Target:
Tests shall demonstrate the Black start capability of complex. When 11KV power supply
loosed, black start DEG will generate power supply GT and auxiliary load for start.
The procedure is following:
Start condition:
1)
2)
3)
4)
5)
6)
7)
Open 220 kV breakers D2Q1 and D2Q3, #1.#2 main transformer low voltage
start
9)
Start-up sequence
1 Start emergency DEG, supply power to GT MCC and other necessary load.
2 start black start DEGs, supply power to 11kV section I,
3 Close low voltage auxiliary transformer TR-01 HV break, energize for TR-01
4 Close low voltage auxiliary transformer TR-01 LV break, energize for 415V section I
bus bar.
5 Take out the PT fuse of DEG control panel
6 Energize for 415V section III bus bar.
7 Following are necessary load during startup:
GT MCC
demin water pump
LP feed water pump
air compressor (standby)
HSD pump
burner cooling fan
GT cooling water pump
industry water pump (standby)
GT close circle water pump
8 Start GT start motor
9 After GT start motor start, black start DEG will supply to some other load.
10
11
a)
b)
c)
From MKVI send command for close GT GCB J1Q1, GT automatic excite,
increase the voltage to 100%. If can excite manually, manually excite will be
selected preferentially.
12
A.
B.
insulation breakerD3Q11D3Q12and
15
16
17
18
Change over load from 11KV section I bus bar to 11KV section II bus bar
19
20
Close 11KV section I inlet switch and take 11kv bus bar quick change over
system in
21
to
service
Put back the fuse of DEG control panel, change over 415V sectionbus bar load
415V section III bus bar ,emergency DEG will automatic stop
22
23
24
25
Close D1Q31 and D1Q32 isolators, close line1 outlet breaker D1Q3
26
Note:
At hot condition, HRSG HP drum feed water filling shall operated as following:
1. Within 2 hours after the boiler is stopped, the rapid cooling should be avoided and
make it in the closed state. During this period, its not allowed to fill water or
discharge water; the steam/water valves should be closed tightly.
2. After two hours, the certain opening can be opened to the atmospheric relief valve
for pressure relief. During the pressure relief, please pay attention to that the
material temperature difference of the boiler drum shouldnt surpass 40;
3. When the pressure of the boiler drum is dropped nearly to 0 MPa and the water
temperature of the boiler is less than 80, please open water discharge valves
and air valves of everywhere to discharge water.
4. At emergency condition, when the pressure of the boiler HP drum is dropped to less
than1 MPa , LP feed water pump can be started and fill water to HP drum, but
must control that the drum material temperature difference shouldnt surpass
40;