<< Rabigh Phase-lI Petrochemical-1 Project (CP2)>>
‘th Floor, Ere New Building 2, Yangpyeong-Dong 4 ga, Youngdungpo-Gu, Seoul, 150-868, Korea
“Tel: +82 2 2163-0840 Fex: +82 2 2163-0648
CP2 Document Transmittal To DAELIM
To: : Contract No.(OOK}: | 6600030688
eateries Pecreaendsttva Contract No.(l ‘6600030687
Deslim industriel Co.Ltd. TransmittalNo: | X-PMT-CP2-1826
Reference N¢ X-CP2-PMT-2400
Prepared Date: 03 July, 2014
Responsible Eng.: _| Mohammed Abdulqader
The following documents have been:
“APPROVED*without comments.
a N: “NOT ACCEPTABLE”
[L]B: “APPROVED? with minor comments
oO
F: “NOT SUBJECT FOR APPROVAL”
Oo
Oo
R: °REVISE AND RESUBMIT" with comments [-] NC: "No Comment”
[5] we: swith comment?
[21 Marked on attached documents [| None
J trformation Record
Revise & Re-submit Reference
Note: CP2 PMT would Ike to submit attached documents/ drawings to DAELIM.
No. of copy | Drawing/Document no. | Rev. Descripton/Tite
i \AP-OZ7 |__| 1AP-027 Gycione Separator (R-207-2151-2171-TRE)
Company Reply:
CONTRACTOR may proceed with the engineering and construction work upon project specication, epphcable
regulation and standard compliance in this document. COMPANY review will not relieve CONTRACTOR'S
‘engineering, procurement and construction responsibilities. COMPANY will notify if eny noncompliance has been
‘observed during due diligence reviews and engineering audit
PLEASE RETURN A COPY OF TRANSMITTAL WITH YOUR SIGNATURE CONFIRMING YOUR RECEIPT OF
‘THE DOCUMENT.
aaah
DATE: ge pare: 14 JUL 2014
receiven By 3/—-— ISSUED BY: Abduisattar ALKhatib, Company Representative
oat ane
(an \ g
awory NK LZF
SIGNATURE: sionaturty
x —
Bae Ou
4 (Qutgoing|
i 74 JUL 20
——EH.Son
Rabigh I-CP2BAELIM Rabigh Phase Il Petrochemical Project
Petrochemical-2 Package (CP2) Nylon-6
‘9th Floor, Ere New Building 2, Yangpyeong-Dong 4 ga, Youngdungpo-Gu, ‘Seoul, 150-866, Korea
Tel’ +822 2163-0622 Fax: 1822 2163 0519
Daelim Document Transmittal To Company
Contract No.(00K) | 6600030688
Daelim Job No: 11028¢
Transmittal No: | X-CP2-PMT-2400
Date: 27 June. 2014
Due Date: 11 July. 2014
Discipline: awac’
Required Reply | Yes(O) / NO( )
The following documents;
1 Originals (0) (~ Ors.) Copies (c) (each) E-files (E) ( 2 CDs)
‘Are Transmitted :
& For Approval (FA)[] For Review (FR) C_ For information (Fi) C) For Construction (FC) [I For Design (FD)
D Comments Required For Vendor Documents (CR)
Priority of reply:
1H Normal OHigh
No. | Document Number | Rev. Document Title Remarks
IAP-027 Cyclone Separator
i Lactate (R-207-2181-2171-TRE)
Notes
Yong-il, Cho
Contractor Representative\ 3)
yicho@daelim.co.kr
Please acknowledge the receipt and return a copy.