO BE ANSWERED BY DC.
8. Confirm 30% force feeling factor over average hot metal
production as per 3(v) of Section-2 of technical specification.

9. Indicate the blast volume for stove filling


Answer: HBS blast makeup: 600Nm3/min.
10. From the operation point of view, the raw limestone, dolomite
addition should be avoided in blast furnace when 80% sinter is
in burden. Please review the burden.
Answer: limestone and dolomite for adjustment only.
11. Alkali content will be discussed during technical discussion.
Answer: can be discussed.

12. Refer Drg. No. KT2006.035LT-01:

-Maximum blast flow to be indicated


Answer: 5952Nm3/min in case of all coke
-Amount of BF gas requirement for stove to be corrected
Answer: in Nm3/h.
13. Refer Drg. No. KT2006.035LT-16:

-Levels & dimensions to be indicated

502084648.doc
6 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

Answer: already shown in drawing


-Actual hearth volume considering the brick lining to be
indicated
Answer: actual hearth diameter excl. clay bricks inside hearth.
Furnace parameters for all the operating conditions to be indicated,
such as:

-Average production with average PCI


-Average production with peak PCI
-Peak production with average PCI
-Peak production with peak PCI
-Average production with all coke
Answer: to furnish.

III. STOCK HOUSE

1. The bulk density of sinter to be considered as 1.60 t/m 3 in place


of 1.8 t/m 3 .
Answer: 1.8t/m3 is popular index in China. CSIDI may use 1.6t/m3,
which makes sinter bin capacity change necessary.
2. a) The storage times indicated for sinter, ore are to be
rechecked.
Answer: already rechecked. In case of 1.6t/m3, sinter bin storage time
is 10.72H. Therefore, each sinter bin must be 1.0m higher for 70m3
capacity increase in order to provide 12H storage time (calculated on
basis of 7150t daily output).
b) Basis of storage hour determination for coke is to be clearly
indicated.
Answer: uniform stockhouse level results in coke bin storage time >8H.
The current coke bin (+60mm) storage time is 20.4H, coke bin
(+25~60mm) storage time is 9H, daily output as 7150t.
Because stockhouse discharge conveyors will have uniform level
(28.000m), it results in coke bin (+25~60mm) storage time>8H.
There are 3 coke bins (+60mm) and one bin can be cancelled. The bin
capacity can be changed from 3×450m3 to 2×450m3, while storage
time from 20.4H to 13.55H accordingly.
c) Indicate the storage time for nut coke and additives.
Answer: nut coke bin storage time is 21H.
Additives are for adjustment and have long storage time.
Additives bin (2kg/t.Fe, 1.6t/m3) storage time is 939.9H.
Additives bin (6kg/t.Fe, 1.6t/m3) storage time is 313.29H.
Additives bin (6kg/t.Fe, 2.2t/m3) storage time is 430.77H.
3. Please indicate the procedure regarding separation of +60 mm
coke & -60 +25 mm coke.
Answer: designed for separation before.
4. Nut coke is not contributing in coke layer thickness , so
calculation to be revised accordingly.
Answer: since nut coke sometimes is not recovered in actual
production, we normally do not deduct nut coke weight for coke batch
calculation.

502084648.doc
7 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

In case nut coke weight deducted, the following change is necessary:

Table 2.2-3 Size of BF batch and burden thickness


Coke Ore
batch size layer thickness batch size layer thickness
(t/ch) (mm) (t/ch) (mm)
max. batch
27.09 868 120 920
size
normal batch 759 805
23.69 105
size
min. batch 650 690
20.3 90
size

Refer drawing no. KT2006.035LT-08:

a) Cycle time is not considering the coke of +60 mm size and


the sequence should consider the centre coke charging
also.
Answer: sequencing diagram with center coke charge can be found in
KT2006.035LT-08-1 (to be furnished later).
Also, for sequencing diagram deducting nut coke, see KT2006.035LT-
08(V.1, to be furnished later).
b) Cycle time for three screen operation to be rechecked
Answer: 3 screens can satisfy requirements at max. coke batch.
5. Refer Cl. No. 2.29.1 of page 17 of 250:

a) Please submit one drawing showing conveyor (K101, K201


& J101) & (K102, K202 & J102) feeding material to stock
house.
Answer: ok
b) All the conveyors (K101, K201 &J101) feeding the material
to ore bin - Please correct.

6. Revise the cyclogram considering 30% force filling capacity.


Answer: sequencing diagram is based on stockhouse and charging
system capacity.
In practice, when stockhouse & charging system are interlocked to BF
top system, their capacity is 30% spare. The stockhouse capacity shall
be more than top charging capacity
7. Refer drawing no. KT2006.035LT-04 Rev. 0:

a) In the drawing & write up 6 nos. auxiliary ore bins have


been indicated, whereas in the questionnaire 4 nos.
additive bins are shown. Please clarify about the additional
two nos. auxiliary bins.
Answer: As required in Bidding Document (4 additives bins, 1 spare
bin). In current design, a total of 6 bins on additives bin side. The one
additional bin can store nut coke or lump ore from yards.

502084648.doc
8 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

This bin above may cancelled if you think unnecessary.


b) Consider independent weigh hopper for each additive bins.
Answer: from our experience, additives can be weigher in the same
weigher hopper together with sinter or lump ore (A+B weighting)
In case you need independent weigh hopper for additive, our design
can be modified accordingly.
8. To indicate the sampling system of input materials as indicated
in 3.1 (x) of Section-II of technical specification.
Answer: Already considered. To be arranged later.
9. To include one elevator in stock house. (Refer 3.2 (xi) of Section-
2 of technical specification.
Answer: ok (H=28m,Q=1t)
10. Will there be any change in the cycle time with centre coke (+60
mm) charging separately if parallel hoppers are put instead of
serial hoppers? If so indicate the same with all reasons and
calculations.
Answer: in case of mixed charge of cut coke and ore, BF top charging
availability is changed, see kt2006.035LT-11-1-top sequencing diagram
1 (to be furnished later) .
In case of separate charge of l arge coke and small coke, coke batch is
changed is changed, and BF top charging availability is changed , see
kt2006.035LT-11-2-top sequencing diagram 2 (to be furnished later) .

IV. TOP EQUIPMENT

1. Refer clause no. 2.4.2 of page 22 of 250 - The location of top


hydraulic station is shown on 33.8 m top platform, but in the
drawing no. KT2006.035LT-09, the top hydraulic station
location level is indicated as 44.00 mm. Please check.
Answer: at 44.000 m platform.
2. Please furnish basis for selection of hopper volume of 80 m 3 .
Profile for filling of material is also to be indicated.
Answer: As per max. 120t/ch and mix charged cut coke
V=120/1.72+(120/1.635)x16kg/1000/0.45=72.38m 3 (sinter=1.6m 3 /t) and
certain spare capacity (margin factor= 1.1), the hopper volume is
72.38x1.1=79.6 m 3 . With reference Chinese and international 4000 m 3
BF hoppers, this hopper is designed for effective capacity of 80 m 3 .
3. Furnish information required on PW – BLT indicating battery
limit for Purchaser’s supply.
Answer: Mainly including water-cooled gearbox, lower valve casing
(incl. case, lower gate valve and lower seal valve) , BF top hydraulic
station valve stand and top lubrication station, and key electrical &
instrument dedicated for BLT, 2 level meters of fixed hopper, lower
hopper weighing system and 1 level meter of lower hopper, etc . Detail
batter limit will be specified after technical negotiation with PW.
4. Please indicate following details of distribution chute:

- Parking angle

502084648.doc
9 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

- Operating range angle


- Dismantle angle
Answer: There are 11 chute stop positions and the angles can be
preset and modified via CRT.
Inclination positions are defined as follows (subject to change at detail
design):
Inclination Inclination Duty
position ID angle
L-2 0° equipment maintenance
position
L-1 2.6° equipment maintenance
position
11 14° distribution position
10 23.3° distribution position
9 27.8° distribution position
8 31.4° distribution position
7 34.5° distribution position
6 37.3° distribution position
5 39.8° distribution position
4 42.3° distribution position
3 44.7° distribution position
2 47.2° distribution position
1 50.2° distribution position
U-1 55° chute change position lower
end
U-2 65° chute change position
upper end
U-3 75° chute change position limit
upper end

5. Please furnish approximate distribution mode for the envisaged


raw materials. Also the uses of other distribution mode for
various furnace operating condition may be indicated.
Answer: 4 distribution patterns can be selected:
Multi-ring distribution (auto control);
Single-ring distribution (auto control);
Segment distribution (manual control only);
Point 点 distribution (manual control only);
Multi-ring distribution (auto control) acts as primary distribution
pattern.
6. Please indicate the spare equipment for each series like coke,
ore & sinter etc.

502084648.doc
10 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

Answer: For stockhouse and charging system, one-year spare parts


are detailed in stockhouse and charging system spare parts list.
7. In case of power failure, please indicate the provision envisaged
for operation of all critical equipment for safe shut down of the
furnace.
Answer: BF top hydraulic station consists of pump station,
accumulator and valve station, This hydraulic station supplies to top
hydraulic equipment actuators the power oil. The accumulator inside
station can assure one time of action of all hydraulic equipment in
case of power failure of BF top system. The hydraulic equipment
include: BLT equipment , equalization and relief valves, BF top
bleeder valve.
8. Please elaborate the methodology for replacing stock rod without
off blast the furnace.
Answer: Below stock rod is shutoff ball vale to shut off BF gas at
maintenance. When stock rod needs maintenance, manual lift stock
rod to maintenance position, and the shut off ball valve. Open steam
purging valve connected to stock rod box to d clean the residual gas
out of box. Finally disassemble flange bolts between stock rod and
shutoff ball valve. With maintenance beam over stock rod, the stock
rod can be changed for maintenance. The total process can be done
during BF production.
9. Please indicate the alternative cooling arrangement for gear box
in case of failure of cooling system.
Answer: a. Inside gearbox water cooling station, the cycling pumps are
one working and one standby for safe water supply of gearbox;
  b. Total BF systems are powered by 2 feeders or more for
system safety;
  c . In case all pumps damage or power failure, the cooling
nitrogen flow can be increases for gearbox and lower valve casing
sealing & cooling. The gearbox can stand high temperature for short
time (approx. 30 分钟 as informed from PW) .
10. Please indicate the speed of gas (max.) in throat, offtakes,
uptakes & downcomers.
Answer: Throat: 1.0m/s (free flow)
offtakes & uptakes: 5.11m/s
downcomers: 7.8m/s
11. Confirm the furnace profile is suitable for 50% pellet charging
also.
Answer: The pellet is likely to come to BF center during distribution
and thus resulting in buildup at hearth center. A s per actual data from

502084648.doc
11 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

European BF, for 15~20% pellet, BF edge temperature fluctuation is


greatly increased; for 50% pellet, the fluctuation rate is over 150℃/min
while for 100% sinter 77℃/min. Therefore, the effect on BF profile
from increase of pellet percentage is to reduce bosh angle. For less
thermal impact and to make bosh linings and staves far from high
temperature zone, it is normally to reduce bosh angle. In north
America and UK, BF bosh angle is usually 74°~79° with pellet charge.
Hoogovens No.7 BF (Vu=4540m3) bosh angle is 78.45° with increase
of D/d value. Kobe BF profile is not changed much and they take
center coke charge to make BF center loose.
For this BF, bosh angle is 77°19’11” and center coke charge is
allowed for loose BF center and satisfaction of 50% pellet.
12. Please indicate the movement time of burden at throat region so
that the furnace can sustain the interrupted charging during
full blast of the furnace.
Answer: In normal ore batch and normal productivity, each charge of
ore + coke is ~1.555m thick and one day needs 111.3 charges. Then,
burden theoretically passes the throat at speed of
=(111.3x1.555)/24/60=0.12m/min.
13. Please indicate whether the replacement of distribution chute is
possible with the help of outrigger crane.
Answer: With 16t distribution chute change crane, chute dismount are
and 1 pneumatic hoist, the chute can be replaced through chute
change hole.
14. Material of construction of shell plate of off-take, up-take and
down comer to be indicated.
Answer: Normal carbon steel (Q235-B) .
15. Please indicate the internal shell diameter of off-take and up-
take and diameter inside refractory of off-take, up-take, down
comer and connecting ball.
Answer: Off-take and down comer: 2300mm (internal shell diameter);
connecting ball: 6000mm (ID); down comer: 3600mm (ID) and lining’s
gunning material: 100mm thick.
16. Please indicate the following details about bleeder valves:

- Quantity and size 4, DN650mm


- Design pressure  0.28MPa
- Type        hydraulic
- Operating pressure (emergency) 1.2 times of working pressure ,
i.e. 1.2x0.25=0.3MPa
- Drive arrangement hydraulic; hydraulic system is integrated into
top hydraulic station
- Manual over ride facility no manual device?

