5 A) Obseruations :-
Unit was running at 340 MW @ 22:L2 Hrs, TG set bearing and Shaft vibrations found increasing eventhough all
other parameters were normal. So as to reduce the vibrations load was reduced to 180 MW, but the vibrations
were found increasing.
As the vibration level were increasing continuously (HPT front shaft : 200 Microns), Turbine was hand tripped @
22:32 Hrs.
{
10. Boiler lighted up Time - 23:08 Hrs Date- 2810L120L5
CEIDy C E (Works)