UEM SUNRISE BERHAD

INTEGRATED
STANDARD OPERATING PROCEDURES
SITE MEMO

Doc. Ref. :

UEMS/ISOP/PI/F10

Rev. No.

Issue Date :

25 September 2013

Page No. :

1 of 1

PROJECT

: CADANGAN PEMBANGUNAN BERSTRATA 5 BLOK PANGSAPURI 12 TINGKAT, KEDAI KOS


SEDERHANA RENDAH 1 TINGKAT (108 UNIT) DAN KERJA-KERJA INFRASTRUKTUR DI ATAS
LOT PTD 2375, MUKIM TANJUNG KUPANG, DAERAH JOHOR BAHRU UNTUK TETUAN
NUSAJAYA HEIGHTS SDN BHD

TITLE

: REMOVAL OF SYSTEMATIC PLUMBING CONTRACTOR SDN BHD

REFERENCE NO

: NHSB(N)/DD/C-KIMLUN/PTD2375/SITEMEMO/037(15)

SUPERINTENDING
OFFICER
REPRESENTATIVE

DATE :

18-Aug-15

: EN. SANIMAN MD APANDI

CONTRACTOR

: KIMLUN SDN BHD

TO

: MR ARTHUR ONG

Dear sir,
Refer to the above, we were been inform that Systematic Plumbing Contractor Sdn Bhd has been
remove from Denai Nusantara site.
We wish to highlight that this plumber is competent and responsive during this period of
construction. For now, there are no NCR or Site Memo have been issued out from our side for
plumbing works.
Nevertheless, to change plumber for this project will disturb the schedule of work which leads to
delay due to the introduction of plumber to understand the sequence and momentum of works at
Denai Nusantara site.
We hope that the Systematic Plumbing Contractor Sdn Bhd shall be remain on site until the
completion of the project.
Your acknowledgement and attention is very much appreciated.

Signature

Receiver

Name

: Hj Saniman Md Apandi

Name

Position

: Deputy General Manager

Position

Company

: Nusajaya Heights Sdn Bhd

Company

cc

- KPK Quantity Surveyors (Semenanjung) Sdn Bhd


- Contract Dept., UEMS