502084648.doc
12 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

- Expected life The wears and tears, seal, spring and bearing and
bearing need replacement, Other parts can stand for one BF campaign
- Maintenance hoist Rotary crane is located on top for
maintenance and replacement.
- Sequence of operation
When difference between top gas actual pressure (Pp) and setup
pressure (Ps) is at certain value, bleeder valve must be opened.
Differentia pressure settings for bleeder valve opening are given from
CRT:
△P 1=0.01 MPa ( can be corrected)
△P 2=0.015 MPa ( can be corrected)
△P 3=0.02 MPa ( can be corrected)
△P 4=0.025 MPa ( can be corrected)
when Pp-Ps= △ P1 , command NO.1 top gas bleeder valve “open”.
NO.1 valve is opened;
when Pp-Ps= △ P2 , command NO.2 top gas bleeder valve “open”.
NO.1 valve remains open;
when Pp-Ps= △ P3 , command NO.3 top gas bleeder valve “open”.
NO.1 and NO.2 valve remain open;
when Pp-Ps= △ P4 , command NO.4 top gas bleeder valve “open”.
NO.1 , NO.2 and NO.3 valve remain open;
when Pp<Ps , command all top gas bleeder valves “close”. All valves
are closed.
17. Please indicate about the heat insulation of feeder spout
rotating chute.
Answer: chute length ~4.5m, base material: stainless steel
liner material: carbon steel with deposit welding of hard alloy (high Cr
alloy, code: FA45-0B, HRC55~58. expected life: over 1-year)

V. BF PROPER

1. Indicate the advantage of providing cooling plate at lower bosh


region over Cu stave. Base offer shall be submitted as per
tender requirement. However, tenderer may offer cooling plate
as an alternative cooling system.
Answer: Both copper cooling plate and copper staves can satisfy
cooling strength of that area. But copper cooling plates can also
support the bosh bricks at that area and provide good protection of
tuyere cooler.
Concept of copper staves to be furnished latter.
2. Please indicate whether the tuyere is single or double chambered
type. Also confirm the quality of copper of tuyere and tuyere

502084648.doc
13 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

cooler as mentioned in the point No. 6 of clause No. 3.2 of


Section-II in technical specification No. VSP-6.3-03-PRI-001.
Answer: The tuyere is double chambered. Your required copper
performance can be satisfied.
3. Please elaborate the method for leak detection of tuyere nose,
probes, staves etc.
Answer: 1) The tuyere and detectors use high pressure industrial wter
(open circuit), and at outlet human hands can touch water temperature
and water flow change so as to judge equipment operation status.
Magnetic flow meter can be added to tuyere if required.
2) The damage of staves can be judged through water makeup, flow
meter on main, small ball valve ignition on branch or U-shaped pipe
(see whether bobble is contained in water) and portable flow meter.
4. Please elaborate the method for heat flux measuring system
Answer: In water system are provided temperature meter and flow
meter.
5. Please indicate the type, location and insertion of thermocouple in
relevant drawing.
Answer: To be furnished later (about thermocouple type, mount and
insertion position) .
6. Bustle main diameter inside refractory appears to be very low.
Please review.
Answer: TO BE ANSWERED BY DC (it is problem that bustle main’s
refractory pipe ID is too small).
7. Please indicate tuyere stock handling arrangement for replacement.
Answer: It is possible to replace blow pipe and down leg together and
move them with fork lift.
8. Indicate the material of construction of shell plate and bustle
main.
Answer: BF shell material: BB503 ? ( 由 土 建 回 答 ); bustle material TO
BE ANSWERED BY DC.
9. Indicate the design pressure and temperature of bustle main.
Answer: TO BE ANSWERED BY DC (design temperature: 1250℃,
design pressure: 450kPa) .
10. Indicate the skin temperature of bustle main and tuyere stock.
Answer: 1).bustle temperature TO BE ANSWERED BY DC.
2).tuyere stock temperature TO BE ANSWERED BY DC ( design
skin temperature: around 200 o C) .
11. In page 9/74 table 2.5.2 – indicated middle stack cooling by CI
stave, but in questionnaire it is Cu-stave (Page 9/74) – Recheck.
Answer: middle stack: cast iron staves.
12. Indicate the height of stack covered by Cu-stave.
Answer: copper staves: approx. 11450mm high.
13. Individual circuit-wise diagram for BF cooling to be provided,
showing the cascading arrangement with relevant drawing.
Answer: To be furnished later (systematic diagram of BF cooling) .
VI. CAST HOUSE

1. Refer Drg. No. KT2006.035LT-18:

502084648.doc
14 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

- Crane hook approaches are to be indicated

- Pull runner configuration is to be submitted alongwith cooling


details of the runner.

2. Height of fall of metal from cast house to tilting runner and


tilting runner to torpedo ladle level to be indicated.

3. Indicate the depth of end portion of slag runner and


maintenance procedure of this runner.

4. Please indicate the head-room clearance between cast house


and bottom of the tuyere platform.

5. Cast house floor shall have brick lining.

6. Two separate SGP and blow box is to be considered for each


cast house.

7. Tapping management to be explained indicating tapping speed,


schedule, over-lapping of casts, if any, cast weight etc.

8. Slope of iron and slag runner is to be indicated.

9. Indicate about the provision envisaged for slag diversion from


one runner to other.

10. Indicate in a drawing various levels considered at different


zones of cast house with all equipment disposition including
runners.

11. Following parameters for mud gun to be indicated:

- Effective barrel volume


- Cooling of clay barrel
- Clay volume

12. Indicate the hydraulic equipment (power pack etc) details.


Also indicate the operation of critical equipment in the cast
house during power failure through hydraulic system.

13. Handling arrangement of runner cover to be indicated

14. Ensure the smooth movement of mobile equipment in the cast


house and confirm flat configuration of the cast house offer.

15. Tentative dimensions of typical iron trough cross section to be


indicated.

16. Indicate the total length and inclination of the main trough.

502084648.doc
15 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

17. Please clarify the basis of providing two different capacity


cranes in two cast house.

18. Indicate the following of taphole drill machine –

- Rotation speed
- Maximum torque
- Hammering force – forward direction and reverse direction
- Taphole length measurement system

19. Indicate the tuyere ramp from cast house.

20. Ensure that cast house columns are protected by bricks upto a
suitable level.

21. Indicate dry slag pit capacity in terms of no. of days.

22. Indicate about spare tilting runner.

23. Ensure that hoods for tilting runner is provided.

VII. SGP

1. Please indicate the design capacity of the granulation system in


terms of tons/day. Slag granulation system should be designed
for peak slag flow rate for each cast house.

2. Slag production per day indicated as 1460 tpd not matching with
slag rate considered - to be rechecked.

3. Provide cold water granulation system as per the specification


requirement.

4. Please also note that two (2) nos. slag granulation plants to be
offered for each cast house.

5. Moisture content in the granulation slag have been indicated as


<15% after dewatering drum and 12% after storing. Indicate the
period of storing to achieve 12% moisture. Please also note that
in the write-up (page 105 of 250) moisture content have been
indicated as 10%. Please check and make necessary correction.

6. Please indicate the granulation slag quality – grain size and glass
content.

502084648.doc
16 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

7. Please indicate the inlet temperature and pressure of granulating


water at spray box.

8. Please indicate the arrangement for removal of jamming at the


chute at the dewatering wheel.

9. The diverter gate arrangement for the slag runner to be included


in the scope of tenderer.

10. Please clarify the water supply system during emergency like
power failure. Please also explain what is mill water system.

11. What is the life of the spray box?

12. Please indicate the type of liners in the chimney.

13. Spray cooling arrangement at slag pits will be provided by


tenderer. Please confirm.

14. Please note that as per technical specification, tenderer’s scope


for granulated slag conveyors is upto JH-C and JH-D. Indicate
conveyor inclination considered to clear the hot metal tracks
running between the above junction house.

VIII. STOVE

1. Indicate capacity of combustion air fan.

2. In page 87 of 250 in Section 2, it is stated that “for the line


sizes of all mains, reference is made to the process flow diagram
document J100C001” – No such document has been submitted.

3. Confirm provision of silencer for snort valve.

4. Submit the following technical data about waste heat recovery


system:

- Waste gas flow rate


- Waste gas temperature
- Inlet
- Outlet

- BF gas flow rate, max


- BF gas temperature
- Inlet
- Outlet

502084648.doc
17 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

- Combustion air flow rate


- Combustion air temperature
- Inlet
- Outlet

5. Indicate the number of heat exchanger provided.

6. Blast volume to be considered according to the worst condition


of the various separate alternatives (Refer B-19 of design basis).
Also furnish the operating data considering heat recovery unit.

7. Refer page 81 of 250 –

- % of 0 2 enrichment to be indicated in the table – Please


consider the difference of flame & dome temperature to be
50 0 C.

- It is observed that the difference of dome temp. and hot


blast temp vary in different cases. It requires clarification.

- The activities during changeover of stove operation are to


be indicated with timing.

8. Heating surface area seems to be on lower side – Please check.

9. The burner capacity to be considered with respect to the worst


operating condition parameters for blast and gas.

10. Provide a flow diagram indicating valves, expansion bellows and


major equipment used in stove.

11. Indicate the efficiency of stove.

12. Heat recovery system can be elaborated with drawing and


performances of similar type of blast furnaces are to be
furnished.

13. Elaborate why isolation valve is required.

14. Handling of all valves are to be indicated.

15. Refer equipment list No. 03-PRI-001-7.0 (hot blast stove) – List
is not indicating the following items:

- Furnace isolation valve


- Purge, bleeder valve
- Silencer for depressurisation
- BF & CO gas mixing station
- Combustion air fan etc

502084648.doc
18 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

16. The various main shall be adequately designed to cater to the


future installation of 4 th Stove.

