3X660 MW NKSTPP,
TANDWA, DIST- CHATRA, JHARKHAND.
NAME SIGNATURE
Page 1 of 8
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF PAINTING
” AT ACC PROJECT SITE
TABLE OF CONTENTS
Sl. Pg.
Description
No. No.
1. Scope 1
3. Procedure 1
6 Safety measures 5
Independent scaffolding
7 7
Page 2 of 8
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF PAINTING
” AT ACC PROJECT SITE
1. Scope :
This procedure applies to all painting work at ACC
i. Scaffolding
ii. D – Shackle (for material lifting purpose)
iii. Wire rope sling
iv. Paint can
v. PP Rope
vi. Painting brush
i) Guide rope
3. Procedure:
1. Cleaning of surface will be done with wire brush before applying the paint.
2. Painting materials will be shifted from store to site and put on at ground
level in safe place. Required quantity of paint drums will be shifted from store
to site. Pants brush may be used as per the requirement. Paints bucket will be
required. Paints bucket will be handled carefully at ground as well as higher
elevation.
3. Workmen will go up and reach at the location through column ladder and
reach the particular location having scaffolding pipes covering particular area.
Aluminium ladders, tested rope ladders along with self-control grab arrestors
Page 3 of 8
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF PAINTING
” AT ACC PROJECT SITE
5. Proper mixing of the paint will be done at ground and same will be lifted to
the location with the help of rope 25 /19mm with 2MTcapacity D-Shackle will
be used. Hot activity will not be allowed.
6. Paint drum of 20/25 litres will be lifted to the location of painting area with
the help of rope 25mm/20mm with D-shackle with proper locking System for
higher elevations.
I. Independent scaffolding (images at last page no :7) should be used for the
painting.
Page 4 of 8
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF PAINTING
” AT ACC PROJECT SITE
a) Hot work not allowed in top are when painting working time.
b) Proper stacking of painting
c) Use correct manual handling techniques
d) Area should be barricade, remove the barricade after paint is dry on material
e) Fire extinguisher must be available
f) Spillage occurs in working time area should isolated
6 . SAFETY MEASURES:
Page 5 of 8
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF PAINTING
” AT ACC PROJECT SITE
o) Pick and bundle and wooden boxes, wooden supports, scraps material and
plastic others combustible material will remove in case of fire incident collect
and send to scrap yard.
p) Proper safety net should be used
q) RFA (retractable fall block arrester) should be used.
r) Scaffolding and, PPE should be as per standard, scaffolding tag should be
used in every scaffold
s) Proper illumination should be done in all job area
Page 6 of 8
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF PAINTING
” AT ACC PROJECT SITE
7. Independent scaffolding
Page 7 of 8
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF PAINTING
” AT ACC PROJECT SITE
Page 8 of 8