Project: PTD 168045 (ot TR-2.2), Johor Bal, Joho. Pun Cove)
VASCO SCAFFOLD SDN. BHD.
(90820.%)
Lot 674, batu 2, Jalan Batu Tiga, (Sg Rasah), 41900 Kang, Setangor D.E.
Tol :603-33423813 Fax : 603-33490723,
Design Calculation
For Falsework
(Vasco 60 Shoring System)
of Level 4 Transfer Beam
(Tower 1 -Gridline T1-2 to T1-3/T1-B to T1-C &
Tower 2 -Gridline T2-2 to T2-3/T2-G to T2-H)
Project : Cadangan Pembangunan Perniagaan Berstrata Bercampur
Di Atas PTD 166945 (Plot TR-2-2), Mukim Pulai, Daerah Johor
Bahru, Johor Darul Takzim.
Contractor : JM Construction Sdn. Bhd.
02 SEP 2015en Projet: PTD 466946 (Po R22) Johor Bah, har (PA Cove)
‘The purpose o his design calculation note sto vary the loads on the Vasco 60 Shoring System as
falsewark or Level transfer bear of Tower 18 2
‘Tha design of alsework & back prop are based on the follwing standards.
i) BS EN'12812 "Falsework- Porlrmance requirements and general design’,
i) BS 8878 "Code of Practice for rlaawor
i) MS 1482 "Speccaton for Stes! Frame Szalolaings",
iv) Other relevant documents or tat reports
2) Bearing Capacity of Vasco 60 Shoring System
From Test Repor,
Untimate Bearing Capacity of Stardard.eg = 169.10 kNiLeg
‘3)Design Calculation
‘Ad) Check Capacity of Vasco 60 Shoring System fs Falsework
‘Use 15mx 1m Tewer with Linkage tm (Seeonal Linkage 1.0m)
DL.Up To Beam 5.82m(Wxt 75m¥10) & 7.028m{W)rt 80)
unten) = (Use oe xcevioaxsaxas rai
Satta > (uiimexesrian es : ae
fm Geugaetserexes eee
Setmiage = Seros aoe
Tot Lend tag rare
fewytacer = ONTO 822 *
{np To Beam 22m. 76-180
Us dns Toe anager akag 070)
come aaaa) ase ease Pe eoar
sorter” = ikecanees sae
fom tae ait
Sire SEAMS Be
Tot ond ep ew
saniyracer = veegorTTas 8 22> a0 «
Aa.Vasco60/ Stel Frame Scafolding As Back Prop
ie tn baan
a ee eer sac Fron Read
saa + axqaxan 1» ssco m
Sate means ERIE, eee |
fi Datura TRgE ts gee |
Penge toca ee Se |
Dea ara ti srexaseo) 00! |
Teatro tino reed + eam) sm sorta
1 Bick rp tobe provided rem LGZt0L3
ck Soacing of Fame Reaured
aa = axqaxsy = e400 mm
Soret nme aes rae) 2 eke |
tow Due Lode wiangeran en
‘oll mposed toad on tsfocr aor 1Projet: PTD 100845 (Pet TR-2-2), Johor Bah, Johor (Eton Cove)
autztoLs
Use Steal Frame @ Spacing= 0487 male
Lead rm pper oor 6200 nt
ins Doig ive Loss = 18xe@sr9) (540) Nim
Tell inpored Lond on he foe below eco
ta Son e200 XCasT x1 219101572 193918
SafetyFactor = 3675/1999 = > 15 2K,
buuttotz
Use StelFrame@ Spacre* 061 mmcle
tom pe sor = 5640 Mun
ins Design ve Lon = 16xe519 = (560) iin
Total imposed Lod on fe foe blow S00 wr
Usad Stands 5640 KO X(1218001592 sein
Seluy Factor = 2875/ 2058 = 18 > 15 OK.
ustoLt
UsesieelFams @ Spachy> —_06t mmclo > 18
Load tom upper tor = 5080 ku?