17. Indicate the heat input (in G cal) per ton of hot metal.

18. Indicate the efficiency of stove.

IX. PCI

1. Heat generator to be designed for 100% requirement .


Answer: The design is in line with the requirement . that is, one (1) dry
gas generator satisfying 100% gas demand of one (1) coal pulverizer.
2. Pulverised coal storage capacity shall be 750 ton.
DANIELI Answer
3. Magnetic separator and metal detection to be provided in the
raw coal conveyors.
Answer: Magnetic separator and metal detection should be set on the
first belt conveyer in a conveyer system, the conveyer in MCC ’s scope
is the last one, so, it isn’t necessary to set it.
4. However, CO monitoring also to be considered in addition to
oxygen analyser.
Answer:It’s unnecessary to add CO monitoring to oxygen analyser.
1. For the baker, it needs to have a strict control of volume ratio of gas
to air to ensure complete combustion of gas. In so doing, there is
almost no CO contained in the generated dried gas and no impact on
safety operation of the system.
2. Since the entire coal pulverization system is an induced system, the
residual CO in fume will be diluted and vented into the atmosphere by
equipment’s air leakage. So, it’s no impact on safety operation of
system.
3. Since the coal powder bin is enclosed, the coal may carry small CO
into the bin. Under such a circumstance, CO content is higher. So, at
coal powder bin is installed CO detection and alarm device. Still, CO in
this case can be discharged into atmosphere by bin top deduster.
However, if the Client insist on adding such CO detection and alarm
device to oxygen analyzer, it can be done this way.
5. Indicate whether individual lance control have been provided in
the pulverised coal distributor.
DANIELI Answer
6. Confirm that turndown ratio of 20% of maximum injection rate
have been considered.
DANIELI Answer

502084648.doc
19 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

7. Confirm that accuracy injection shall be + 3% over average


injection rate.
DANIELI Answer
8. Explain the arrangement for injection lance withdrawal when
required, without shutdown of the blast furnace.
DANIELI Answer
9. Furnish references of Indian plants where you have supplied
PCI system using air for transportation. However, as per
specification, nirogen shall be the injection media.
DANIELI Answer

X. GAS CLEANING PLANT

1. Refer clause No. 2.7.1 of page 54 of 250 – Elaborate the fast


water seal and electrical metal sealing system.
1. To cut off the external gas, first should turn off the motorized
butterfly valve at the outlet side, and then fill water into the water seal
till it full of water, the height of seal water is 3000mmH2O.
2. The water supply and drainage of the water seal
The elevated tank should store 100m3 industry water at
peacetime, and set a water level measurement, while the water level is
very low in the tank, it need to fill water in the tank to ensure the high
level of water.
To cut off the gas, first it need to turn off the motorized butterfly
valve, and then turn on the DN350 motorized valve to push the water
in the elevated tank into the water seal, the filling time is about 5mins.
Turn off the DN350 motorized valve while the water seal is full of
water, and then supply water of small flow by means of turn on the
DN50 motorized valve, meanwhile open the DN50 motorized valve on
the drainpipe to make sure that the small flow drainage equals to
supply, this is convenient for workers to make sure that there is water
in the water seal, (to avoid the water vaporize during long time of shut
off, and ensure the water sealing height is 3000mm), the water will be
drained to the plash.
When the water level in the elevated tank is too lowly, to recharge
water by means of turn on the circulate pump in the plash.
Discharge the water in the water seal to plash while the water seal is
stopped, and then turn on the motorized butterfly valve at the outlet to
overpass the gas.
Under normal produce process, the lowest hydrocele of the water
seal is discharged to plash.
When the hydrocele in the plash exceed a certain point, the pump will
discharge water.
2. Maximum top gas temperature and duration to be indicated.
Answer: Top gas temperature: Avg. 150-250ºC
Max. 600 (20 times each year & ~0.5 h for each time)
3. Refer page 58 of 250 – The automatic dust dumping from the
dust catcher on a batch basis to be clarified.
Answer: TO BE ANSWERED BY DC (not clear to your question)

502084648.doc
20 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

4. Indicate the facility envisaged for avoiding dust pollution during


dust unloading.
Answer: There are two high pressure dust removal devices working at
the same time and one emergency dust removal pipe. The gas dust
from high pressure devices above will come to mixed and then
transported by truck. The mixer has water spray to avoid dust fly
during dust unloading.
5. Purging points are to be indicated.
Answer: TO BE ANSWERED BY DC
6. Refer Drg. No. KT 2006-035-RQ-01 Isolation valve to be
provided for ‘BYPASS VALVES BLOCK NOISE ISOLATED
HOOD”.
Whether request to add a shutoff valve in front of the by-pass valve?
RE: It’s not necessary to add a shutoff valve in front of the by-pass
valve. We has no such experience in China.
7. Goggle valve to be provided at the delivery side of GET.
RE: It’s not necessary to add a google valve at the delivery side of
GET. The fast water seal and motorized butterfly valve at the delivery
side of GET are reliable to cut off the gas.
8. Indicate the sludge load of recirculation water coming out from
scrubber and entering to clarifier.
DC and Water supply & drainage department will reply it. It seems that
the Water supply & drainage department has meet the similar
question.
9. For design purpose of GCP, the worst operating condition to be
followed:
DC will reply it.
10. Refer page 61 of 250 – Top gas – From furnace top to dust
catcher outlet to be corrected as inlet.
Answer: Not clear to your question..
11. The tentative water requirement for cleaning the gas of volume
503,500 N cu m/hr is 400 cu m/hr. But recirculation water for
clarified water is considered 900 cu m/hr in this offer. Please
clarify.
DC will reply it.
13. Indicate the isolation valve to isolate furnace from GCP.
It will be replied in the meeting at VSP.
14. Indicate the shell size of scrubber.
DC will reply it.
XI. REFRACTORY

1. Hearth

i) Please indicate the type of unshaped refractory WNJ-2 i.e.


castable or ramming mass. Indicate the PLC temperature.
Answer: In addition to refractory data in Technical Specification, the
unshaped castables and ramming material data will be furnished later.
ii) It is noted that the total thickness of carbon and graphite
block in the hearth pad area indicated as 2412 mm. Please
indicate the thicknesses of individual layers.

502084648.doc
21 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

Answer: 6 layers (400mm thick per layer), bed joint: 2mm thick; 1 layer
of graphite; 2 layers of semi-graphite; 3 layers of micro-porous carbon
blocks.
iii) Please indicate lining thickness at elephant foot area and
hearth wall where carbon refractories have been offered.
Please indicate the fixed carbon (%) and average pore dia
(m) of NMA & NMD carbon blocks.
Answer: In elephant foot area, wall thickness is approx. 1700mm. UCAR
does not provide data of fixed carbon (%) and average pore dia (m)
NMA & NMD.
iv) In the first stanza of clause no.2.5.4.1 you have mentioned
use of hot pressed carbon blocks (NMA, NMD) for hearth only
whereas in the sixth stanza you have mentioned the use of
the same for both under hearth and hearth. Filled in
questionnaire indicated Graphitic Carbon bricks and semi
Graphitic Carbon bricks for the under hearth. Please
clarify.
Answer: Hearth: hot pressed carbon blocks (NMA, NMD); bottom: hot
pressed carbon blocks on external ring of graphite, semi-graphite and
micro-porous carbon blocks
v) Please indicate the quality specification and thickness of
hearth wall protection material (clay brick).The same
mentioned as Alumina bricks in the drawing no.
KT2006.035LT-16.
Answer: The alumina brick in such drawing shall be clay brick
(Al2O3≥42%). thickness of hearth wall protection: 230mm (upper) and
340mm (lower).

2. Tuyere

i) Please indicate the quality of self flow castable with raw


material base used in the tuyere stock area.

ii) Please indicate the quality of grey corundum assembly brick.


Is it RL89MNC? Please elaborate the assembly.

iii) Please indicate the lining thicknesses of this brick (grey


corundum) recommended for use at layer below tuyere and
tuyere belt.

3. Bosh Area

Please indicate lining thickness of nitride bonded SiC brick


proposed at bosh area. Please also note, in clause no.2.5.4.1 you
have stated Si 3 N 4 -SiC brick for bosh area whereas in
questionnaire (P-8 of 74) Gunning BFS is indicated. Please
clarify specification of Gunning BFS.

4. Belly and Stack

502084648.doc
22 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

i) Please furnish the specification of Gunning BFS


recommended as gunning material for belly and lower stack.

ii) Please confirm whether the specification of Si 3 N 4 -SiC for mid


to upper stack is same as that of bosh bricks.

iii) Please confirm that the material proposed for throat is


CO-resistant.

5. Uptake and Off-take

In clause 2.7.2.3 you have mentioned uptake and downcomer


refractory as 45% alumina gunning castable with also
specification (clause 2.7.2.4.1). But in questionnaire (P-8 of 74)
for tope cone, offtake, uptake and downcomer you mentioned a
different quality material - YPZ-1. Please clarify.
Answer: (mistake of translation) Such paragraph shall be changed as
follows :
2.7.2.3.1 Uptakes

The refractory lining of Uptakes shall generally be 100mm thick ≥50%


Alumina Gunning Castable. SS anchors shall be provided for holding
the Castable in position.

2.7.2.3.2 Connection Ball

The refractory lining of Uptakes shall generally be 100mm thick ≥50%


Alumina Gunning Castable. SS anchors shall be provided for holding
the Castable in position.

2.7.2.3.3 Downcomer

The refractory lining of Downcomer shall generally be 100mm thick


≥50% Alumina Gunning Castable. SS anchors shall be provided for
holding the Castable in position.

2.7.2.4 Specification of Refractories

2.7.2.4.1 ≥50% Alumina Gunning Castable

Manufacturer
Code YPZ-1
Al2O3 ≥50
Chemical composition (%) Fe2O3 ≤1.0
CaO ≤5.0
110C×24h ≥8.5
600C×3h ≥6.5
Rupture Strength (MPa)
1000C×3h ≥6.0
1300C×3h ≥8.0
Compressive Strength 110C×24h ≥35.0

502084648.doc
23 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

600C×3h ≥30.0
(MPa) 1000C×3h ≥25.0
1300C×3h ≥31.0
600C×3h ±0.1
Linear Variation (%) 1000C×3h ±0.3
1300C×3h ±0.6
Bulk Density (110C×24h) (g/m3) ≥2.1
max. Grain Size (mm) ≤3
Rebounding Rate (%) ≤25
Ability to Withstand CO abrasion CO=4 l/h
No breaking-up
(500C×48h)

6. Hot Blast Main

Please mention the specifications of Andalusite based hot face


brick, insulation brick and chammote castable with individual
lining thickness proposed for hot blast main.

7. Stove

i) Please furnish a drawing showing refractory lining


configuration and checker arrangement. Please give Quality
specification, lining thickness of refractory materials for
stove, bustle main and mixing chamber, ceramic burner of
stoves. Please also furnish detail of checker brick work along
with specification. These are serious omissions.

ii) Quality specification, lining thickness for back draft chimney


has not furnished. Please furnish the same.

8. Cast House

Detail of cast house trough and runner refractory lining, please


furnish in the following format:

Source-
Material Indigenous
Area Lining specification Thickness MT / Foreign
Trough Working
Safety
Back-up

Iron
Runner Working
Safety
Back-up

Slag
Runner Working

502084648.doc
24 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

Safety
Back-up

Tilting
Runner Working
Safety
Back-up

9. General

i) Please specify Fe 2 O 3 % of SC-8YK and SC-T2 required


between stave and shell.

ii) Please specify quality of ramming mass for use between


staves and carbon blocks; between mullite pad and
supermicro pore carbon block at hearth.

iii) Please furnish Specification of material for vertical and


horizontal joints between staves.

iv) Kindly furnish drawings to show the lining thicknesses


according to quality for different areas for the furnace and
stove with tonnages of refractories for different areas.

v) Kindly indicate the sources of refractory materials - Indian or


imported.

10. It is noted that there are some deviations from specified


requirements in your offer. Kindly clarify the same.

