You are on page 1of 2
aupeo Rebgh Bogan xeauton Departrent Rabigh -il Program Execution Department << Rabigh Phase-lI Petrochemical-1 Project (CP2)>> ‘th Floor, Ere New Building 2, Yangpyeong-Dong 4 ga, Youngdungpo-Gu, Seoul, 150-868, Korea “Tel: +82 2 2163-0840 Fex: +82 2 2163-0648 CP2 Document Transmittal To DAELIM To: : Contract No.(OOK}: | 6600030688 eateries Pecreaendsttva Contract No.(l ‘6600030687 Deslim industriel Co.Ltd. TransmittalNo: | X-PMT-CP2-1826 Reference N¢ X-CP2-PMT-2400 Prepared Date: 03 July, 2014 Responsible Eng.: _| Mohammed Abdulqader The following documents have been: “APPROVED*without comments. a N: “NOT ACCEPTABLE” [L]B: “APPROVED? with minor comments oO F: “NOT SUBJECT FOR APPROVAL” Oo Oo R: °REVISE AND RESUBMIT" with comments [-] NC: "No Comment” [5] we: swith comment? [21 Marked on attached documents [| None J trformation Record Revise & Re-submit Reference Note: CP2 PMT would Ike to submit attached documents/ drawings to DAELIM. No. of copy | Drawing/Document no. | Rev. Descripton/Tite i \AP-OZ7 |__| 1AP-027 Gycione Separator (R-207-2151-2171-TRE) Company Reply: CONTRACTOR may proceed with the engineering and construction work upon project specication, epphcable regulation and standard compliance in this document. COMPANY review will not relieve CONTRACTOR'S ‘engineering, procurement and construction responsibilities. COMPANY will notify if eny noncompliance has been ‘observed during due diligence reviews and engineering audit PLEASE RETURN A COPY OF TRANSMITTAL WITH YOUR SIGNATURE CONFIRMING YOUR RECEIPT OF ‘THE DOCUMENT. aaah DATE: ge pare: 14 JUL 2014 receiven By 3/—-— ISSUED BY: Abduisattar ALKhatib, Company Representative oat ane (an \ g awory NK LZF SIGNATURE: sionaturty x — Bae Ou 4 (Qutgoing| i 74 JUL 20 ——EH.Son Rabigh I-CP2 BAELIM Rabigh Phase Il Petrochemical Project Petrochemical-2 Package (CP2) Nylon-6 ‘9th Floor, Ere New Building 2, Yangpyeong-Dong 4 ga, Youngdungpo-Gu, ‘Seoul, 150-866, Korea Tel’ +822 2163-0622 Fax: 1822 2163 0519 Daelim Document Transmittal To Company Contract No.(00K) | 6600030688 Daelim Job No: 11028¢ Transmittal No: | X-CP2-PMT-2400 Date: 27 June. 2014 Due Date: 11 July. 2014 Discipline: awac’ Required Reply | Yes(O) / NO( ) The following documents; 1 Originals (0) (~ Ors.) Copies (c) (each) E-files (E) ( 2 CDs) ‘Are Transmitted : & For Approval (FA)[] For Review (FR) C_ For information (Fi) C) For Construction (FC) [I For Design (FD) D Comments Required For Vendor Documents (CR) Priority of reply: 1H Normal OHigh No. | Document Number | Rev. Document Title Remarks IAP-027 Cyclone Separator i Lactate (R-207-2181-2171-TRE) Notes Yong-il, Cho Contractor Representative\ 3) yicho@daelim.co.kr Please acknowledge the receipt and return a copy. Se2IORE Lear td

You might also like