You are on page 1of 2

,

Ref No : CHN/POG/Tripping lC-421


00 0s g5= Date: 1 7 FEB 20tr
EVEI{T ANALYSIS REPORT
UNIT NO : 7 ITPS: Chandrapur Super Thermal Power Station Unit Capacity: 500 MW
1. *HO Code: Station Code: CSTPS U7 Time- Date- No. of days from last
T10 20r4-L5 2I:44 Hrs 28l0rl20Ls sync.:- 3.0
Last Overhaul (AOH) synchronisation Date 02108120L4 L79.5 Days 0.49 Years
2. Operating conditions at the time of Event ,-
Load MW Coal Cycles in seruice Oil Suppoft
340 CD, GH, JK Nil
3. Nature of Event :
Unit withdrawn due to turbine shaft vaibration very high,(Turbine Brg./cv/rotor/bal)
4. Name of First Up, Main Protections & protection on which eCA trippe*
TTurbine hand tripped from control room, Generator tripped on revere power protection, Boiler tripped on RH
Protection.

5 A) Obseruations :-
Unit was running at 340 MW @ 22:L2 Hrs, TG set bearing and Shaft vibrations found increasing eventhough all
other parameters were normal. So as to reduce the vibrations load was reduced to 180 MW, but the vibrations
were found increasing.
As the vibration level were increasing continuously (HPT front shaft : 200 Microns), Turbine was hand tripped @
22:32 Hrs.

5 B) Remedial Action/work done :-


Boiler lighted up after found vibrations normal & synchronisation activities started.

6. Root Cause Analysis :-


Matter is being continuously conveyed & follow up to M/s BHEL after each incidence, for this matter is conveyed
for detailed analysis as per ref. CHNrIM-II/U2000301 dated zgl}tlz1t' & CHNfTM-filU7lOOO334 dated
30/0U2015. CE (TIC), Nagpur & M/s BHEL representative visited U-7 on 03.02.2015, collected vibrations reading,
report will be submitted after detailed analysis,
7. Preventive action suggested (Shoft Term) l_
I

Vibrations are being monitored continuously.


8, Preventive action suggested (Long Term) :- Nil

9. Similar event occurred last time:


Unit withdrawn due to turbine shaft
vaibration very high.(Turbine
u# 7, 425 MW Time L7:56 Hrs Date: 2510L120L5
=
Brg .lCY lrotor/bal)
9A. Implementation Status of Long Term/Sho* Term measures stated at Sr No 9:-
Long Term
Short Term - Vibrations are being monitored continuously.

{
10. Boiler lighted up Time - 23:08 Hrs Date- 2810L120L5

11. T-A Set Synchronised Time - 01:11 Hrs Date- 2910L120L5


L2. Remark :- Nil

13. Recommendations of Works Section:


1. Procurement/Replacement Plan:
2. Operational Error:
3. Delay in Maintenance:
4. Delay in bringing back the Unit:
5. Training of Staff:
6. Whether remedial action is completed satisfactory & point is closed :