Area Specified Offered by MCC


Requirements

Hearth Intermediate Micropore carbon Semi graphite Carbon


layer
Hearth Layer below Super micropore carbon Micropore Carbon
ceramic pad
Elephant foot area Super micropore carbon Micropore Carbon
Hearth Ceramic pad Mullite High alumina
Hearth wall and Tap Super micropore carbon Micropore Carbon
hole area

Tuyere belt Monocoral/Carbon -SiC Grey Corundum


assembly brick

Belly SiC brick Gunning BFS


Middle and upper 62% alumina Si 3 N 4 -SiC brick

502084648.doc
25 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

stack-CI staves inserts

Hot Blast Main 62% Andalusite at hot 57% Andalusite at hot


face face
Stove chimney Acid proof brick and Fire clay brick
high alumina brick

XII. SCOPE OF WORK

1. Besides the scope of work mentioned in the point no. 7.2 of section 7
in your technical offer, the tenderer to confirm all clauses and sub-
clauses under clause no. 6.0 of section I in technical specification no.
VSP 6.3-03-PRI-001.
Answer: This question will be replied in the meeting at VSP.
2. Division of scope of work amongst MCC/CISDI/Danieli Corus/Mecon
to be indicated clearly in the offer.
Answer: This question will be replied in the meeting at VSP.
XIII. LAYOUT

1. Tenderer is to furnish hard copy of the layout drawing in size


‘A1’. Also provide soft copy of the same.
Answer: Yes
2. Please ensure and confirm that all the building/units covered in
the tender drawing no. 24340-03-00-PRI-0002 inside the battery
limit has been included in the offer.

3. Please ensure and confirm that adequacy of all the


buildings/units/systems envisaged by tenderer are as per the
project requirement.
Answer: Yes
4. Confirm that all interface take over points as indicated in the
specification have been considered.
Answer: Yes
5. Slag granulation plant are to be provided two nos. for each cast
house
Answer: Only one for each cast house
6. Incoming conveyor to stock house to be incorporated and shall
be as per specification drawing.
Answer: Yes
7. Ore/sinter fines bunker location shall be as per the
specification drawing.
Answer: Yes
8. Location of elevator preferably is out side cast house.
Answer: Location of elevator preferably is inside cast house.
9. Please confirm that, cast house ramp slope shall be minimum
10%
Answer: See the answer to VI. CAST HOUSE No.10.

502084648.doc
26 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

10. Motorable approach road to be provided to all units/buildings.


Answer: Yes
11. Adequate toilets for gents and ladies are to be included at a
suitable location.
Answer: Yes
12. Buildings/units/facilities envisaged for BF shall be located as
per layout shown in tender drawing. Specific reasons are to be
indicated for any change.
Answer: No change
13. Railway track connection is to be provided below dust catcher.
Answer: Yes
14. Maintenance facilities/access for all the equipment are to be
ensured for all individual buildings/units/systems.
Answer: Yes
15. Adequate space is to be provided in and around BF proper and
stove for its relining activities in future.
Answer: Yes
16. Proper approach to be provided at ground for lifting and
lowering of top equipment by outrigger crane.
Answer: Yes

XIV. PERFORMANCE GUARANTEE

1. Refer 2.4 of Section 8 of your offer – Work zone dust content


should be 5 mg/N cu m as per clause 2.3 of Section XIV of
technical specification.

2. Confirm the period of test for 3 days for pollution norms.

3. Confirm the clause No. 2.0, 3.0 of technical specification and


clause no. 2.0 of General Conditions of Contract (VSP-TTK/DTK-
01).

4. Refer point no. 2 of your offer - System will run under the
supervision and guidance of the tenderer and hence control of
parameters is the responsibility of bidder.

XV. EXCLUSION/DEVIATIONS

1. Indicate the commissioning spares as mentioned in the


specification No. VSP-6.3-03-PRI-001 Part-C, Volume-II and
clause No. 7.7 of General Conditions of Contract (VSP-
TTK/DTK-01).

2. Indicate the spare parts for two years normal working in


accordance with the relevant clauses of the Invitation to Tender
and General Conditions of Contract (Clause No. 7.8).

3. Imported items also should cover –

502084648.doc
27 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

- Uptake expansion joint


- Bell less top
- Tuyere changing device

4. Refer clause No. 14 – Please revise the offer considering the


following:

i. Point 2,3 & 4 – To be as per scope of work and GCC.


ii. Point No. 05 – to be as per Cl. 3.3.3 of Section-XI of
technical specification.
iii. Point No. 07 – to be offered as per technical specification
3.1(vi) of Section-II.
iv. Pont No. 08 – To indicate the sampling system of input materials
as indicated in 3.1 (x) of Section-II of technical specification.
v. Point No. 09 – Bustle main diameter inside refractory appears to
be very low. Please review.
vi. Pont No. 10 – Refer Clause No. 3.3 of Section-II of
Specification VSP-6.3-03-PRI-001
vii. Point No. 11 – Refer point No. (xii), Section-II of 3.4 of
specification No. VSP-6.3-03-PRI-001
viii. Point No. 12 – Refer Point No. (v), Section-II of 3.5 of
Specification No. VSP-6.3-03-PRI-001
ix. Point No. 13 – Refer Point No. (vii), Section-II of 3.5 of
Specification No. VSP-6.3-03-PRI-001
x. Point No. 14 – Please clarify/provide details.
xi. Point No. 15 – Please refer electrical comments.
xii. Point No. 16 - Please refer electrical comments.
xiii. Point No. 17 – Please refer point No. 4.13.1.2 of Section XI
as per Specification No. VSP-6.3-03-PRI-001
xiv. Point No. 21 – Please clarify.

XVI. ELECTRICAL

1. HT Distribution voltage shall be 6.6KV and not 6.9KV as mentioned in


various places.
Answer: Confirmed
2. Tenderer to furnish type of indoor & outdoor distribution
transformers considered in various places. The selection of
transformers in various areas shall be as per clause no.4.3 of VSP-
6.3/GS-E-04.
Answer: The transformers shall be located in transformer pens
adjacent to the switchgear room.
3. Tenderer to furnish rating of all transformers considered in various
places. All 11/0.433KV Transformers shall be selected from
1000/1600/2000KVA ratings and all 11/6.6KV Transformers shall be
selected from 5/6.3/10MVA ratings.
Answer: Confirmed, however actual ratings shall be furnished during
detail engg.

502084648.doc
28 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

4. Refer to serial no. 3.1.2 of section-2 of your technical specification.


Please Recheck Pmax figure ( 20,218KW ) which has been considered
as half hour maximum demand. This does not match with the annual
energy consumption figure (1.09 x 108 Kwh).
Answer: To be handed over in India.
5. Refer to clause no.3.6 of section-2 wherein it is mentioned that DC
Power pack has been envisaged for the control voltages of standalone
11KV and 6.6KV switch cubicles. Please clarify the “Stand-alone”
cubicles. However, there shall be separate battery and battery charger
as per GS VSP- 6.3/GS-E-01 instead of power pack for all 11KV and
6.6KV circuit-breaker/Vacuum contactor panels. DC supply shall be
distributed from the DC distribution board receiving power from the
battery/battery charger output.
Answer: As per DCO’s TS, 11kV VCB panels shall be provided (in
place of isolator) before all the 11/6.6kV and 11/0.433kV
transformers. It is these VCB panels which have been referred
to as ‘ stand alone panels’.
6. Refer to your clause no.3.7 of section-2. Please note that tenderer’s
scope is to provide numerical relays and communicable type circuit
breakers in all HT incoming and outgoing feeders as well as in 415V
PCC feeders for selected LT MCCs feeding important loads, lighting
DBs etc. for the purpose of energy monitoring and status indication.
These relays/circuit breakers will communicate to the plant
automation system (provided by tenderer). The plant automation
system shall communicate with sending end substation automation
system(by others). Also, plant automation system will communicate
with a SCADA system(by others) through a OPC gateway to be
provided by tenderer. Tenderer’s scope is to supply and lay all
communication/control cables, as required, for interconnection
between individual switchboard and the plant automation system, as
well as interconnection between plant automation system and the
substation automation system. However, supply and laying of the
communication/control cables for interconnection between plant
automation system and the SCADA will be done by the SCADA
vendor.
Answer: Please clarify what is meant by ‘ selected LT MCCs feeding
important loads’. The list of such LT MCCs may please be
identified.
7. Refer to clause no. 3.9.1 of section-2. Tenderer to check whether
Direct-ON-Line (DOL) method can be adapted for Stock House ID fan
motor instead of using reactors.
Answer: Confirmed to provide DOL starting for stockhouse ID fan.
8. In the clause no.8.1.2 of section-2 of the offer indicates that Stock
house ID fan rating is 1500KW, whereas in the motor list same is
indicated as 2000KW. Similarly, the clause no.8.3.2 of section-2 of the
offer indicates that Cast house ID fan rating is 1400KW, whereas in
the motor list same is indicated as 2000KW. Tenderer to confirm the
correct ratings.
Answer: The correct rating is 2000kW

502084648.doc
29 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

9. Refer to point no.23 of clause 7.2 of section-7. Tenderer’s scope shall


also include earthing & Lightning Protection.
Answer: Confirmed.
10. Refer to deviation list point no.16. To include emergency lighting in
pump house and stock house areas also.
Answer: Confirmed with cost implication.
11. Refer to point no.23 of the deviation list. Transformers located in
closed rooms shall be of cast resin type and the rooms shall have
appropriate ventilation system.
Answer: All transformers will be outdoor type with ONAN cooling. The
transformers shall be located in transformer pens adjacent to
the switchgear room. However, for transformers located in the
electrical room or on the shop floor, dry type shall be provided.
12. Each 11KV & 6.6kv Bus section shall have two (2) bus-couplers in
series as shown in the drawing no. 24340-03-00-ELE-178, rev A as
attached with the corrigendum dated 19.06.06. This is a safety
requirement of VSP and need to be fulfilled.
Answer: Noted and confirmed with price implications.
13. Refer your SLD no.KT2006.035DL-01,Rev 0. Feeders for Stock House
dedusting fans are not shown in the 6.6KV HMCC for stock House.
Answer: Power supply for the stock house dedusting fan is from the
SH ER itself. Further drawings which can show you the feeders
will be furnished in BD.
14. Tenderer have confirmed in section 13(page 29 of 74), that all 415V
LCSS will be, has been shown in the SLD no. SLD-KT2006.035 DL-01
(In the board no.5LBDS-10). To check and review.
Answer: To be discussed during tender discussions at Vizag.
15. Refer to page 24 of 74 of section-13 (Questionnaires duly filled)
wherein, TRT generation is indicated as 18,000KW wherein in clause
2.8.2 of section -2 (Technical specification), rated power of the
Generator is indicated as 15,000KW. Please clarify.
Answer: Rated power of the Generator is 15,000kW.
16. To confirm that they have considered Three (3) nos.1000A ACBs in
the 415V Switchboard of stock house LCSS for others as per clause
no.5.10 of the technical specification. Transformer capacity of Stock
House shall be suitably designed for this extra load. Also, space shall
be kept for accommodating 3 nos. MCCs in the Stock House LCSS
building. Estimated dimension of the MCCs will be around 15m
length x 1m depth.
Answer: Confirmed with price implications. However, please confirm
whether 15m is the length of one MCC or 3 MCCs together.
17. To confirm that they have considered following spare feeders:

-
At least two(2) nos. spare feeders for the highest motor rating fed
from that MCC
- 2 X 250A SFU & 1-100A feeders for flare stack from the nearest
PCC/DB
- 2 x 400A SFU for Nitrogen control station.
Answer: Confirmed.

