Professional Documents
Culture Documents
3X660 MW NKSTPP,
TANDWA, DIST- CHATRA, JHARKHAND.
NAME SIGNATURE
Page 1 of 7
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF TANDEM LIFTING AND SHIFTING OF MATERIAL
” AT ACC PROJECT SITE
TABLE OF CONTENTS
Sl.
Description Pg. No.
No.
1. Scope
5. Safety measures
6 Tandem calculation
Page 2 of 7
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF TANDEM LIFTING AND SHIFTING OF MATERIAL
” AT ACC PROJECT SITE
1. Scope :
This procedure applies to all tandem lifting and shifting operation like non-routine
lifting, shifting and routine lifting, shiftingof following major activities in ACC at
project site:
Page 3 of 7
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF TANDEM LIFTING AND SHIFTING OF MATERIAL
” AT ACC PROJECT SITE
5. SAFETY MEASURES:
Page 4 of 7
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF TANDEM LIFTING AND SHIFTING OF MATERIAL
” AT ACC PROJECT SITE
XII. Visual inspection of lifting accessories before putting in use for ensuring
healthiness of the same.
XIII. Fitting of all the safety devices in cranes like as hook lifting latch, hoist limit
switch, boom limiting switch, braking system, TPI certificate, rope condition
& application of lubricants etc.
XIV. Proper functioning of all the safety devices fitted in cranes.
XV. Cordoning off erection area by safe distance.
XVI. That crew members should be experience enough.
XVII. That nobody should be under suspended load and crane’s boom/rope
crossing area.
XVIII. Minimum persons should be engaged for lifting.
XIX. After getting clearance from the signalman for lifting, all persons should
move away from lifting area.
XX. Tag line persons should handle the load by maintaining safe distance from
the lifting area.
XXI. The levelled ground where cranes shall be used.
XXII. Provide warning systems such as cautionary safety signage.
Page 5 of 7
BHAVANI ERECTORS PVT LTD.
Site – 3X660MW NKS Thermal Power Project
METHOD STATEMENT OF TANDEM LIFTING AND SHIFTING OF MATERIAL
” AT ACC PROJECT SITE
x. Clean properly crane/ equipment and machine and surrounding area after use .
xi. Return all hand tools / wire rope/ PP rope to store
6. Tandem calculation
F1 F2
a b
Equilibrium condition:
F1+F2=P SOF2=P-F1
b) the sum of the moments acting on an object must be zero
F1x (c-a) = F2 x (I-b-c)
F1 x (c-a) = (P-F1) x (I-b-c)
F1 x (c-a) = (P x (I-b-c) – (F1 x (I-b-c)
F1 x (c-a + I - b- c) = P x( I-b-c)
F1= P x(I-b-c)/(-a+I-b)
Page 7 of 7