‘Mus Celgn lve Load = 18x 2505) = coe ie
‘Tot impoeed Los on te oar blow =i
ond/Standaré = S080 KOSI X(1210%0.8)2 = nate
SaleyFacor = 878/720 = 47 > ox
GF tous
UseSioeiFame @ Spacro* 061 mmelo > 15
ood rom pe oor. = 4600 0m
Mins Desig Lv Lose = 18x 25105) = an int
Tal impoae Lod on efor bow 4120 Nr
Lond Stars 4500 08K X(.21940.8)2 = i921
Safety Factor = 9675) 1921 = 18 > 15 OK.
Lt to
UseStes!Fame @ Spacing= 061 mmete > 15
Lead fem wpe oor = 4s200Nme
ins Doig Live Lose = 18x@505) (480) wn
Teal imposes Loud on efor below =o
Load Standard = 44:20 X08 X(.21940,80)2 > 720M
Safely Factor = 9675) 1720 = 24 > 18 2K.
eqLa2totat
GseSteeFrame @ Sacra 0815 mele > 15
{ad rm ype oor = 1840 Wit
Minus Design Live Lond = 18X@5+08) = (4.80) WN |
‘oa nposed Load on efor bow =e
oee/ Senda S640 X84 X(t 21003892 > Baw
Safety Factor = 9678) 2290 = > 1s on.‘A3) Check Punching Shear On The Sia"
5
‘Max Load Log (tr am A), PL 5
eto sab
‘Ss Thickness 125 on
Sobor Rebar = T4000 mm cle
‘Cone Cover
ore Sago
aa 25-20-5
ba
Teaie29Bs0110, ve = 050 Ninn?
PPurching Soar Parimoter=180x4+42X 100 =
‘Aloanbe misinum Load = veX Parmeter Xe
‘con
9000 i
‘Actual mesimum ead on he sandanieg of hong =
[Atte fece ot aded are, he shearsess.v =
agen" =
Puching Shear Sass Checks» allowais) =
‘Load From Back Prop (Steel Frame)
Max, Load Leg er em 2 0) Dy PL :
Detaled
Slab Tnewness = 125mm
BotomRebsr —~ T¥0300mn le
Cone Cover) = 20mm
Gore. Grae = 30 Nn
aeie5-20-5 > 400mm
tos = 0.36 Nin?
Tobias 9us0110, ve = 050 Nin?
Punching Shear Parimoler=s20xAst2x 100. =
‘Atowablo masirum Load ~ vox PainetrXa
econo
2 MatOD kN
‘Acti maxim oad on he eandaeg of hing =
‘Alte ace oaded wea, the staarevees.y =
peu)"
Posting Shes Sess Check=> valle) =
779818
1800
77988
7798 x30
438Ninn?
420Ninn?
assaN
1680 mm
2a56 x0!
Tx
438 Nin?
428Nina?
PTO 186045 (Pt TR-22), Johor Bas Joa, Puter Cow)
90.004N
190 Ninn
130 Ninn?
4.00 «N
022 Ninn?
020Nieteae
see
oot pty
gery
gery
Pt PTD ee 7820). Bas or Pa oe)
27238 te at
(ss Foo
BER
fone ore
asi
BER
oyPret PTD 85 Pt 28 Ban he Paes Ce)
peers
ee eee ne
Fact ei Most asa tay rae
Faas niu St 1 BERS emer
ent Bde ont + tem sara aa,
‘wae Sr oe DAT 2 ae Be
‘oat D7eem Vm SE
Face man amet S gabe ster tam
Fated onan hee extern
na og ane = sum > orm ok.
‘wate ea Demi” > Stai oe
‘wae sn 1mm 2 oarem | B
svetmoad
SS
cau Fasut cow t np
1 Sohn
tug See sestonTEST
REPORT‘TWST REPORT
REPORT NO.: 2007¢81593
‘ect Ret
Sarita by asco MARKETING SDN,
Frome Trane for Vico Sharing Sytem
Nominal Ste 0m leigh) 1-5 (at)
Exeral Diamstir See
Wall Thisknes| 30mm
Meta of Tet
Conpresson Tes on Frame
Veo
Copniesson Teton Tama
Maximum Compression Load were aplied onal
ofthe sumpes of T-Fiame species unt 1) 16065 kat
Tare or buckle 2) 18075 kat
3) 16315 gt
Average 16818 kat
15 nov 200