502084648.doc
30 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

18. To note that for 3.7KW and below capacity motors, motor protection
circuit breakers(MPCB) can be used in place of MCCB.
Answer: Noted.
19.As per clause no. 3.1.3 of section 2 of offer (page 138 of 250) Power
factor compensation parallel capacitor bank will be used, but in
equipment list for BF-3 the item is not appearing.
Answer: Confirmed provision of 11 kV compensation equipment.
20 To confirm that there will be separate double ended load centres of
11/0.433KV, 3 phase, 4 Wire, 630 KVA rated transformer feeding
Main Lighting Distribution Boards for lighting. Also, separate
415/240V (1 phase), 415/24V transformers shall be provided for
feeding small power sockets wherever applicable. These transformers
will be fed from the power distribution boards.
Answer: Confirmed with price implications.

XVII. INSTRUMENTATION & LEVEL-1 AUTOMATION

1.0 Please refer Automation System Configuration DRWG No.


KT2006.035XT-01, Rev.0, furnished in the offer :
Answer: Please refer to Automation System Configuration DRWG No.
KT2006.035XT-01,Rev.1
1.1 It is noted that no separate RMHS control room is considered by
tenderer. Please review and confirm that there will not be any
operational problem due to this.
Answer: Confirmed with price implications.

1.2 Two (2) Nos. HMI units and one (1) No. Engineering station should be
provided in Stock house & RMHS control room. Screens for RMHS
and Stock house should be available in both the HMI units.
Answer: agree.

1.3 All the screens of Bell less top equipment, BF proper, stoves and GCP
should be available in all the four HMI units located in central control
room. Further, the screens of water systems, GCP water treatment,
cast house and slag treatment should also be available in the HMI
units of central control room.
Answer: Confirmed.
1.4 One (1) No. Engineering station should be provided in PCI control
room. Screens for PCI pulverizing equipment and PCI injection
equipment should be available in both the HMI units.
Answer: agree.
1.5 Distributed server architecture is to be considered with separate
Redundant HMI servers in Stock house control room, central control
room and PCI control room.
Answer: agree.
1.6 Please include OPC server for compatibility with 3rd party system.
Answer: Confirmed.
1.7 As per page 154 of the write-up, 3 Nos. colour laser jet printers are
envisaged while configuration diagram indicates 4 Nos. colour inkjet
printers. Please check.

502084648.doc
31 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

Answer: 4 Nos. colour inkjet printers is correct.


1.8 Please submit Automation configuration diagram for TRT and
Dedusting system. Also please indicate interfacing details of these
systems with Blast Furnace Automation system.
Answer: TRT and Dedusting system are independent packages
supplied by manufacturer,we prefer to connect it to Blast
Furnace Automation system by cable.
2.0 Refer Section 4.1.2.2 of the write-up :

2.1 Please incorporate changes based on point No.1.0 above.

2.2 B/W laser printer shall be suitable for print up to A3 size.


Answer: Confirmed.
2.3 4 Nos. colour printers and 2 Nos. Large screen displays are to be
indicated, in line with configuration diagram.
Answer: Corrected the documents.
2.4 PLC1 shall include RMHS control function as well.
Answer: agree.
2.5 Operating hours for all drives shall be displayed in HMI. I/O scheme
for drives shall be as described in Electrics Section.
Answer: agree.
2.6 Level-1 Automation system shall conform to General Specification No.
VSP-6.3/GS-I-02.
Answer: Confirmed.

3.0 Refer Section 4.1.3.1 :

3.1 CPU model shall be selected based on processor speed, RAM capacity,
I/O handling capacity and I/O scan rate requirement of plant units to
be covered by respective PLCs. The I/O handling capacity of selected
CPU shall be at least 50% more than the required I/Os. Also, the CPU
data memory and programme memory utilization shall not exceed
50% of its full rated capacity. CPU model for each PLC will be finalized
during engineering, meeting these requirements.
Answer: Confirmed.
3.2 Network switches shall have required Nos. of fiber optic ports, media
converters shall not be used.
Answer: Confirmed.
3.3 I/O modules are to be selected adhering to the features specified in
General Specification VSP-6.3/GS-I-02.
Answer: Confirmed.
3.4 PLC software will also include PID control functions and other
complex control loops as per requirement of Blast furnace process.
Answer: Confirmed.
4.0 Refer Section 4.1.3.2 and 4.1.3.3 :

4.1 PCs shall have latest clock speed available.


Answer: Confirmed.
4.2 Keyboard shall be industrial type.
Answer: Confirmed.

502084648.doc
32 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

4.3 Ethernet card shall be 10/100/1000 Base T.


Answer: Confirmed.
4.4 Pen drive / Memory stick (2 GB Min.) to be provided with each PC.
Answer: agree.
5.0 Refer Section 4.1.3.4. Large screen display shall be 69 / 70 inch
LCD/ plasma type. Indicate make, model No. resolution and other
technical details for the same.
Answer: Large screen display is 69 inch plasma type,detailed make,
model No. resolution and other technical details will be decided in BD.
6.0 Refer Section 4.1.3.5. HMI Server shall have hot swappable HDD,
DVD/CD-RW, redundant power supply and fan, industrial type
keyboard, SDLT drive and 19 inch TFT screen. RAM shall be
expandable to 8/16 GB.
Answer: We used Fault-tolerant Server, 17 inch TFT screen.
7.0 Printer models are to be selected adhering to the features specified in
General Specification VSP-6.3/GS-I-02.
Answer: Confirmed.
8.0 Refer Section 4.1.3.10. Historic data server shall have hot swappable
HDD, DVD-RW, industrial grade keyboard and 19 inch TFT screen.
Answer: Confirmed.
9.0 Refer Section 4.1.5. Please include all the functions mentioned under
Item No. B-2.3 of Section IV of Tender Enquiry Specification.
Answer: To be agreed,Corrected the documents according to the
Tender Enquiry Specification
10.0 Please include the following Special measurements :

i)
Peripheral gas temperature measurement at eight points for
assessing indirect flow profile.
Answer: Confirmed.
ii) AMANOSCOPE for monitoring charge and gas distribution to
be mounted on furnace dome.
Answer: Confirmed.
iii) RADAR type level measurement in BLT hopper
Answer: Confirmed.
iv) Digital encoders for the rotation and tilting mechanisms of
BLT to provide two independent inputs separately for the
interface cards (similar to ISN02) and separately received in
DCS / PLC system to fully support parallel processing of the
inputs.
Answer: Confirmed.
11.0 Please include Emergency panel in main control room with the
following functions:

Operation of furnace bleeder valves, back draft valve, hot blast


isolation valve, hot blast bleeder valve, stove valves, snort valve,
diesel pumps, fire water pumps, goggle valve on BF gas line, top
spray valve, emergency tank discharge water valves, main
charging conveyors, combustion air blowers, etc.
Answer: agree.

502084648.doc
33 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

Operation of mixer control valve, cold blast pressure control valve,


top gas pressure control and stove control valves through manual
loaders.
Answer: agree.
Indication of top gas pressure, BLT hoppers’ pressure, BLT
hoppers’ weight, Uptake temperatures, rotating chute angle, stock
level measurements, hot blast pressure and temperature, stoves’
gas and air flow, stoves’ dome temperature and waste gas
temperature, cold blast flow, primary and secondary cooling water
circuits’ flow, snort valve position etc.
Answer: agree.
Three Nos. six point recorders for critical parameters.
Answer: agree.
12.0 Please confirm features of UPS as specified under item No. B-1.6 of
SECTION–IV of Tender Enquiry Specification. However, battery shall
be SMF type lead acid.
Answer: Confirmed.
13.0 Refer Section 4.2.2.1. Please note that power will be made available by
the purchaser as indicated under item No. 1.8 of SECTION–III of
Tender Enquiry Specification and page 1 of 10 of Corrigendum to the
Tender Enquiry Specification.
Answer: Confirmed.
Tenderer’s scope of supply shall include Power distribution boards
with necessary transformer conversion stabilising and distribution
units (apart from the given power system) as required for feeding
power to all the equipment supplied by the tenderer. Bulk power
supply units shall be redundant.
Answer: Confirmed.
14.0 Refer Section 4.2.2.2. Please note that utilities like nitrogen, dry
compressed air, steam etc. shall be provided by the purchaser as
described in page 4 of 10 of Corrigendum to the Tender Enquiry
Specification. Pressure reducing arrangement as required shall be
included in Tenderer’s scope of supply.
Answer: Confirmed.
15.0 Equipment List for Instrumentation and control system (03-PRI-001-
24.0) will be discussed during the tender meeting.
Answer: agree.
16.0 For transmitters and electronics units located in open area, suitable
transmitter cubicles are to be provided.
Answer: Confirmed.
17.0 Refer Section 4.2.3.2. :

17.1 Instrumentation items shall conform to the General Specification No.


VSP-6.3/GS-I-01. Please confirm. Deviation if any, is to be pointed
out clausewise.
Answer: Confirmed.
17.2 For Radiation pyrometer – protection arrangement, local control panel
as required are to be included. Converter (with display) will be locally
mounted, which shall provide 4-20 mA DC signal to PLC.

502084648.doc
34 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

Answer: Confirmed.
17.3 Magnetic flow meters shall be separate electronics type.
Answer: agree.
18.0 Complete automation system for the Turbo blower shall be supplied
by the blower supplier. However one (1) no. remote I/O cabinet
alongwith 1.8 KM of fibre-optic cable shall be included for locating in
Turbo blower house. Supply and installation of remote I/O cabinet
and interconnecting cable as well as necessary co-ordination with
blower supplier for signal exchange shall be included in the scope of
the tenderer. One dedicated remote I/O cabinet shall be provided at
RMHS control room for interlocking with other systems (Sinter plant
and O&FS/CHP). No. of inputs/outputs to be considered is
approximately 300 for DI/DO and 50 for AI/AO. Space shall also be
kept in RMHS control room to install two (2 ) nos. remote I /O
cabinets (supplied by others) for sinter discharge conveyors and
O&FS/CHP conveyors
Answer: agree.
19.0 Please include Conventional control desk/panel with indicators
lamps push-buttons and switches etc as required for operating the
process during emergency. Semi-graphic mimics in all pump houses
having digital indicators and lamps are also to be included.
Answer: It will be discussed during the tender meeting.
20.0 The following items shall be included in tenderer’s scope of supply.
Please confirm :

20.1 Screened cables control cables, power supply cables,


thermocouple compensating cables special cables as required for
instrumentation.
Answer: agree.
20.2 Conduits cable trays tray supports junction boxes
cabling materials and accessories. GI perforated trays shall be used
for compensating and special cables. For screened and control cables
trays up to 300mm shall be GI perforated type and trays above
300mm shall be fabricated ladder type.
Answer: agree.
20.3 Erection hardware including impulse pipes and fittings
1st isolation valves ball valves piping accessories matching flanges,
companion flanges, matching stubs, thermowells, field instrument
mounting stands transmitter cubicles, canopies installation
materials and accessories.
Answer: It will be discussed during the tender meeting.
20.4 Necessary filters pressure regulators and other
accessories for instrument air connection to instruments and
pneumatic valves.
Answer: It will be discussed during the tender meeting.
20.5 Separate electronic earthing following methodology of
deep boring technique and panel earthing including construction of
electronic earth pits. Panel earthing shall be connected to electrical
earth grid.

502084648.doc
35 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

Answer: agree.
20.6 Ergonomically designed console for operator stations and
Engineering station.
Answer: agree.
20.7 Commissioning spares & consumables.
Answer: agree.
20.8 Special tools and tackles as required for testing and
commissioning .
Answer: agree.
20.9 List of spares for two (2) years normal operation.
Answer: Refer to annex sparepart.
21.0 Necessary instruments for measurement of pressure, flow,
temperature and analysis etc of all utility parameters at TOP shall be
included in Tenderer’s scope.
Answer: agree.

