Professional Documents
Culture Documents
3X660 MW NKSTPP,
TANDWA, DIST- CHATRA, JHARKHAND.
NAME SIGNATURE
Page 1 of 7
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF GROUTING ON TOP OF COLUMNS
” AT ACC PROJECT SITE
TABLE OF CONTENTS
Sl.
Description Pg. No.
No.
1. Scope 3
List of major equipment
2. 3
SHIFTING OF CEMENT TO STORE &
3. From store yard to erection site 3
5. Safety measures 4
Page 2 of 7
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF GROUTING ON TOP OF COLUMNS
” AT ACC PROJECT SITE
1. Scope :
This method statement describes the procedure and inspection instauration
to be followed during the application of grouting work at top of the columns
of following major activities in ACC at project site:
Page 3 of 7
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF GROUTING ON TOP OF COLUMNS
” AT ACC PROJECT SITE
5. SAFETY MEASURES:
Page 5 of 7
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF GROUTING ON TOP OF COLUMNS
” AT ACC PROJECT SITE
PP rope
Cement bucket
Page 6 of 7
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF GROUTING ON TOP OF COLUMNS
” AT ACC PROJECT SITE
Page 7 of 7