Presentation by DR - Muhammad Salim Site Incharge Underground Coal Gasification, Project Thar
Presentation by DR - Muhammad Salim Site Incharge Underground Coal Gasification, Project Thar
By
Dr.Muhammad Salim
Site Incharge
Underground Coal
Gasification, Project Thar
No
Source
1 Coal Based
2 Oil Based
3 Gas Based
%
41.61
5.63
20.87
No
4
5
6
Source
Nuclear
Hydro Power
Others
%
13.75
15.57
2.25
Source
Coal Based
Gas Based
Oil Based
%
54.6
13.0
0.9
No
4
5
6
Source
Hydro Power
Nuclear
Others
%
22.8
2.9
7.9
Source
Coal Based
Gas Based
Oil Based
%
2.27
4.50
58.37
No
4
5
Source
Hydro Power
Nuclear
%
32.54
2.23
Surface
gasification
Underground
coal
gasification
Construction
Investment
45006000
Rs. / m3
15002000
Rs. / m3
Gas cost
5.08.0
Rs. / m3
2.03.5
Rs. / m3
Cost of Electricity
Temperature 200-550oC
Temperature 550-900oC
Reduction Zone
Oxidation Zone
Coal
CH4 + H2O
CO + CO2
+ H2 O
CO + H2
+ O2
CO2
CO2 + C
2CO
+1/2 O2
CO
H2 + C
CO + H2O
CO2 + H2
CO +1/2O2
CO2
Hydrocarbons
CO + 2H2
Coal + O2
CO2 + CO + H2O
CH4
39.27%
11.09%
10.97%
47.64%
30.14%
0.72%
4937 BTU/Nm
Syngas H2 O2 N2
By Air
16 0.2 58
%
By 60% 30 0.0 30
Oxygen
CH4
3.5
CO
5
CO2
17.5
HV
945Kcal/Nm
15
21
1710Kcal/Nm
US $ = 115.6 million
( Rs. 9883.6 million)
US $ = 9.10million
( Rs. 789.0 million)
US $ = 12.51 million
( Rs. 1095.0 million)
Project Milestone
b. Main Machinery ( All purchases under Sindh PPRA rules )
S. No.
Description
Date
Status
Air compressor
( process)
15 8 2010
Expected delivery
(15 1 2011)
Not delivered
Air compressor
( Process) placed to the
second lowest for
Hitachi Compressor
after negotiation at the
lowest cost. Expected
date of delivery -- Third
Week of April 2011..
18 2 2010
(Expected date of
Delivery Third Week of
April 2011..)
3.
Air compressor
(Startup)
15 12 - 2010
Expected delivery
(15 4 2011 )
Project Milestone
a. CIVIL WORK
S.
No.
Description
Date
Status
Acquired about 27
acres
Land Acquisition
2 7 - 2010
Residential Colony
90 % complete
17 7 - 2010
( 39,312 sq. ft )
1 11 - 2010
60 % complete
( 27,756 sq. ft. )
Others works
Installation of High Pressure compressor
Installation of 2 Nos. fuel Tanks 19000
liter capacity each.
Installation of Cooling Towers.
Installation of 100 KVA Generator at
residential colony.
SITE
April, 2010
Welding of Surface
Piping
Surface Piping
Well Head
Assembly
Well Head
Assembly
Diesel Generators
COLONY
June, 2010
COLONY
June, 2010
COLONY
April, 2011
COLONY
April, 2011