SCADA package will be procured by VSP separately. Parameters


required from blast furnace to SCADA system shall be finalized during
engineering. For connecting the BF automation system to the SCADA
system, tenderer shall supply and install one (1) no. OPC compliant
server / gateway alongwith required hardware and software in the
proposed network of BF automation. All the parameters required for
SCADA shall be made available in the OPC server / gateway at BF
end. Co-ordination with SCADA supplier for establishing seamless
integration shall be included in the scope of work.
Answer: agree.
22.0 Please confirm Equipment Specification, System integration test and
Performance test as specified under item Nos. B-3.0, 5.0 and 6.0 of
SECTION–IV of Tender Enquiry Specification.
Answer: Confirmed.
23.0 With reference to Section 3.15, please note that Selection and laying
of cables for Instrumentation shall be based on item No. 12.2 and
13.2 of General Specification No. VSP-6.3/GS-I-01.
Answer: Confirmed.
24.0 Please confirm that make of all indigenous items for Instrumentation
and Level-1 Automation system shall be selected from VSP’s preferred
vendors list. Also please indicate make and country of origin for all
imported equipment/ components.
Answer: agree.
25.0 Please submit filled-in Questionnaire.

26.0 Training requirement and List of spares shall be discussed during the
Tender meeting.
Answer: agree.
27.0 Please submit list of drawings to be submitted by the Tenderer during
Engineering.
Answer: Confirmed.

XVIII. LEVEL-2 AUTOMATION

502084648.doc
36 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

A. Scope of work

1. Furnish responsibility matrix in the following format clearly indicating


the scope of MCC/CISDI, Danieli-Corus and Mecon. Also indicate
whether MCC/CISDI, Danieli-Corus and Mecon have executed any
plant similar to the proposed automation system configuration and
functions including process models.
Answer: the 4350m3 blast furnace project of Taiyuan Steel & Iron
Company .china , the 4350m3 blast furnace project of benxiSteel & Iron
Company .china

Sl. Item BD BE DE FAT SUP E& W


No. C
Concept note and
functional/ system
1 MCC MCC MCC MCC MCC MCC MCC
requirement
specification

Hardware and
2 MCC MCC MCC MCC MCC MCC MCC
networking

Process models
3 MCC MCC MCC MCC MCC MCC MCC
software program

Application and
4 communication MCC MCC MCC MCC MCC MCC MCC
software program

Establishing
communication
links with
Laboratory
automation
5 MCC MCC MCC MCC MCC MCC MCC
system, Planning
computer system,
Plant SCADA
system and VSP
intranet

(BD - Basic Data, BE – Basic Engineering, DE – Detail Engineering, FAT –


Factory Acceptance Test, SUP – Supply, E & C – Erection, Integrated
testing & Commissioning, W – Warranty)

2. Section 7, item 7.2: The scope of work shall also cover co-ordination
with other system suppliers/concerned agencies for establishment of
links with external computers/systems.
Answer: OK

502084648.doc
37 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

B. Technical aspects

1. Section 2, Item 4.1.2.2: Confirm that the HMIs indicated under item
4.1.2.2 are common for both level 1 and level 2 systems.
Answer: CISDI will actualize HMI’s Common using for both level 1 and
level 2 systems, Rsview SE software will used to edit L1 and L2 HMI .
2. Section 2, Item 4.1.2.3:

i) Provide hot stand-by facilities (instead of warm back up) for the
servers as asked in tender specification.
Answer: agree
ii) VSP Intranet should also be connected through Web server (upto
the nearest node within battery limit).
Answer: agree
iii) Supply and laying of communication cables for connecting
laboratory system and the above VSP Intranet are to be
considered.
Answer: agree
3. Section 2, Item – 4.1.4:

i) Please note that the computer hardware and system/standard


software shall be of latest and well-tried type/version as will be
available during drawing approval stage.
Answer: YES
ii) Confirm supply of DVD-RW and SDLT as indicated in filled-in
questionnaire.
Answer: Agree
iii) The development station shall be supplied with DVD RW device.
Answer: Agree
iv) The make of the network switch should be selected from the
vendor list attached with tender document. Further confirm that
min. 20% spare ports should be available after implementation of
the complete system.
Answer: Agree
v) Confirm that all operating systems, antivirus, network
monitoring and other standard software will be supplied in
suitable media (DVD/CD) with licenses. No preloaded version
will be accepted.
Answer: Agree
4. Section 2, Item – 4.1.6:

i) The various process models as offered should be described


clearly indicating the following. Also furnish reference of
installations for such models.

502084648.doc
38 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

 Type of the models (on-line/off-line)


 Exact purpose/target of each model
 Model activation procedure
 Model input/output
 Explanations of the dynamic properties
 On-line adaptation facility
 Model constrain, if any
Answer: It will be elaborated in BE.
ii) Confirm that the hot stove combustion model will calculate
optimum operational conditions of individual hot stove for the
gas and blast period and will operate the stoves on-line. The
function will also help in reducing energy consumption
minimising the thermal stress onto the burners and the
refractory lining.
Answer: It will be elaborated in BE.
iii) Confirm that the proposed burden calculation model will help in
reducing the cost by means of automatic optimisation of burden
materials.
Answer: It will be elaborated in BE.
iv) Explain the features of the offered expert system indicating the
technology (knowledge based-fuzzy logic/else) with facilities for
providing advice to the user for process disturbances in advance.
Answer: It will be elaborated in BE.
v) No mention made regarding system administration and data
base management strategy to be followed. These need to be
described.
Answer: It will be elaborated in BE.
vi) Confirm inclusion of dynamic process mimics with status of
equipment. Actual layout/type will be decided during
engineering as per VSP’s requirements. Further note that crew
assignment at any particular shift must be available on
respective HMI screens.
Answer: OK
vii) Confirm that all reports will be fixed and/or free format (user
configurable) type. The number and contents of reports will be
discussed with VSP and finalised during engineering based on
their actual requirements.
Answer: Agree
viii) The following need to be indicated for the UPS system offered:
 Redundancy (in current sharing mode) and spare capacity
after commissioning
 Static and manual by-pass facilities
 SMF battery (lead acid) instead of Ni-Cd
 Supply of necessary distribution boards
 Make and type
Answer: L2 system will use the same UPS system with L1 system,
please refer to document of L1 UPS.
5. Item – Equipment List:

502084648.doc
39 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

i) The quantity of hard disk as well as hard disk array for


clustering to be corrected as 2 instead of 1.
ii) Necessary cabinet/almirah needs be supplied.
iii) Confirm that the cable length mentioned are indicative, which
will be supplied based on actual requirement.
iv) Viruswall shall also be supplied with hardware firewall.
Answer: Agree
6. Section 8, item 1 and 2:
i) Regarding level 2 system testing confirm the following:

 Test specification will be prepared (by the contractor) for


approval of VSP prior to conducting tests.
Answer: Agree
 Contractor will provide required personnel,
equipment/special instruments and test programs
including OTDR (optical time domain reflectometer) for
network testing.
Answer: Agree
ii) Indicate whether the performance guarantee test will be
demonstrated after implementation of application packages
including process models.
Answer: YES

7. Section 13, Filled in Questionnaire:


i) Confirm supply of source codes for process models and
communication modules along with application software as
mentioned.
Answer: The source codes for process models and expert system will not
be provided , but the source codes for communication modules along
with application software will be provided.
ii) The tapping management with continuous indication of metal
level in the furnace hearth as well as estimation of the iron &
slag tapping time/volume and preventive maintenance function
as confirmed have neither been included under section 2, item
4.1.6 nor described in the document. Please check and included
the same with their facilities/features.
Answer: It will be elaborated in BE.
iii) Include network management software and indicate make and
type of the same.
Answer:  The network management software will not be provided.
iv) The service to be rendered for 1 year during post warranty period
is not clear. Please clarify.
Answer:Change to 10years.
v) Confirm conformance of the following acceptance criteria:

502084648.doc
40 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

 System availability:  99.8% (calculated over a period of 7


working days)
 Network bandwidth utilisation: 10% maximum (5 minutes
average)
 Total capacity unallocated for auxiliary memory: At least
50% after commissioning
 CPU loading: 50% maximum (5 minutes average)
Answer: Agree
8. Item – ACS ‘Rotor’: The hardware specification including monitor size
and type should be the latest available during drawing approval stage
and similar to level 2 system.
Answer: YES
9. Automation system configuration, KT2006.035XT-01:

i) The system shall have fiber optic Ethernet backbone with 1


GBPS backbone. Also indicate the spare cores to be considered.
Answer: YES
ii) The core switch for interfacing with the external automation
system shall be provided with Layer-3 facilities.
Answer: YES
iii) Indicate the methodology to be adopted for the time
synchronisation of the complete automation system.
Answer: Use “net time \\computername” for the time synchronisation of
the complete automation system.
iv) Connectivity to VSP Intranet to be shown.
Answer: This System Connect to VSP Intranet by Web Server.
C. General

1. Section 9, Item 2: No mention made regarding training and


association of VSP personnel during software development for level 2
system. This needs to be included and the following shall be
furnished:

 Topics to be covered
a. Programming tool software;b. Database;c. Application Software.
 Number of people to be trained
a. Programming tool software training   5 person ; b. Database
training 5 person;c. Application Software training 5 person。
 Place of training
Chongqing,China
 Basic needed qualification of the persons to be trained
Know some knowledge of Windows System and network , know
some technical knowledge of blast furnace , have some experience of
program.
2. Section 10, Spare Part: Furnish list of spares for 2 years operation.
Also spares for HMI and printer not considered. Please check and
confirm.
Answer : OK

502084648.doc
41 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

3. Section 12, Consumables: Furnish list of consumables for level 2


system. This should be considered till PAC.
Answer : OK
4. Section 13, Special tools: Furnish list of tools for level 2 system.
Answer : None
5. Indicate the standards to be followed.
Answer: IEC,ANSI, VSP criterion.
6. Confirm supply of drawings and documents as specified in the tender
specification and furnish list of the same.
Answer: L2 system equipment design drawing and L2 shop drawing .
7. Confirm that any software updates during warranty period will be
supplied to VSP free of cost.
Answer: YES。

XIX. TELECOMMUNICATION

1.0 CCVM System :

i) Confirm that CCVM system shall be IP based colour system


and shall include IP camera with motorised pan & tilt head and
motorised zoom lens with remote control arrangement, cooling
and lens cleaning arrangement, IR filter (as and where
required).
Reply: MCC confirmed.
ii) Confirm cameras of baker high temperature region shall have
cooling arrangement and alarm annunciator.
Reply: MCC confirmed
iii) Confirm all the cameras of high temperature region shall have
auto retraction facility so that in case of alarm, the camera
shall automatically be retracted till the abnormality is restored.
Reply: only for baker high temperature ITV
iv) Confirm that alarm annunciator shall be provided for all CCVM
cameras in case of failure of power, air flow for lens cleaning
and camera cooling arrangement (wherever required).
Reply: MCC confirmed
v) Furnish details of special type of cable and local control box
used in high temperature region.
Reply: high temperature resistant cable 。 Silicon rubber
insulated flame retardant sheathed copper core cable. local
control box made in IP54 ,add the heat insulation material to
the heat part.
vi) Confirm that Server based Video recorder shall have memory
256MB, hard disc 80 GB.
Reply: MCC confirmed
vii) Confirm that IP based CCVM system will be interconnected to
Plant OFC backbone at a distribution point in Blast furnace
area for interconnection with other CCVM system in the plant.
Necessary cabling work and hardware for the same shall be
included in the scope of vendor.

502084648.doc
42 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

Reply: MCC confirmed


viii) Confirm that the software provided for the IP based CCVM
system shall ensure interoperability with other CCVM systems
when connected to Plant Optical Fiber Backbone. Furnish
details of software.
Reply: VSP may offer Plant Optical Fiber Backbone
require,MCC furnish details of software.
ix) Confirm that one monitor shall be provided at Area shop Office
including necessary cabling and hardware/software for viewing
all the cameras of the CCVM system.
Reply: MCC confirmed.
x) Confirm that one view finder of 5 inches diagonal display shall
be provided for manual adjustment of camera setting from
camera locations.
Reply: MCC confirmed.
xi) Confirm that all CCVM equipment shall have CE/UL approval.
Reply: MCC confirmed.
2.0 Loudspeaker Intercommunication System:

i) Furnish list of subscriber stations, their types (wall or column


mount / desk top) and locations.

List of Subscriber Stations


NO. Locations Type Units Quantity Loudspeaker

System for BF & Hot Stove


1 Central control room desk top set 1 3W~5W
2 Operation room of south casthouse desk top set 1 3W~5W
3 Operation room of north casthouse desk top set 1 3W~5W
Hot metal weighing detection
4 wall mount set 1 15W
device of south casthouse
Hot metal weighing detection
5 wall mount set 1 15W
device of north casthouse
Electrical room for north slag
6 wall mount set 1 3W~5W
granulating
7 South dewatering drum wall mount set 1 15W
8 North dewatering drum wall mount set 1 15W
9 BF top hydraulic station wall mount set 1 15W
10 Belt Conveyor platform wall mount set 1 15W
11 Sealing valve platform wall mount set 1 15W
12 Dust catche platform wall mount set 1 15W
13 The platform of BF Proper wall mount set 5 15W

502084648.doc
43 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

14 Hot blast valve platform wall mount set 1 15W


15 Burning gas bleeder valve platform wall mount set 1 15W
16 Flue valve platform wall mount set 1 15W
17 Area for combustion fan wall mount set 1 15W
18 Area for waste heat recovery wall mount set 1 15W
19 Main conveyor drive room wall mount set 1 3W~5W

total desk top set 3


wall mount set 20

PCI
1 PCI control room desk top set 1 3W~5W
wall mount
2 Coal pulverizer operation layer explosion- set 1 15W
proof type
wall mount
3 Coal feeder operation layer explosion- set 1 15W
proof type
wall mount
4 Raw coal bunker layer explosion- set 1 15W
proof type
wall mount
5 Dry gas generator operation layer explosion- set 1 15W
proof type
wall mount
Coal Powder Ventilator operation
6 explosion- set 1 15W
layer
proof type
wall mount
High Concentration Bag Filter
7 explosion- set 1 15W
operation layer
proof type

502084648.doc
44 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

total desk top set 1


wall mount
explosion- set 6
proof type

Raw system
1 Ore vibrating screen platform wall mount set 1 15W
2 fines bin wall mount set 1 15W
3 Coke vibrating screen platform wall mount set 1 15W
4 Intermediate stand wall mount set 1 15W
5 Coke room wall mount set 1 3W~5W
6 Ore room wall mount set 1 3W~5W
7 PCI room wall mount set 1 3W~5W
8 Return fines room wall mount set 1 3W~5W
9 Slag granulation room wall mount set 1 3W~5W

total wall mount set 12

Water treatment system


1 Water treatment electrical room desk top set 1 3W~5W
Clean circulating water pump shop\
2 wall mount set 3 15W
soft water pump shop\ water pool
Gas cleaning water treatment
3 desk top set 1 3W~5W
electrical room
Settling basin /Shop of water
4 supply pump for gas cleaning/ wall mount set 4 15W
sludge treatment plant

total desk top set 7 3W~5W

502084648.doc
45 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

wall mount set 45 15W

ii) Furnish block schematic diagram of Loudspeaker


Intercommunication system indicating locations of subscriber
stations, details of cables, interfacing equipment unit with
Plant telephone system and other PA system.
Reply: Next phase offer.
iii) Confirm that the Loudspeaker Intercommunication equipment
shall be Selective calling type with distributed amplifier
architecture.
Reply: MECON confirm.
iv) Confirm that each subscriber station shall have its own
amplifier and junction box with DP-MCB for power on/off.
Reply: MECON confirm.
v) Confirm that Central Control Unit shall have minimum 20%
spare capacity.
Reply: MCC confirm
vi) Confirm provision of separate Public Address amplifier and
loudspeakers for only announcement in certain areas is
included and furnish list of such locations.
Reply: MECON confirm.
vii) Confirm that communication matrix amongst the subscribers
shall be site-programmable with necessary
password/authorization code.
Reply: MECON confirm.
3.0 Wireless Communication system :

i) Furnish list of stationary and portable transceiver sets with


make, technical details, location of use etc.
Reply: Technical details offered by MECON

Configuration of the Wireless Communication system


stationary Portable
NO location remark
transceiver transceiver
1 Central control room 1

operation room of
2 1
south casthouse
operation room of
3 1
north casthouse

502084648.doc
46 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

4 PCI control room 1


water treatment
5 1
electrical room
gas cleaning water
6 treatment electrical 1
room
7 operator 44

total 6 44

ii) Confirm that VHF wireless system shall have required


hardware/software for interfacing with the Telephone exchange
of Steel melting Shop. This shall include necessary
interconnection cabling.
Reply: MECON confirm.
iii) Confirm that coordination and liaisoning work on behalf of VSP
with Wireless Planning Commission (WPC) for frequency
allotment including initial payment for licensing and royalty
shall be included in vendor’s scope.
Reply: MECON confirm.
4.0 Plant Telephone System:

Multipair jelly filled armoured telephone cable from the Plant


telephone network up to the battery limit of Blast Furnace will be
provided. The tenderer shall execute the distribution network within
the battery limit only including supply of Telephone instrument. In
view of above furnish following details regarding Telephone system.

i) List of subscribers with their locations.

User List of the Plant Telephone System


NO locations type units quantity remark
1 Central control room Plant EPABX, 3 One with
Shop EPABX recorder
2 computer room Plant EPABX, 2
Shop EPABX
3 casthouse room Plant EPABX, 2
Shop EPABX
4 PCI control room Plant EPABX, 2
Shop EPABX
5 BF elevator Plant EPABX, 2
Shop EPABX
6 water treatment electrical room Plant EPABX, 2
Shop EPABX
7 gas cleaning control room Plant EPABX, 2
Shop EPABX
8 electrical room for stockhouse Plant EPABX, 2
Shop EPABX

502084648.doc
47 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

9 Plant EPABX, 2
operation room of south Shop EPABX
casthouse
10 Plant EPABX, 2
operation room of north Shop EPABX
casthouse
11 Plant EPABX, 20
office Shop EPABX
12 Plant EPABX, 7
spare Shop EPABX

合计 48

ii) Make and technical details of CT boxes, cables, telephone


instruments etc.
Reply: Technical data are furnished by MECON.
iii) Consider two (2) telephone connections at each location, one
for Shop communication and the other for Plant
communication.
Reply: MCC confirmed.
iv) Confirm that multi pair telephone cable to be used shall have
20% spare pair capacity.
Reply: MCC confirmed.
5.0 General:

i) Confirm that basic information, basic engineering, detail


engineering, supply, installation, testing and commissioning of
Telecommunication system including Plant Telephone system,
CCVM system, Loudspeaker Intercommunication system and
VHF Radio communication system within battery limit shall be
included in the vendor’s scope.

ii) Confirm that all equipment, cables and accessories shall be of


VSP’s
approved make.

iv) Confirm that all offered telecommunication system equipment


shall conform to the ‘General specification for
Telecommunication System’ (VSP–6.3/GS-TC-01)

XX. CRANES & HOISTS

1. For maintenance of the EOT cranes, electric hoists shall be


provided.

502084648.doc
48 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

2. For operation and maintenance of the crane maintenance hoists,


platform with desired headroom, shall be provided around the
runway of the hoists. Please confirm.

3. The cranes and hoists required for plant maintenance shall be


operated through Radio Remote Control. Please confirm.

4. Please ensure that suitable headrooms and side clearances as per


above GS are available above the cranes.

5. Please ensure that all the equipment requiring maintenance, shall


be within the crane approach, considering oblique pulling of load is
not permissible.

6. Crane and trolley rails shall be selected from the Indian Crane rail
sections generally available in India.

7. Maintenance provision for all other cranes & hoists shall be kept
with suitable ladder/stair and platforms.

8. Suitable jib cranes or hoists shall be provided for the maintenance


of the equipment under the crane shadow area where crane
approach is not possible.

9. Please indicate the duty and standards followed for these cranes &
hoists. The cranes & hoists shall conform to relevant Indian
standards mentioned in GS.

10. Maintenance hoists having capacity of more than 5 T or having lift


more than 15 M shall be electrical type only. Please confirm.

11. The cast house cranes in Blast Furnace, are required in production
activities regularly as well as in maintenance. Therefore, these
cranes should be of heavy duty type as per IS:4137 and shall be
provided with air-conditioned cabin alongwith radio remote control.
Please confirm.

12. All cranes shall have VVVF drives with provision for micro speed.

XXI. WATER SYSTEM

1.0 Please confirm your acceptance to clause No. 4.0 (Plant &
Equipment) of Section-IX of technical specification and
include the same suitably in your offer.
Answer: There are some deviation listed in the deviation table.(equipment
supplied by MECON, MECON will confirm if the material of all the
equipment can be provided according to technical specification.)

502084648.doc
49 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

2.0 Please confirm inclusion of the complete water system as


detailed in Section-IX of Technical Specification in your
scope.
Answer: confirmed.
3.0 Please note and confirm that cooling tower shall be designed
for a wet bulb temperature of 29 deg C and cold water
temperature of 33.5 deg C.
Answer: No. 4.2.3 in Section-IX of Technical Specification, cooling
tower shall be designed for a wet bulb temperature of 29.5 deg C
and cold water temperature of 34deg C.We designed as this
requirement.
4.0 Please note that soft water make-up water shall be made
available at one point at the battery limit at a level of 13.7 m
(Approx.). Coordinate of soft make-up water line is
A+7044.00/B+1634.00.
Answer: We understand .
5.0 Please confirm that the water system shall be designed
considering zero discharge.
Answer: Confirmed.
6.0 Please confirm that the equipment specification is indicative
only and will be finalised during detail engineering.
Answer: confirmed.
7.0 Confirm inclusion of dewatering pit with pumps (1 W + 1 S) in
all locations where gravity drainage of seepage/leakage water
is not possible.
Answer: confirmed.
8.0 Regarding standby provision for various equipment. Please
confirm your acceptance to the specification requirement.
Answer: confirmed.
9.0 Regarding drinking water system, please confirm your
acceptance to clause No. 3.11 of Section-IX of Technical
Specification.
Answer: We already design the pump and the pressure tank, but we
don’t understand the cooling equipment mentioned in
specification and what it’s function.
10.0 Regarding service water system, please confirm your
acceptance to clause No. 3.12 of Section-IX of Technical
Specification.
Answer: Service water provide make-up water for clear water system
only, and the treated waste water provide make-up water for
floor washing and make-up water for the gas cleaning water
system and slag granulation water system etc. so we think the
pressure of service water is enough. there is no pump
considered for the service water.
11.0 Please confirm that the dimensions of the buildings are
indicative only and will be finalised during detail engineering.
Answer: confirmed.
12.0 Section-2, Clause No. 2.7.3 – Water Quality Requirements

12.1 Please indicate the outlet water quality from GCP.

502084648.doc
50 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

Answer: MECON will answer the question.

13.0 Section-2, Clause No. 6.5 – Water Based Fire Hydrant System

13.1 Regarding fire water system, please confirm your acceptance


to clause No. 3.10.1 & 3.10.2 of Section-IX of Technical
Specification.
Answer: MECON will answer the question about Fire Hydrant System
13.2 Please confirm that to cater to the requirement of gardening,
yard fire-fighting and miscellaneous consumers, a separate
network shall be provided in the yard using treated waste
water in line with clause No. 3.10.3 of Section-IX of Technical
Specification.
Answer: There is a separated treated waste water for the requirement
of gardening, yard fire-fighting and miscellaneous
consumers,
MECON will answer the question about Fire Hydrant System
13.3 Please indicate the number of yard fire hydrant (using treated
waste water) and shop hydrants in fire-fighting system which
will cover the entire blast furnace area.
Answer: MECON will answer the question.
14.0 Section-2, Clause No. 9.2.1 – BLT Circulating Water System

14.1 Regarding BLT circulating water system, please confirm your


acceptance to clause No. 3.5.1.4 of Section-IX of Technical
Specification.
Answer: We consider clear water BLT system instead of soft water
indicated in specification , In our opinion, the quality of
water in this system will get worse and worse during
using , it’s more economic using clear water than soft
water。The deviation is already listed in deviation table。
15.0 Section-2, Clause No. 9.2.2 – Closed Circulating System for
Soft Water

15.1 Please indicate the following:

a)
Outlet water pressure from consumers in Soft Water
System-I.
Answer: Outlet water pressure from consumers is about 0.27MPa
b) Outlet pressure of water from consumers in Soft Cooling Water
System-II.
Answer: Outlet pressure of water from consumers is about 0.44 MPa
16.0 Section-2, Clause No. 9.2.2.1 – Process Flow Diagram

16.1 Please explain the function of degassing tank in Soft Water Circuit I
& II.
Answer: It’s for degassing

502084648.doc
51 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

16.2 For soft water circuit, system leakage loss is indicated as 3%


of normal flow whereas calculation for make-up water
requirement is made considering 0.3% less. Please review.
Answer: According to our experience, the leakage loss of soft water
circuit is no more than 0.3%, we can consider the make-up
water requirement by 3% of normal flow if customer insists。
16.3 Please confirm that the expansion tank shall be gravity type
with nitrogen blanketing.
Answer: confirmed

17.0 Section-2, Clause No. 9.2.2.3 – Safety Water Supply

17.1 Please provide separate pumping arrangement for trickle


frilling of emergency overhead tank to avoid stagnation of
water.
Answer: In the water system we designed ,the very small flow will
pump to overhead tank from the circuit supply pump ,then the
overflow will flow to make-up water tank .This is recirculation of
water in the emergency, so the separate pump is no need.
The present system can avoid the stagnation of water.
17.2 Please confirm that the EOHT shall have nitrogen blanketing.

18.0 Section-2, Clause No. 9.2.3 – Indirect Water System

18.1 Please indicate the outlet water temperature from high and medium
pressure water systems.
Answer: Water temperature from high pressure water system is39 dec;
Water temperature from medium pressure water system is39
dec
19.0 Section-2, Clause No. 9.2.3.1 – Process Flow

19.1 Indicate the following:

a) Location of hot well and hot well pumps.


Answer: The hot tank of high pressure water system 、 low pressure
water system 、 the indirect cooling water for hot exchanger lies
the water treatment area , and the medium pressure water
systems are under the cast house。
b) Storage capacity of hot well.
Answer: (1)The capacity of hot well in water treatment area is1785m 3 ,
The effective capacity of the well is 1530m 3 .
The capacity of the hot well
=5min capacity of one pump +emergency water
=3160/60×5+1900×0.5/60×40=897m 3
(2) The capacity of hot well in water treatment area is1810m 3 ,
The effective capacity of the well is 684m 3 .
The capacity of the hot well
=5min capacity of one pump +emergency water
=1760/60×5+1560×0.5/60×40=667m3

502084648.doc
52 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

19.2 Return water scheme for the consumers (spray water for hearth,
water spraying in the late stage of campaign life, tuyere nose, level
detector, temperature probe, gas sampler, top spraying, TRT etc),
differs from the system envisaged in the specification. You are
requested to indicate reason for the same and also furnish the
reference list where similar system is in operation satisfactorily.
Answer: The return water scheme for the consumers are designed
according to the specification, return water flow to the hot well
first ,and then pumped to the cooling tower.
19.3 For the probe cooling, it is noted that ICW is considered in place of
soft water. Please indicate reason for the same and furnish
reference list where similar system is in operation.
Answer: We use the clean water as the icw in China.
20.0 Section-2, Clause No. 9.2.3.3 – Safety Water Supply

20.1 Volume of emergency water tower for indirect cooling water


circuit is indicated as 2000 cu m in the technical write up
(clause No. 9.2.3.3) and 2300 cu m in the questionnaire.
Please review.
Answer: After considering again, now ,the capacity of emergency water
overhead tank changed to 1154 cube meter 。 And the diameter
of the tower now is 13.6meter.
20.2 In the technical write up you have considered separate
collection tank for holding the return emergency water of
ICW. However, in the Technical Specification, return water is
considered in the hot well. Please review.
Answer: The emergency water of high pressure clear water will flow
the hot well in water treatment area ,and the emergency water
of hearth spay water will flow to the separate hot well which is
under the cast house.

21.0 Section-2, Clause No. 9.2.4 – BF Gas Cleaning Circulating


Water System

21.1 Regarding emergency condition of gas cleaning plant, please


confirm your acceptance to clause No. 3.6.3 of Section-IX of
technical specification and include the same suitability in
your offer.
Answer: DANIELI and MECON will answer it.
21.2 Clause No. 9.2.4.1 – Process Flow

a)
Please confirm inclusion of bowl rake classifier/spiral
classifier in the inlet water to waste water treatment plant
as per Technical Specification clause No. 4.5.1.8, 4.5.1.9,
4.5.1.10 & 4.5.1.11.
Answer: MECON will answer it
b) Please indicate the following:

502084648.doc
53 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

- Thickener surface overflow rate.


Answer: MECON will answer it
- Concentration of sludge withdrawn from thickener.
Answer: MECON will answer it
21.3 It is preferred to have filter feed pumps in place of gravity feeding
for better control over feeding rate. Please review.
Answer: MECON will answer it
21.4 In waste water treatment plant, please include automatic flushing
of thickener underflow lines in your scope.
Answer: MECON will answer it
21.5 Please indicate sludge storage tank capacity and retention time.
Answer: MECON will answer it
21.6 Belt filter is offered in place of disc filter for sludge dewatering.
Please furnish reasons with supporting document for taking such
deviation.
Answer: We do not understand the disc filter in sepcification, We often use
Vacuum Belt Discharge Rotary Drum Filter,If customer has some
specail requests about it, MECON will consider the design of this
part.
22.0 Section-2, Clause No. 9.2.5 – Water Circulating System for
Granulation Water

22.1 Regarding slag granulation water system, please confirm your


acceptance to clause No. 3.7 (slag granulation water system) of
Section-IX and include the same suitably in your offer.
Answer: DANIELI will answer it
23.0 Section-14, Clause No. 14.2 – Deviation and Option

23.1 Deviation against Clause No. 3.5.1.4 of Section-IX

a)
You are requested to furnish the reason for adopting clear
water as cooling media for gearbox cooling against soft
water. Also furnish the reference list where similar system
is in operation satisfactorily.
Answer: There is not necessary.
23.2 Deviation against Clause No. 3.9.2 of Section-IX

a)
The fast fill pump is required to take care of emergency
situation such as hose bursting etc. Please indicate how
such situation can be handled in absence of such pump.
Please review and include suitable pump in your scope.
Answer: There are three make-up pumps, one work and the other two
standby, in such situation mentioned above, all of the fast pumps
can be put into use. If emergency situation such as hose bursting
happen, maybe there is no enough soft water in soft make-up water
pipe, so even there is fast fill pump in the system, it is no use. In
China, in this situation, we use clear water or industry water
instead of soft water for this system.
23.3 Deviation against Clause Nos. 4.1.1 & 4.1.8 of Section-IX

502084648.doc
54 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

a)
Please indicate pump group where this will be applicable
indicating its tentative duty parameters. In case during
detail engineering it is observed that the type/speed of
pump as specified in the Technical Specification is not
available from any of the approve vendor, the matter will be
discussed and suitable alternative will be accepted.
Answer: It’s already indicated in the flow sheet and equipment list about the
each pump group andtentative duty parameters , we will provide
more detailed order list in detail design.
23.4 Deviation against Clause No. 4.2.1 of Section-IX

a)
Regarding cooling tower, the deviation is not accepted.
Please confirm that the cooling tower shall be cross-flow
type.
Answer: MECON will answer it
23.5 Deviation against Clause No. 4.5.1.8 of Section-IX

a)
Regarding bowl rake classifier, the deviation is not accepted.
This is a specific requirement for this project. Please revise
your offer accordingly.
Answer: MECON will answer it
23.6 Deviation against Clause No. 4.5.1.36 of Section-IX

a)
Regarding moisture in cake, the deviation is not accepted.
However, this point will be discussed during tender
discussion considering use of this cake in sinter plant.
Answer: MECON will answer it
24.0 Comments on Drawing

24.1 Please confirm that the flow diagram/P&I diagrams submitted are
preliminary in nature and will be finalised during detail
engineering.
Answer: confirmed.
24.2 Flow Chart of Soft Water Circuit System (drawing No.
KT2006.035SD-02)

a)
It is noted that you have considered soft water for hot blast
valve cooling in place of clear water. Please indicate the
reason for the same and furnish reference list of similar
installation.
Answer: Clear water tend to be scale.
b) Please indicate the staging height of expansion tank for
both soft water circuits.
Answer: Expansion tank of System Ⅰ lies in 27.2 meter level。

Expansion tank of System Ⅱ lies in 44 meter level。


24.3 Flow Chart of Clear Water Circuit System (Drawing No.
KT20060.35SD-03)

502084648.doc
55 of 58
M.N. DASTUR & COMPANY (P) LTD, KOLKATA 12th September 2006
24429-201B

a) Drawing is not legible. Please submit legible print of bigger


size.

b)
Please include air compressor for backwashing the side
stream filter in clear water flow circuit.
Answer: Air compressor will be added to the flowsheet
c) Please confirm that the emergency overhead tank for CW
and SW shall have N2 blanketing and trickle fill
recirculation arrangement.
Answer: confirmed
24.4 Flow Chart for Gas Cleaning Water System (Drawing No.
MEC/11/40/VIZAG/02)

a)
Please confirm inclusion of bowl rake classifier in waste
water treatment plant.
Answer: MECON will answer it
b) You have considered two (2) sludge storage tanks and
distribution well in waste water treatment plant instead of
one (1) sludge storage tank having 8 hours retention time.
Please review.
Answer: MECON will answer it
24.5 Please submit flow diagram/P&I diagram for GCP (proper) water
system.
Answer: The diagram will be submitted by MECON.
24.6 Please submit flow diagram/P&I diagram for SGP water system.
Answer: The flow diagram will be submitted by DENIELI
25.0 Regarding pipework, please confirm your acceptance to General
Specification for Pipework (VSP-6.3/GS-M-01) and clause No. 4.7 of
Section-IX of Technical Specification.
Answer: Concerning abour the material request,MECON will confirm If all
the pipework can follow the custermer’s request。
We can’t understand some requestment in No. 4.7 of Section-IX of
Technical Specification ,please explain it.( The technical
Specification will be discussed in the clarification.)